| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹33.3 L+₹4,129.47 (0.12%)Rejected-AOC | L2 | Rejected-AOC l2 |
Tender Value
₹33.5 L
EMD Value
₹66,960
Closing Date
7 Feb 2024, 12:00 pmClosed
executive engineer
rampur canal division rampur
Estimate for Construction of Box Culvert at km 16.651 of Upper Kosi Canal in Tehsil Sadar, Distt. Rampur.
2024_UPIDC_888531_4
03/EE/2023-24
Open Tender
Civil Works
Item Rate
120 days
rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹66,960
14 Feb 2024
2 Feb 2024
7 Feb 2024
2 Feb 2024
7 Feb 2024
2 Feb 2024
Amount
Dismantling brick or stone masnory in lime or cement including stacking within 60m including Labour T&P etc completion of work as directed by Engineer - incharge
Dismantling CC Work including Labour T&P completion of work as directed by Engineer - incharge
Collection, cleaning, and stacking of old bricks including , Labour T&P etccompletion of work as directed by Engineer - incharge
Earthwork excavation in foundation in dry soil(loam clay or sand ) including lift upto1.50m and lead upto 30 m and including back filling ,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer in charge
Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Centering & shuttering for R.C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc.
Two coat painting over abuetment cap with bitumen @0.85kg per Sqm. In each coat including supply of all materials,labour and T & P etc. required proper completion of work.
Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete.
Supplying & fixing of P.V.C. Pipe 75 mm dia in weep hole behind stem of box culvert with all cost of material, T&P and labour complete.
Premould joint filler 25mm thick /m2 including supply of all materials ,labour and completion of work
Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Finishing wall with two coat of water proof cement paint weather coat of approved quality on previously new treated surface this paint to give an even shade i/c cost of all materials,labour ,T&P etc. complete
Supplying and laying coarse sand in graded filter including cost of all material, labour and T&P etc. complete
Supplying and laying of graded filter 4-10 mm including cost of all material, labour and T&P etc. complete
Supplying and laying of graded filter 10-20 mm including cost of all material, labour and T&P etc. complete
Old Brick work 1:4 Cement,Coarse sand inciuding all cost of material,labour T & P etc including cost of all materials , Labour T&P etc complete.
Providing Struck Deep Cement Pointing in 1:2 cement mortar including cost of all materials , Labour T&P etc complete.
Providing 12mm thick plaster in 1:4 CM including supply of all materials ,labour and completion of work.
SS BUILDERS AND CONSULTANT
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .