Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 CrAccepted-AOC P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | ₹11.4 Cr | L1 | Accepted-AOC Lowest rate quoted |
| 2 | L2₹11.6 CrRejected-Finance CHAMOGURI SATRA KAMALABARI CITY TOWN MAJULI P O KAMALABARI P S MAJULI DIST MAJULI PIN 785110 | MAJULI | MAJULI | ASSAM | 785110 | ₹11.6 Cr | L2 | Rejected-Finance High rate quoted |
Tender Value
Refer Docs
EMD Value
₹7.2 L
Closing Date
16 May 2023, 6:00 pmClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl , Mizoram
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLEANING RD SURFACE APPLYING PRIME COAT, TACK COAT, CORRN WKS WITH BM INCL RD MARKING FOR RE-SURF WKS ON VARIOUS LOC BET KM 3.000 TO KM 75. 500 ON CHK RD UNDER 74 RCC/24 TF PROJECT PSK IN MIZORAM (2ND CAL
2023_BRO_592612_1
NIT-23 OF 2022-23
Open Tender
Civil Works - Roads
270 days
BETWEEN KM 3.000 TO KM 75.500 ON CHK ROAD
As per tender document
8 documents required · 8 mandatory
₹0
₹7.2 L
Yes
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl , M
13 Jul 2023
1 May 2023
18 May 2023
2 May 2023
16 May 2023
9 May 2023
2 May 2023 - 8 May 2023
6 May 2023
Amount
RESURFACING WORK ON CHAMPHAI-HNAHLAN-KHUANGPHAH ROAD (KM 3.000 TO KM 75.500)
Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with WBM 75 MM thick compacted as per clause No 404 of MoRT&H Specifications (Fifth revision) and Prime Coat Over WBM correction surface as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge. Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work i.e Preparation of area for potholes and patch repair, filling/spreading WBM materials and application of bitumen emulsion(Prime Coat). 2. Then maximum area of correction work with WBM 75 mm thick compacted will be 10% of BC Area.
BRN INFRASTRUCTURES PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid