Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAccepted-AOC | L1 | Accepted-AOC L1 ACCEPTED | |
| 2 | L2₹32.8 L+₹2.9 L (9.53%)Rejected-Finance | L2 | Rejected-Finance L1 ACCEPTED | |
| 3 | L3₹35.3 L+₹5.3 L (17.6%)Rejected-Finance | L3 | Rejected-Finance L1 ACCEPTED |
Tender Value
₹30 L
EMD Value
₹10,000
Closing Date
25 Apr 2025, 5:00 pmClosed
CHIEF OFFICER
VADGAON NAGARPANCHAYAT
Under the Swachh Bharat Mission (Urban) activitiesinclude raising awareness about cleanliness throughinformation, education, andcommunication
2025_DMA_1170911_1
VNP/2025/SWACHABHARAT
Open Tender
Consultancy
Item Rate
365 days
VADGAON NAGARPANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹10,000
VADGAON NAGARPANCHAYAT
16 Jun 2025
16 Apr 2025
26 Apr 2025
16 Apr 2025
25 Apr 2025
16 Apr 2025
16 Apr 2025
Amount
InterPersonalCommunication
Daily Planning of Swachh Bharat and Swachh Survekshan related awarenss activity as per the SBM 2.0 guidelines and SS Toolkit Location Covered : Homes, Gated Society, Residential Area, Public Places, Schools, Colleges etc
Weekly Conducting Awarness Campaigns Targated Group : Self Help Groups (SHGs), Local Groups, NGO, Stakeholders, Schools, Colleges etc.
Monthly Identification and Recongnition 1.Swachhta Brand Amabasador 2. Swachhta Champion 3. Best Sanitary Worker
Monthly Training and Capacity Building 1.Swachhta Brand Amabasador 2. Swachhta Champion 3. Sanitary Worker 4. ULB Staff
Monthly Training and Capacity Building 1.Swachhta Brand Amabasador 2. Swachhta Champion 3. Sanitary Worker 4. ULB Staff
Digital media:- a. Social Media Engagement Strategy and Planning b. SBM awreness Post promotion on various Digital and Social Media Platform c. Strategy Development: Creation of a detailed social media strategy tailored to SBM IEC objectives. d. Content Creation: Development of engaging and educational awarness content (posts, infographics, videos). e. Content Scheduling: Regular posting schedule across all major platforms (Facebook, Twitter, Instagram, Linkedin). f. Community Management: Active engagement with followers, responding to comments and messages. g. Campaigns and Challenges: Launching and managing social media challenges and campaigns to drive participation. h. Influencer Collaboration: Partnering with influencers to broaden reach and impact. i. Analytics and Reporting: Monthly performance reports with insights and recommendations.
Mass media:- a. Creation of the ULB Swachhata Anthem and its promotion across digital and social media platforms to enhance outreach and engagement b. Creation and promotion of a ULB Swachh Bharat awareness short film to boost public engagement and awareness c. Creation and promotion of a ULB Swachh Bharat Work City documentary to highlight cleanliness initiatives and achievements
Spot Development 1. GVP Spot Deveolpment (Red and Yellow Spot) : Installation of Fiber Sculpture in to identified GVP Site Speciofications : a. Height 4 ft-7 Ft b. Material : Fiber c. Colour : RGB 2.Installation of Artistic concrete base for Sculpture: (Approximately): Base Height: 6 ft. Base length and width: 5*5 ft (As per Sculpture Size) 3. Design and Development of landscaping for Sculpture: Designing Installation of Railing / Fencing Plantation/ Development of Garden Preparation of Foundation / Base for Landscaping Miscellaneous
Best from Waste 1.Preparation of Artefacts from Scrap /New Material including the following: Artistic Designing for Sculptures. Fabrication of the Scrap metal into sculptures as per design. Transportation of prepared sculptures to the installation site. Approx. Height : 5-10 Ft 2.Installation of Artistic concrete base for Sculpture (Approximately): Base Height: 6 ft. Base length and width: 5*5 ft (As per Sculpture Size) 3. Design and Development of landscaping for Sculpture: Designing Installation of Railing / Fencing Plantation/ Development of Garden Preparation of Foundation / Base for Landscaping Miscellaneous
Wall Painting:-Providing and applying plastic emulsion paint of approved quality, colour and shade to Bd new surface in three coats including scaffolding, preparing the surface. (excluding primer Num coat) etc. complete with SBM creativity and artistic SBM theme
KK Solutions (BID ID -6630029)
G Solutions and Company (BID ID -6627046)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .