Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.2 Cr+₹5.7 L (4.85%)Rejected-AOC POST OFFICE ROAD DHARMANAGAR DHARMANAGAR NORTH TRIPURA | NORTH TRIPURA | TRIPURA | 799250 | ₹1.2 Cr+₹5.7 L (4.85%) | 2 | Rejected-AOC L2 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
20 Mar 2024, 10:00 amClosed
The DGM, ED-Kailashahar
O/o the DGM, ED-Kailashahar, Unakoti Tripura
Electrification of un-electrified PVTG households of 6 (six) Nos UE habitation within the jurisdiction of Electrical Division-Kailashahar under PM-JANMAN
2024_POWER_48651_1
DGM/ED/KLS/2023-24/06
Open Tender
Electrical Works
Turn-key
365 days
as per NIT
as per NIT
3 documents required · 3 mandatory
₹8,000
Yes
₹2.5 L
Yes
2 Jul 2024
14 Mar 2024
20 Mar 2024
14 Mar 2024
20 Mar 2024
14 Mar 2024
Amount
Supply of the following:-
8-mt long S.T. pole [for L.T. Line]
M.S. Stay set [HT]
Stay set [ LT ]
Stay insulator (HT)
Stay insulator (LT)
GI Stay wire 7/4 mm (272X5)
M.S. Ch. 100 x 50 x 50 x 6 mm [2.8X18+0.8X12=60.00x9.56=573.60-Kg
M.S. Ch. 75 x 40 x 40 x 6 mm[2.8x96+0.3x130+1.2x130+1.7x71+2.2x71]= 740.70x7.14=5288.60-kg
M.S.Angle 65 x 65 x 6 mm. [2.8X48+1.6x130+2.5x71]=519.90x5.8=3015.42-kg
11 KV Polymeric Disc insulator [45 KN]
11 KV Polymeric Disc fittings.
11 KV Polymeric composite Pin insulator
11 KV G.I Pin.
ACSR WEASEL (30 Sq.mm) Conductor
GI wire (8 SWG)
LA - 9 KV 5 KA (set of 3 no)
11 KV GOS (3 phase Porcelin type)
11 KV DOF (3 phase Porceilin type)
25 - KVA Distribution Transformer,11/0.433-KV (Al) [BIS Level-II]
Cut Out [100 A]
Danger plate
PVC Cable 70-sqmm
Barbed wire
60-Kg Salt & 55-Kg Charcoal for earthing (1-Pit)
2.5-mt long 40-mm dia G.I.Pipe (TATA/JINDAL)
Wooden plank (Gamai/Karai)
Bi-Mettalic Lugs-70-sq.mm
PVC Pipe 1" size
L.T.AB Cable (3x70+1x50+1x65)-sq.mm
Suspension clamp Assembly with straps & buckle
Dead end clamp Assembly with straps & buckle
Service Anchor clamp
Distrbution Box 1-Phase ( 25 mm / 50 mm)
Cable End Cap (25-35 mm / 25-50 mm)
Cable Ties
Eye Hook
Pole clamp
Insulator piercing connector Main (16-95 sq.mm) & Tap 4-35(50) sq.mm
Stay clamp of MS Flat (50x6-mm)
Bracket clamp of MS Flat (50x6-mm)
Nuts & Bolts (assorted) size
2.5-Sq.mm PVC Cable (35x2x128)
Re-wireable Porcelin Cut out 16 Amp
10-SWG GI Wire for holding Service cable (3-Kg x 128)
Reel insulator (15x128)
8-SWG GI Wire for coil Earthing (4x128)
16-Amp ICDP Main Switch with ISI mark
Wooden plank (thickness 1")
9W LED Bulb
Angle holder ISI mark
4x4" Wooden / polycarbonate Board
5 Amp piano switch ISI mark
Single core 1.5-sq.mm Copper wire
Supply & Erection of Screw of assorted size
carrying of following from AD Nagar store to work site:- (a) S.T Pole 9.00mtr long(Upto 8 nos pole)
carrying of following from AD Nagar store to work site:- (b) S.T Pole 9.00mtr long (beyond 8 nos pole)
ERECTION OF THE FOLLOWING:- Erection of 9-mt length of S.T. Pole at any kind of soil upto a depth of 1/6 th of pole height including excavation of earth refilling the pit with soil upto the ground ;level ramming & making complete in all respect
Erection of 8-mt length of S.T. Pole at any kind of soil upto a depth of 1/6 th of pole height including excavation of earth refilling the pit with soil upto the ground ;level ramming & making complete in all respect
Erection of Stay set direct in earth complete with 19mm x 1800mm long stay rod,anchor plate of size 300x300x8-mm thimble,turn buckle,7/3.15 mm dia G.I.Stranded stay wire & stain sulator etc. with supply of M.S.Clamp, Nuts & bolts etc as reqd and making complete in all respect
Erection of M.S.Channel Cross-Arm 2.8-mtr long 100x50x50x6 mm (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm 0.8 -mtr long 100x50x50x6 mm (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm 2.8-mtr long 75x40x40x6 mm for GO,DO & LA (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Angle Cross-Arm 2.8-mtr long 65x65x6 mm (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm 0.3 mtr long 75x40x40x6 mm for S.P.Top bracket (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm 1.2 mtr long 75x40x40x6 mm for S.P Bottom bracket (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Angle Cross-Arm 1.6-mtr long 65x65x6 mm for S.P.Guard (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm 1.7 mtr long 75x40x40x6 mm for D.P.Top bracket (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm 2.2 mtr long 75x40x40x6 mm for D.P Bottom bracket (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S.Angle Cross-Arm 2.5-mtr long 65x65x6 mm for D.P.Guard (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of 11 KV single Disc insulator set along with necessary fitting
Erection of 11 KV Pin insulator along with Pin
Erection of Danger plate on OH lines (11-KV/415Volts)
Laying & stringing of 1KM (Single conductor) ACSR 6/1/2.59 mm dia WEASEL including hoisting & binding etc complete as reqd.
Laying & stringing of 1KM (Single conductor) G.I.Wire 8-SWG including hoisting & binding etc complete as reqd.
Erection of 9 KV, 5 KA Single pole metal oxide gapless type LA including necessary connection complete as per technical specification
Erection of 11KV 200 Amp. GOS unit set of three nos. including necessary connection complete as per technical specification (Excluding the cost of back clamp, Nuts & bolts)
Erection of 11KV DOF unit set of three nos. including necessary connection complete as per technical specification (Excluding the cost of back clamp, Nuts & bolts)
Laying of 8-SWG GI Wire at 300-mm below the ground level for earthing of Sub-station equipments from the earth electrode/ HT Pole/ LT Pole/ service main
Installation/positioning of 11/0.433 KV 3-Phase 25- KVA of distribution Transformer on pole with necessary connections & fitting fixing of all allied accessories components as required for making complete in all respect for energizing
Erection of 11 KV protective guarding by GI wire 8 SWG as per technical specification across road/river/Telecom line etc in horizontal formation complete
Supply & erection of substation fencing with erection of 6nos 2.50m long ( 65 x 65 x 6mm) Angle post and 4nos( 50 x 50 x 6mm)angle post with grouting of vol 0.045cum at the ratio of 1:2:4(1cement :2R. sand : 4 jhamabrick aggregate) per post. The fencing should be made 9 horizontal line of barbed wire and one gate with shutter (2 x 1.7)m i/c locking arrangement etc complete as per diection of the Engg. in charge.
Fabrication of X-arm by MS Angle/MS Channel as per specification
Earthing with G.I.Pipe 2.5 mtr long & 40 mm dia including excvation, refilling with alternate layer of salt & Charcoal as per drawing (excluding supply of G.I.Pipe, Salt & Charcoal, GI Wire, Nuts & bolts etc as required)
Barbed wire (anti-climbing device)
Positioning of cable drum, removing of cable from drum & laying,hoisting & drawing of AB Cable 3x70-95+1x16-25+1x50-95-sq.mm of 101 KV grade as per direction of E-I-C
Fitting-fixing of Service main 1/3-phase distribution Box 1.01-KV grade on PCC/ST Pole with help of pole brackets or steel straps & buckle as per direction of E-I-C
Erection & ditting-fixing of insulated suspension clamp including pole clamp, Eye hook for cable massenger of 1.1 KV grade on PCC/ST Pole with the help of pole brackets or steel straps & buckle as per direction of E-I-C
Erection & ditting-fixing of insulated Dead end / Anchor clamp including pole clamp, Eye hook for cable massenger of 1.1 KV grade on PCC/ST Pole with the help of pole brackets or steel straps & buckle as per direction of E-I-C
Erection & ditting-fixing of insulation of Piercing connector (IPC) of all sizes of 1.1 KV grade including connection from main cable to Distribution Box, Tee-off line as per direction of E-I-C
Providing Single Phase Service Connection with laying PVC cable from nearby Electrical pole to premises up to 35 mtr in length supported by G.I.Wire Reel insulator i/c fitting, fixing of Energy Meter as reqd.
Carriage of 11/0.433 KV 3 Phase 25 KVA by Mechnical Transport from the Sub-Divisional store yard to Work site including loading, unloading &as reqd. Upto lead range 25 KM
Carriage of 8/9-mtr long S.T. pole by Mechnical Transport from the Sub-Divisional store yard to Work site including loading, unloading &as reqd. Upto lead range 25 KM
Carriage of steel materials,ACSR,GI Wire,GOS & DOF LA etc by Mechnical Transport from the Sub-Divisional store yard to Work site including loading, unloading &as reqd. Upto lead range 25 KM
Grouting of 9-Mtr long S.T. Pole (1-Cement : 2-coarse river : 4-graded stone) = .273-cum/Pole
Sub-station Name plate in/c supply as directed by Engg-in-charge
Maintaining adequate clearence from overhead live conductors by Trimming of tree branches for way leaves
Straightening of 9-mt long PCC Pole
Re-adjustment of Stayset complete without dismentalling of turn buckle
Re-stringing of conductor (ACSR 6/1/2.59-mm) including binding,hoisting & jumpering etc as reqd
NIKHIL DAS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .