Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
5 Feb 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Damnagar Nagarpalika, Dist : Amreli
Construction Work of Protection Wall in Ward No.3, Dhasa Road Sitaramnagar Ashram At, Damnagar. Under M.P Grant Year 2025-26
268780
30/2026
Open
Civil Works
Amreli
3 documents required · 3 mandatory
₹600
Chief Officer, Damnagar Nagarpalika
₹4,500
22 Jan 2026
22 Jan 2026
22 Jan 2026
5 Feb 2026
22 Jan 2026
NAME OF WORK :- CONSTRUCTION WORK OF PROTECTION WALL
Location : Ward No.3, Dhasa Road Sitaramnagar Ashram, Damnagar.
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Excavation for foundation up to 1.5 mt. depth including sorting out and
stacking of useful materials and disposing of the excavated stuff up to all
lead and sretta 44.06 157.15 Cumt
Providing and laying cement concrete 1:3:6 (1 cement : 3 coarse sand :
machine cut stone aggregate 40mm nominal size) and curring complete
including cost of formwork in (a) Foundation and plinth 4.41 3094.70 Cumt
Providing and laying controlled cement concrete M.200 and curing
complete including the cost of formwork but excluding reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concrete 9.31 4118.64 Cumt
Providing and laying controlled cement concrete M.200 exposed work
with curing etc. complete including the cost of formwork but excluding the
cost of reinforcement for R.C.C. work in (B) COLUMNS:(ii) Having
cross-sectional area more than 0.08 Sq.M and upto 0.18 Sq.M 2.85 12577.32 Cumt
Providing and laying controlled cement concrete M.200 exposed work
with curing etc. complete including the cost of formwork but excluding the
cost of reinforcement for R.C.C. work in (A) BEAMS: (ii) Having cross-
sectional area more than 0.08Sq.M and upto 0.12 Sq.M 3.15 9485.95 Cumt
Providing and laying cement concrete M-200 and curing complete
including cost of formwork in (A) Wall Caps / Coping 2.51 5130.80 Cumt
Filling available excavated earth(excluding rock in trenches plinth, sides
of foundation etc,) in layor not exceeding 20cm. In depth consolidating
each depo sited layer by ramming and watering. 26.20 136.91 Cumt
Providing TMT Bar FE 500D reinforcement for R.C.C. work including
bending, binding and placing in position complete upto floor two level 1602.00 77.28 Kg
Brick work using common burnt clay building bricks having crushing
strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:5. (1- Cement : 5 -fine sand) (B) Conventional 11.08 4245.09 Cumt
20mm thick sand faced cement plaster on walls up to height 10 mtrs.
above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1
cement : 3 sand) and 8mm thick finishing coat of C.M. 1:1 (1 cement :
sand) etc. 204.85 342.41 Sqmt
Finishing wall with weather proof exterior emulsion paint on wall surface
(two coats) to give an required shape even shade after thoroughly
brushing the surface to remove all dirt, and remains of loose powdered
materials.etc complete 204.90 120.26 Sqmt
Providing & fixing M.S. grills of required pattern to wooden frames of
windows etc. with M.S. flats at required spacing and frame all-round
square or round bars with round headed bolts and nuts or by screws. (A)
Plain grill 360.00 106.23 Kg
Applying priming coat over new steel and other metel surface after and
including preparing the surface by throughly cleaning, oil,grease, dirt and
other foreign matter and scoured with brushes fine steel wood, scrapers
and sand paper with ready mixed priming paint brushing red lead. 12.00 36.74 Sqmt
Painting two coats (excluding priming coat) on new steel and other metal
surface with enamel paint, brushing, interior to give an even shade
including cleaning the surface an even shade including cleanicn the
surface of all dirt, dust and other foreign matter. 12.00 92.20 Sqmt
Total Amounts Rs...……
Total Amounts Rs...……
I/We am/are willing to carry out the work @ ________% Above / Below_____________Percentage (should be writen in
figures and words) of the Estimated rates mentioned above amount of my / our Tender works out as under.
Estimated Amount Estimated Amount
Put to Tender Rs. 4,46,476=00 Put to Tender Rs. 4,46,476=00
Add ..............% Rs. Deduct %Rs.
Total Rs. Total Rs.
(In Words (In Words
Stamp with Signature of Contractor
Consl.Engineer Engineer
"DESIGN POINT" Damnagar Nagarpalika
Amreli Damnagar
Chief Officer President
Damnagar Nagarpalika Damnagar Nagarpalika
Damnagar Damnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Tender.pdf
02 Form B-1.pdf
03 Schedule B.pdf
04 DRG and Section.pdf
05 Terms and Conditions.pdf
06 Specifications of Building Work.pdf
07 Vendor Civil work.pdf
08 Test Require for Construction Material.pdf
09 GR All.pdf
09.1 DMO_2876_01-May-2025_273.pdf
10 GR Affidavit GR_240217_161336.pdf
Download all tender documents and submit your bid