| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC Accepted Vide Resolution No.2(1) dtd.16/09/2025 of Sreekandapuram Municipality |
| 2 | L2₹3.4 L+₹18,831.60 (5.90%)Rejected-AOC K P ABOOBACKER SREEKANDAPURAM MUNICIPALITY SREEKANDAPURAM P D JOSEPH | ₹3.4 L+₹18,831.60 (5.90%) | L2 | Rejected-AOC HIGHER RATE AND NOT ADMITTED |
| 3 | L3₹3.4 L+₹19,234.07 (6.02%)Rejected-AOC | ₹3.4 L+₹19,234.07 (6.02%) | L3 | Rejected-AOC HIGHER RATE AND NOT ADMITTED |
| 4 | L3₹3.4 L+₹19,234.07 (6.02%)Rejected-AOC KANNUR KERALA 670631 | KANNUR | KERALA | 670631 | ₹3.4 L+₹19,234.07 (6.02%) | L3 | Rejected-AOC HIGHER RATE AND NOT ADMITTED |
| Sl No | Description | Qty | Unit | K P ABOOBACKER L2 | K K THAMBAN L1 | JOSE JOSEPH L3 | MUHAMMED SKAR V P L3 |
|---|---|---|---|---|---|---|---|
| 1.00TARRING WORKS | |||||||
| 1.00 | 3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 86.4 | cum | 64 ₹5,529.6 | 60.4 ₹5,218.56 Lowest | 64.04 ₹5,533.06 | 64.04 ₹5,533.06 |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 28.8 | cum | 2,318 ₹66,758.4 | 2,188.03 ₹63,015.26 Lowest | 2,319.8 ₹66,810.24 | 2,319.8 ₹66,810.24 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 43.2 | cum | 3,503 ₹1,51,329.6 | 3,305.53 ₹1,42,798.9 Lowest | 3,504.6 ₹1,51,398.72 | 3,504.6 ₹1,51,398.72 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 288 | sqm | 80.2 ₹23,097.6 | 75.65 ₹21,787.2 Lowest | 80.21 ₹23,100.48 | 80.21 ₹23,100.48 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 288 | sqm | 18.7 ₹5,385.6 | 17.69 ₹5,094.72 Lowest | 18.76 ₹5,402.88 | 18.76 ₹5,402.88 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 288 | sqm | 291 ₹83,808 | 275.29 ₹79,283.52 Lowest | 291.87 ₹84,058.56 | 291.87 ₹84,058.56 |
| 1.01 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 3.84 | cum | 608 ₹2,334.72 | 576.5 ₹2,213.76 Lowest | 609.91 ₹2,342.05 | 609.91 ₹2,342.05 |
Tender Value
₹3.4 L
EMD Value
₹8,466
Closing Date
2 Sept 2025, 6:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER, SREEKANDAPURAM MUNICIPALITY
PROJ.NO192/25-26. TARRING WORKS FOR KATTAI KARNGAPADI ROAD IN SREEKANDAPURAM MUNICIPALITY
2025_LSGD_789845_3
PW1-4013331-2025
Open Tender
Civil Works - Roads
Item Rate
180 days
SREEKANDAPURAM MUNICIPALITY
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,466
Yes
26 Nov 2025
26 Aug 2025
9 Sept 2025
26 Aug 2025
2 Sept 2025
26 Aug 2025
Amount
TARRING WORKS
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
K P ABOOBACKER (BID ID -2316086)
MUHAMMED SKAR V P (BID ID -2317499)
JOSE JOSEPH (BID ID -2319600)
Bidder Name
K K THAMBAN
K P ABOOBACKER
JOSE JOSEPH
MUHAMMED SKAR V P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1301953.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .