Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.2 LAccepted-AOC | ₹20.2 L | 1 | Accepted-AOC Successful L1 Bidder |
| 2 | 2₹20.4 L+₹16,775 (0.83%)Rejected-Finance DEBINAGAR RANIRBAJAR WEST TRIPURA PIN 799035 | WEST TRIPURA | TRIPURA | 799035 | ₹20.4 L+₹16,775 (0.83%) | 2 | Rejected-Finance L2 |
| 3 | 3₹20.4 L+₹19,250 (0.95%)Rejected-Finance HRISHYAMU KH SOUTH TRIPURA PIN 799156 | BELONIA | SOUTH TRIPURA | TRIPURA | 799156 | ₹20.4 L+₹19,250 (0.95%) | 3 | Rejected-Finance L3 |
| 4 | 4₹20.4 L+₹20,075 (0.99%)Rejected-Finance BELITILLA BELONIA SOUTH TRIPURA PIN 799155 | BELONIA | SOUTH TRIPURA | TRIPURA | 799155 | ₹20.4 L+₹20,075 (0.99%) | 4 | Rejected-Finance L4 |
| 5 | 5₹20.6 L+₹41,525 (2.05%)Rejected-Finance NORTH JOLAIBARI PO NORTH JOLAIBARI PS BAIKHORA SANTIRBAZAR DIST SOUTH TRIPURA | GOMATI | TRIPURA | 799125 | ₹20.6 L+₹41,525 (2.05%) | 5 | Rejected-Finance L5 |
Tender Value
₹27.5 L
EMD Value
₹55,000
Closing Date
5 Jun 2026, 5:30 pmClosed
EE, Engg. cell, DSE, Agt.
EE, Engg. cell, DSE, Agt.
Construction of 05(Five) nos Girls Toilets in 05(Five) different Schools under Bokafa and Hrishyamukh RD Blocks of South Tripura District for the year 2026-27.
2026_DDSE_73246_1
15/EE/ENGG.CELL/DSE/2026-27
Open Tender
Civil Works
Percentage
90 days
Belonia
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹55,000
23 Jun 2026
25 May 2026
6 Jun 2026
25 May 2026
5 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) ncluding dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 0.6 | Cum | 231.6 | ₹138.73 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | 0.2 | cum | 161.3 | ₹32.1 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum | 1,177.3 | ₹1,176.12 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | 1 | Cum | 9,938.6 | ₹9,928.66 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level:1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 12,073.8 | ₹12,061.73 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- In plinth and skirting courses, fillets, columns, pillars, posts and struts 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stoneaggregate 20 mm nominal size) | - | cum | 13,305.8 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement- RCC work in beams, lintels, bands, plain window sills, staircases and spiral staircases excluding precast spiral staircase. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 13,584.5 | ₹13,570.92 |
| 8 | RCC work in suspended floors, roofs having slope upto 15° landings, balconies, shelves and chajjas. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,222.2 | - |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for:Foundations, footings, bases for columns etc. for mass concrete with timber plank | - | sqm | 333.9 | - |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | - | sqm | 625.5 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74543.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
DNIeT.pdf
Tender Documents • 5.18 MB
BOQ_74543.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .