Loading…
Loading…
Tender Value
₹85,000
EMD Value
₹1,700
Closing Date
24 Aug 2026, 4:00 pmClosed
Executive Engieer RnB Division Kulgam
Executive Engieer RnB Division Kulgam
Construction of Crossing at Tak Mohalla Yaripora near Hanfia Jamia Masjid at MC Yaripora
2026_PWDJK_320828_5
56/2026-27/RnB/Kul/5321-31 Dtd 13-08-2026
Open Tender
Civil Works
Percentage
10 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
No 0470010200000099
₹1,700
13 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means including dewatering in irencies for foundations, drains, pipes, cables etc. (noi exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed | 3.17 | Cum | 419.49 | ₹1,329.78 |
| 2 | Disposal of excavated material for a lead of less than 1 Km | 3.17 | Cum | 112.87 | ₹357.8 |
| 3 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | 0.73 | Cum | 2,206.51 | ₹1,610.75 |
| 4 | Providing and laying of stone soling (hand packed) Including spreading watering , compacting in foundation trenches all complete. | 0.33 | Cum | 762.71 | ₹251.69 |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.26 | Cum | 4,560.68 | ₹1,185.78 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.96 | Cum | 5,778.52 | ₹22,882.94 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.29 | Cum | 6,828.04 | ₹8,808.17 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. | 219.03 | Kgs | 108.01 | ₹23,657.43 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete | 6.51 | Sqm | 251.03 | ₹1,634.21 |
| 10 | Suspended floors, roofs, landings, balconies and access platforms | 8.46 | Sqm | 629.64 | ₹5,326.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_1068045.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .