| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.4 L+₹1.3 L (14.3%)Rejected-Finance | ₹10.4 L+₹1.3 L (14.3%) | L2 | Rejected-Finance Rejected (Highest) |
| 3 | L3₹10.6 L+₹1.4 L (15.7%)Rejected-Finance | ₹10.6 L+₹1.4 L (15.7%) | L3 | Rejected-Finance Rejected (Highest) |
| Sl No | Description | Qty | Unit | sarbjeet singh katoch L3 | MAYANK JASWAL GOVT CONTRACTOR L1 | M/S. SHANKRA GOVT CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation in trenches in earth work in pick work, jumper work within all leads and lifts stacking the excavated soil not more than 3 mtr clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc., consolidating each deposited layer by ramming watering and then disposing of all surplus excavated earth as directed within all leads and lifts as per direction of Engineer-in- Charge. | 1,287.75 | Per/Cum | 290 ₹3,73,447.5 | 255 ₹3,28,376.25 | 250 ₹3,21,937.5 Lowest |
| 2.00 | Providing and laying cement concrete 1:6:12 (1Cement:6sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work foundation and plinth in all leads and lifts as per the direction of Engineer-in-Charge. | 1.04 | Per/Cum | 4,000 ₹4,160 Lowest | 4,000 ₹4,160 Lowest | 5,020 ₹5,220.8 |
| 3.00 | Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | 3.7 | Per/Cum | 4,200 ₹15,540 Lowest | 4,500 ₹16,650 | 5,500 ₹20,350 |
| 4.00Providing and laying cement concrete work 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | ||||||
| 4.01 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge. | 3.59 | Per/Cum | 6,500 ₹23,335 | 6,000 ₹21,540 Lowest | 7,000 ₹25,130 |
| 4.02 | In walls (any thickness) but not less than 0.10 Metre thickness including attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto any floor level within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge. | 10.78 | Per/Cum | 7,000 ₹75,460 | 5,500 ₹59,290 Lowest | 7,000 ₹75,460 |
| 4.03 | Suspended floors, roofs, landings and shelves and their supports, balconies, beams ,griders bressumers and cantilevers upto all floor level. | 3.18 | Per/Cum | 7,200 ₹22,896 | 6,500 ₹20,670 Lowest | 7,500 ₹23,850 |
| 5.00Providing and laying cement concrete work 1:1:5:3(1 Cement:1:5Sand:3 crushed stone aggregate 20mm nominal size) and curing complete excluding cost of form work in | ||||||
| 5.01 | (a) Lintels, beams ,griders bressumers and cantilevers upto all floor level. | 0.08 | Per/Cum | 7,000 ₹560 Lowest | 7,300 ₹584 | 8,600 ₹688 |
| 6.00 | Random rubble stone masonry coursed with hard stone of approved quality in foun. & plinth i/c racking out of joints in CM 1:6 in all leads & lifts | 7.2 | Per/Cum | 4,000 ₹28,800 Lowest | 4,900 ₹35,280 | 6,000 ₹43,200 |
Tender Value
₹14.6 L
EMD Value
₹29,265
Closing Date
17 Aug 2026, 11:00 amClosed
Executive Engineer
JSV Divn Indora
CO Pump house,CO13 Nos Outlet,CO Delivery Tank and laying jointing and testing of 110 mm,160mm 180mm dia HDPE pipe in distribution system tube well NO 21 at Chuharpur
2026_HPIPH_140720_5
EE-JSV-NIT-3336-66 dated 06-08-2026
Open Tender
Civil Works
Item Rate
Indora
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹29,265
19 Sept 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in trenches in earth work in pick work, jumper work within all leads and lifts stacking the excavated soil not more than 3 mtr clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc., consolidating each deposited layer by ramming watering and then disposing of all surplus excavated earth as directed within all leads and lifts as per direction of Engineer-in- Charge. | 1,287.75 | Per/Cum | 107 | ₹1,37,789.25 |
| 2 | Providing and laying cement concrete 1:6:12 (1Cement:6sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work foundation and plinth in all leads and lifts as per the direction of Engineer-in-Charge. | 1.04 | Per/Cum | 108 | ₹112.32 |
| 3 | Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | 3.7 | Per/Cum | 109 | ₹403.3 |
| 4Providing and laying cement concrete work 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 4.01 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge. | 3.59 | Per/Cum | 111 | ₹398.49 |
| 4.02 | In walls (any thickness) but not less than 0.10 Metre thickness including attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto any floor level within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge. | 10.78 | Per/Cum | 112 | ₹1,207.36 |
| 4.03 | Suspended floors, roofs, landings and shelves and their supports, balconies, beams ,griders bressumers and cantilevers upto all floor level. | 3.18 | Per/Cum | 113 | ₹359.34 |
| 5Providing and laying cement concrete work 1:1:5:3(1 Cement:1:5Sand:3 crushed stone aggregate 20mm nominal size) and curing complete excluding cost of form work in | |||||
| 5.01 | (a) Lintels, beams ,griders bressumers and cantilevers upto all floor level. | 0.08 | Per/Cum | 115 | ₹9.2 |
| 6 | Random rubble stone masonry coursed with hard stone of approved quality in foun. & plinth i/c racking out of joints in CM 1:6 in all leads & lifts | 7.2 | Per/Cum | 116 | ₹835.2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_208788.xls
BOQ • 12.24 MB
forms.pdf
Tender Documents • 2.29 MB
terms.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .