Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-Finance VILL DAYARAMPUR P O ROYPUR DAYARAMPUR SOUTH 24 PARGANAS | SOUTH 24 PARGANAS | WEST BENGAL | ₹16.5 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹18.4 L+₹1.9 L (11.5%)Rejected-Finance DAYARAMPUR P O ROYPUR DAYARAMPUR SOUTH 24 PARGANAS | DAYARAMPUR | SOUTH 24 PARGANAS | WEST BENGAL | ₹18.4 L+₹1.9 L (11.5%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹18.4 L+₹1.9 L (11.7%)Rejected-Finance VILL DAKSHIN SHIBGANJ P O P S PATHAR PRATIMA SOUTH 24 PARGANAS | PATHAR PRATIMA | SOUTH 24 PARGANAS | WEST BENGAL | ₹18.4 L+₹1.9 L (11.7%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹19.0 L+₹2.5 L (15.1%)Rejected-Finance 9 1A BALAI SINHA LANE KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | ₹19.0 L+₹2.5 L (15.1%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹19.4 L+₹2.9 L (17.5%)Rejected-Finance 95 K 6 BASUDHARA CHINGRIGHATA KOLKATA 700105 | KOLKATA | KOLKATA | WEST BENGAL | 700105 | ₹19.4 L+₹2.9 L (17.5%) | L5 | Rejected-Finance Rejected |
Tender Value
₹19.0 L
EMD Value
₹38,018
Closing Date
18 Aug 2026, 2:00 pmClosed
Executive Engineer/Alipore Divn/PHE Dte.
45, Ganesh Chandra Avenue, 5th Floor, Kolkata-700013
Operation and maintenance of distribution system including rising main and FHTC/Tap connection for Gurudaspur, Bhajna and Dakshin Roypur Piped W/S Scheme of Patharpratima Block under Kakdwip Sub Divn. of Alipore Divn., PHE Dte. (for 365 days)
2026_PHED_1034739_4
WBPHED/EE/NIeT-16/AD/2026-2027
Open Tender
CIVIL WORKS
Percentage
365 days
Kakdwip
Please refer Tender documents.
4 documents required · 4 mandatory
₹38,018
9 Sept 2026
28 Jul 2026
20 Aug 2026
29 Jul 2026
18 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and maintenance of distribution system including rising main and FHTC/Tap connection for Gurudaspur Piped Water Supply Scheme of Patharpratima Block under Kakdwip Sub Division of Alipore Division, PHE Dte.
(365 days)
[Annexure - A] | 1 | LS | 6,49,531 | ₹6,49,531 |
| 2 | Operation and maintenance of distribution system including rising main and FHTC/Tap connection for Bhajna Piped Water Supply Scheme of Patharpratima Block under Kakdwip Sub Division of Alipore Division, PHE Dte.
(365 days)
[Annexure - B] | 1 | LS | 6,49,531 | ₹6,49,531 |
| 3 | Operation and maintenance of distribution system including rising main and FHTC/Tap connection for Dakshin Roypur Piped Water Supply Scheme of Patharpratima Block under Kakdwip Sub Division of Alipore Division, PHE Dte.
(365 days)
[Annexure - C] | 1 | LS | 6,01,859 | ₹6,01,859 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
TenderDoc4_AnnexA.pdf
Tender Documents • 0.25 MB
TenderDoc4_AnnexB.pdf
Tender Documents • 0.25 MB
TenderDoc4_AnnexC.pdf
Tender Documents • 0.25 MB
TenderDoc4_SOW.pdf
Tender Documents • 0.28 MB
TenderDoc4_WBF2911.pdf
Tender Documents • 0.50 MB
BOQ_2541672.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .