Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Docments not as Per NIT |
Tender Value
₹1 L
Closing Date
20 Nov 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW DIVISION RAJOURI
Constt of Spring Cover at Ward No 01 Pyt. Kalaban Block Manjakote Under B2V3
2021_RDPR_147325_30
e-NIT No. 57 REW RAJOURI OF 2021 Dated 11-11-2021
Open Tender
Civil Works
Item Rate
30 days
Manjakote
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
CD-Account No. 0020010200000890
Exempted
10 Dec 2021
11 Nov 2021
22 Nov 2021
11 Nov 2021
20 Nov 2021
11 Nov 2021
45 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes cables etc. (not exceeding 1.5m in width) and for shafts, wells cesspits and the like not exceeding 10sqm on plan, depth upto 1.5m including disposal of excavation earth upto 1m from cutting edge, disposed earth is to be leveled and neat by dressed in 80% a.k.s & 20% o.r
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40 mm nominal size).
P/L 1:1.5:3 RCC work in wall (any thickness) including attached pilaster buttresses including curing excluding cost of cenetring/shuttring
P/L 1:1.5:3 RCC work in beams, suspended floors, roof having slope 15 upto floor five level including curing but excluding the cost of centering/shuttring
Providing steel reinforcement for RCC work including straightening, cutting bending placing in position and binding all complete
Cement concrete flooring 1:2:4 mix 50mm thick finished witha floating coat of neat cement including cement slury and curing complete
providing cenetring/Shuttring for walls
walls
Salab
Consumption of Material
Carriage of Bajre 50km by MT & 1.0Km by HL
Carriage of sand 180km by MT & 1.0 Km by HL
Carriage of steel 15km by MT 1.0Km by HL
Carriage of Cement 15Km by MT & 1.0Km By HL
add cost of manhole
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .