Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.1 LAdmitted-Finance KALIBARI BAZAR TUPKHANA PART I PO ARUNACHAL P S SILCHAR DISTT CACHAR ASSAM 788 025 | SILCHAR | CACHAR | ASSAM | 788025 | ₹47.1 L | L1 | Admitted-Finance |
| 2 | L2₹48.7 L+₹1.6 L (3.48%)Admitted-Finance | ₹48.7 L+₹1.6 L (3.48%) | L2 | Admitted-Finance |
| 3 | L3₹50.5 L+₹3.4 L (7.32%)Admitted-Finance | ₹50.5 L+₹3.4 L (7.32%) | L3 | Admitted-Finance |
| 4 | L4₹50.7 L+₹3.6 L (7.58%)Admitted-Finance | ₹50.7 L+₹3.6 L (7.58%) | L4 | Admitted-Finance |
| 5 | L5₹53.1 L+₹6.0 L (12.8%)Admitted-Finance | ₹53.1 L+₹6.0 L (12.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | m/s builders and suppliers L4 | M/S SANJIB DEB L1 | M/S M P Sharma L2 | M/S TAPAN KUMAR RAY L5 | MAGADH TRADING L8 | LUIT CONSTRUCTION L7 | M/S SUBHAM ENTERPRISE L6 | SHRI YOUNUS KHAN L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00B & R Division Items | |||||||||||
| 2.00 | Demolition of Concrete of any description and in any position not otherwise specifically provided complete all as specified and directed. | 0.68 | Cum | 900 ₹612 | 700 ₹476 Lowest | 750 ₹510 | 999 ₹679.32 | 1,014 ₹689.52 | 980 ₹666.4 | 920 ₹625.6 | 999 ₹679.32 |
| 3.00 | Surface dressing n. exc 15 cm deep and getting out in soft /loose soil complete all as specified and as directed. | 263.2 | Sqm | 42 ₹11,054.4 | 40 ₹10,528 | 41 ₹10,791.2 | 46 ₹12,107.2 | 50 ₹13,160 | 38 ₹10,001.6 Lowest | 42 ₹11,054.4 | 45 ₹11,844 |
| 4.00 | Excavating over area n. exc. 1.50mtr in depth for foundation etc and getting out in soft/loose soil etc complete all as specified and directed. | 8.67 | Cum | 369 ₹3,199.23 | 370 ₹3,207.9 | 372 ₹3,225.24 | 375 ₹3,251.25 | 380 ₹3,294.6 | 368 ₹3,190.56 Lowest | 370 ₹3,207.9 | 368 ₹3,190.56 Lowest |
| 5.00 | Excavation in trenches not exceeding 1.50 m wide and n.exc 1.5 m in depth for foundation of column, wall etc, not exc 10 sqm on plan and getting out in soft/loose soil etc complete all as specified and directed. | 28.39 | Cum | 400 ₹11,356 | 400 ₹11,356 | 402 ₹11,412.78 | 415 ₹11,781.85 | 422 ₹11,980.58 | 395 ₹11,214.05 | 416 ₹11,810.24 | 380 ₹10,788.2 Lowest |
| 6.00 | Excavation in trenches not exceeding 1.50 m wide and n.exc 1.5 m in depth for foundation of column, wall etc, not exc 10 sqm on plan and getting out in hard and dense soil etc complete all as specified and directed. | 6.75 | Cum | 610 ₹4,117.5 | 600 ₹4,050 | 605 ₹4,083.75 | 615 ₹4,151.25 | 600 ₹4,050 | 612 ₹4,131 | 613 ₹4,137.75 | 595 ₹4,016.25 Lowest |
| 7.00 | Returning, filling in trenches including spreading, leveling watering and ramming in layers not exceeding 25cm all as specified. | 24.29 | Cum | 155 ₹3,764.95 | 150 ₹3,643.5 | 149 ₹3,619.21 | 150 ₹3,643.5 | 158 ₹3,837.82 | 154 ₹3,740.66 | 152 ₹3,692.08 | 144 ₹3,497.76 Lowest |
| 8.00 | Removing of surplus soil not exceeding 50 m and deposited where directed at a level not exceeding 1.50m above the starting point all as specified. | 19.52 | Cum | 305 ₹5,953.6 | 300 ₹5,856 Lowest | 312 ₹6,090.24 | 325 ₹6,344 | 320 ₹6,246.4 | 307 ₹5,992.64 | 320 ₹6,246.4 | 320 ₹6,246.4 |
| 9.00 | Earth filling under floor incl spreading, levelling & well ramming including watering as required n exc . 25 cm thick complete all as specified and directed.
(Note :- Earth obtained from relevant execavation items above mention is reused ) | 11.48 | Cum | 176 ₹2,020.48 | 175 ₹2,009 | 181 ₹2,077.88 | 1,000 ₹11,480 | 1,025 ₹11,767 | 990 ₹11,365.2 | 999 ₹11,468.52 | 172 ₹1,974.56 Lowest |
| 10.00 | Excavating in post holes each n exc 0.5 cum, getting out, in soft /loose soil, ramming earth filling or borken rubble mixed with earth around in layers nexc 25 cm watering and removing ssurfaces soil to distance nexc 50 m and making good surfaces all as specified and directed. | 180 | Each | 260 ₹46,800 | 200 ₹36,000 | 205 ₹36,900 | 310 ₹55,800 | 300 ₹54,000 | 312 ₹56,160 | 312 ₹56,160 | 198 ₹35,640 Lowest |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
9 Sept 2026, 6:00 pmClosed
GE SILCHAR
Office of the GE Silchar Masimpur Cantt
PROVN OF LPG STORE IN 57 MTN DOU AND CERTAIN REVENUE AND MINOR WORK AT MASIMPUR MIL STN
2026_MES_777311_3
8154A/E8
Open Tender
Civil Works
Item Rate
180 days
Masimpur
Class D Category a i and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹90,000
Yes
14 Sept 2026
25 Aug 2026
12 Sept 2026
25 Aug 2026
9 Sept 2026
2 Sept 2026
25 Aug 2026 - 31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | B & R Division Items | - | - | - | - |
| 2 | Demolition of Concrete of any description and in any position not otherwise specifically provided complete all as specified and directed. | 0.68 | Cum | - | - |
| 3 | Surface dressing n. exc 15 cm deep and getting out in soft /loose soil complete all as specified and as directed. | 263.2 | Sqm | - | - |
| 4 | Excavating over area n. exc. 1.50mtr in depth for foundation etc and getting out in soft/loose soil etc complete all as specified and directed. | 8.67 | Cum | - | - |
| 5 | Excavation in trenches not exceeding 1.50 m wide and n.exc 1.5 m in depth for foundation of column, wall etc, not exc 10 sqm on plan and getting out in soft/loose soil etc complete all as specified and directed. | 28.39 | Cum | - | - |
| 6 | Excavation in trenches not exceeding 1.50 m wide and n.exc 1.5 m in depth for foundation of column, wall etc, not exc 10 sqm on plan and getting out in hard and dense soil etc complete all as specified and directed. | 6.75 | Cum | - | - |
| 7 | Returning, filling in trenches including spreading, leveling watering and ramming in layers not exceeding 25cm all as specified. | 24.29 | Cum | - | - |
| 8 | Removing of surplus soil not exceeding 50 m and deposited where directed at a level not exceeding 1.50m above the starting point all as specified. | 19.52 | Cum | - | - |
| 9 | Earth filling under floor incl spreading, levelling & well ramming including watering as required n exc . 25 cm thick complete all as specified and directed.
(Note :- Earth obtained from relevant execavation items above mention is reused ) | 11.48 | Cum | - | - |
| 10 | Excavating in post holes each n exc 0.5 cum, getting out, in soft /loose soil, ramming earth filling or borken rubble mixed with earth around in layers nexc 25 cm watering and removing ssurfaces soil to distance nexc 50 m and making good surfaces all as specified and directed. | 180 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
8154A-TP.pdf
Tender Documents • 0.57 MB
BOQ_881131.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .