Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹3,255
Closing Date
28 Sept 2026, 3:00 pmDue tomorrow
ASSISTANT ENGINEER_EGCSD_PWD
EDEN GARDENS CONSTRUCTION SUB DIVISION_NETAJI INDOOR STADIUM CAMPUS_SHAHID KSHUDIRAM BASU SARANI_KOLKATA 700 021
Shifting of some unnecessary books an waste materials from various places of Main Building to the temporary store room placed behind the car garage and clearing of dust and soot from the ceiling walls floor stair and other different place of Main bui
2026_WBPWD_5022792_4
WBPWD/AE/EGCSD/NIeT-03/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
WEST BENGAL LEGISLATIVE ASSEMBLY
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,255
Yes
28 Sept 2026
8 Sept 2026
30 Sept 2026
9 Sept 2026
28 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying labour for shifting of books and other mislanus works at Assembly Building. | 344 | Each | 321.19 | ₹1,10,489.36 |
| 2 | Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. a) 3.90 metre height | 28 | Each | 332.51 | ₹9,310.28 |
| 2.01 | b) Extra for additional 3.6 height or part thereof | 8 | Each | 291.99 | ₹2,335.92 |
| 2.02 | This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly. For shifting: 3.90 metre height | 244 | Each | 33.25 | ₹8,113 |
| 2.03 | Both side shifting : Extra for additional 3.6 height or part thereof | 36 | Each | 29.2 | ₹1,051.2 |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(e) Extra for staging beyond 4 m in any floor (Mode of measurement: area in plan x mean height of staging upto soffit of shuttering above initial 4 m) | 384 | Sq.m. | 72.7 | ₹27,916.8 |
| 4 | Cleaning glazed tiles with acid | 297 | Sq.m. | 11.92 | ₹3,540.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
wbf2911.pdf
Tender Documents • 1.86 MB
BOQ_5105173.xls
BOQ • 0.26 MB
1st_Corr.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .