Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-AOC | ₹6.1 Cr | L1 | Accepted-AOC 1st Lowest |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SREEKANDAN B L1 |
|---|---|---|---|---|
| 1.00General Civil Work | ||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 1.5 | Hectare | 51,104.31 ₹76,656.47 |
| 1.00 | OD145747/2024-2025:Clearing chocked up culvert and drain conveying the waste material up to a distance of 5 km lorry lead as directed by the department officers at site. | 82.95 | cum | 481.98 ₹39,980.24 |
| 1.00 | OD145748/2024-2025:Lifting the existing pre-cast RCC covering slab from drain and culvert for removal of silt and placing the same slab on position after completion of clearing work including all labour charges and ,iscelaneous expence etc. complete | 300 | each | 184.16 ₹55,248 |
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 812.5 | cum | 58.97 ₹47,913.13 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 152.25 | cum | 6,644.64 ₹10.1 L |
| 1.01 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br> | 34.75 | cum | 8,014.91 ₹2.8 L |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 276 | cum | 7,659.87 ₹21.1 L |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 107.27 | cum | 8,335.5 ₹8.9 L |
| 1.01 | 12.8.E.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M25 - Using Concrete Mixer <br> | 19 | cum | 8,809.53 ₹1.7 L |
Tender Value
₹5.9 Cr
EMD Value
₹2 L
Closing Date
29 Nov 2024, 5:00 pmClosed
Superintending Engineer, PWD Roads South Circle,
Superintending Engineer, PWD Roads South Circle,Tvm
GENERAL Proposal Sabarimala 2023 2024 Upgradation work Providing BM BC to ring road Panachammodu Panchamkuzhi Mullilavuvila road 0000 to 2200 Malayinkavu Mullilavuluvila road 0000 to 3000 General Civil Work
2024_PWD_699735_2
PWD/RB/TR/17166/2023_5_1_1/RC 1/1
Open Tender
Civil Works - Roads
365 days
Panachammodu
Please refer Tender documents.
8 documents required · 8 mandatory
₹13,010
Yes
₹2 L
Yes
1 Apr 2026
19 Nov 2024
2 Dec 2024
19 Nov 2024
29 Nov 2024
19 Nov 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1107701.xls
BOQ • 0.33 MB
bid.pdf
Tender Documents • 2.05 MB
Download all tender documents and submit your bid