| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC V P O KARSOG TEHSIL KARSOG DISTT MANDI HP | KARSOG | MANDI | HIMACHAL PRADESH | L1 | Accepted-AOC AOC | |
| 2 | L2₹4.0 L+₹21,858.80 (5.79%)Rejected-Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.1 L+₹28,105.90 (7.44%)Rejected-Finance VILLAGE KHADED P O CHOWAI TEHSIL ANNI DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.1 L+₹33,993.90 (9.00%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹4.2 L+₹45,451 (12.0%)Rejected-Finance VILLAGE BANAS P O JAON TEHSIL ANNI DISTT KULLU HP | SHIMLA | HIMACHAL PRADESH | 172001 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Som Krishan L6 | Yog Raj L2 | Gulab Chand L4 | SATPAL L1 | Contractor L5 | Dev raj L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | |||||||||
| 1.01 | Foundations, footings, basis of columns & the like and mass concrete. | 8.73 | Cum | 12,000 ₹1,04,760 | 9,700 ₹84,681 | 9,700 ₹84,681 | 9,000 ₹78,570 | 9,900 ₹86,427 | 8,000 ₹69,840 Lowest |
| 2.00 | Wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | 9.74 | Cum | 12,500 ₹1,21,750 | 10,000 ₹97,400 | 10,500 ₹1,02,270 | 9,500 ₹92,530 | 11,000 ₹1,07,140 | 8,000 ₹77,920 Lowest |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts: | |||||||||
| 3.01 | Vertical surfaces such as walls (any thickness)portions and the like including attached pilaster buttresses plinth and string course and the like | 126.84 | Sqm. | 600 ₹76,104 | 480 ₹60,883.2 | 550 ₹69,762 | 420 ₹53,272.8 | 550 ₹69,762 | 380 ₹48,199.2 Lowest |
| 4.00 | Providing Placing &Laying mild /tor steel reinforcement for RCC. work including bending, binding and placing in position complete up to floor two level including all leads and lifts.: a) Tor steel | 1,613.7 | Kg. | 100 ₹1,61,370 | 97 ₹1,56,528.9 | 96 ₹1,54,915.2 | 95 ₹1,53,301.5 Lowest | 99 ₹1,59,756.3 | 130 ₹2,09,781 |
Tender Value
₹4.1 L
EMD Value
₹8,283
Closing Date
26 Aug 2026, 5:00 pmClosed
EE JSV Division Anni
EE JSV Division Anni
SH Jacketing of clear water tank at Shegubag, Khadog Masogrli Mahidhar and Khamaru of 8000 ltrs cap. at Doghri Jaajar of capacity 10000 ltrs. At Shvini Kainchi of capacity 12000 ltrs). Under PDNA.
2026_HPIPH_141557_1
4713-53
Open Tender
Civil Works
Item Rate
120 days
Dalash
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹8,283
17 Sept 2026
19 Aug 2026
27 Aug 2026
20 Aug 2026
26 Aug 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | |||||
| 1.01 | Foundations, footings, basis of columns & the like and mass concrete. | - | Cum | - | - |
| 2Wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | |||||
| 3Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts: | |||||
| 3.01 | Vertical surfaces such as walls (any thickness)portions and the like including attached pilaster buttresses plinth and string course and the like | - | Sqm. | - | - |
| 4Providing Placing &Laying mild /tor steel reinforcement for RCC. work including bending, binding and placing in position complete up to floor two level including all leads and lifts.: a) Tor steel | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.28 MB
form6.pdf
Tender Documents • 0.38 MB
form8.pdf
Tender Documents • 1.24 MB
terms.pdf
Tender Documents • 0.46 MB
BOQ_210142.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .