Tender Value
₹11.4 L
EMD Value
₹11,400
Closing Date
17 Jun 2026, 12:00 pm
SE ETC Gonda
220 kv substation gonda campus jail road gonda.
WORK
2026_UPTCL_1153691_1
03/ETC(GD)/2026-27
Open Tender
Electrical Works
30 days
Bahraich
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
EE ETD GONDA
₹11,400
25 May 2026
25 May 2026
17 Jun 2026
25 May 2026
17 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Scope: Supply , installation and configuration of Gateway Over IEC104 protocol t o send the Data to SLDC Lucknow and ALDS Modipuram and its associated work at 132kV S/s Bhinga. | ||||||
| 1.01 | Supply and installation of SCADA Software:
Supply, installation, testing & commissioning of RTU/Gateway unit of Siemens / ABB / Schneider Electric / Hitachi Energy/Alstom or equivalent reputed make, suitable for substation automation and SCADA integration with the following minimum specifications:
Input Auxiliary Supply Voltage : 80-220V AC/DC Supported Communication Protocols : IEC 61850, IEC 60870-5-101 and IEC 60870-5-104 Suitable for integration with existing SAS/SCADA system and compatible with Ethernet/Fiber optic communication network. All required software licenses, engineering tools, configuration software, soft keys, dongles, passwords, firmware utilities and related accessories, if any, shall be included in the contractor’s scope without any additional cost.
Complete supply, engineering, configuration, database
preparation, protocol mapping, testing, commissioning and
integration with existing system shall be under contractor scope.
Note: Bidder Should have the authorization from ABB/SURVALENT/ ZIV(OEM) for the above subject and
bidder shall supply genuine and perpetual reputed gateway | - | Job | - | - | - |
| 1.02 | Supply & installation o f FO cables/patch cord/LIU and its
related hardware as per site requirement
-Checking healthiness and rectification of faults/issues of FO network.
- Splicing and term ination of FO cable of each kiosk.
- Checking & modification work to complete the network
communication for smooth functioning of Gateway system.
-Fiber cable FO Patch Cord (LC-LC) 10 Meters (6 Nos.)
-Fiber cable FO Patch Cord (LC-LC) 5 Meters (5 Nos.)
-Fiber cable FO Patch Cord (LC-LC) 3 Meters (5 Nos.)
-Cat6 Cable 5 Meter (2 Nos.)
-Cat6 Cable 3 Meter (2 Nos.) | - | Lot | - | - | - |
| 1.03 | Configuration of IEC61850 based BCPUs. ICD/.CID files
Configuration as per the existing respective feeders schematics and field signals. work includes IEC61850 base BCUs/relays variables configuration, dataset configuration, Report control Block etc.,
i). 132kV Feeders-5 Nos
ii) 33kV Feeders-9 Nos. | - | Job | - | - | Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping/closing, spring charging/indication/supervision circuit with proper ferruling and checking out of breaker operation from local/remote including earthing & connection of both side jumpers and works related to complete the erection work. All required T&P skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost. |
| 1.04 | Gateway configuration, protocol engineering, testing and
validation of all 132kV & 33kV feeder real-time data
communication to State Load Dispatch Centre (SLDC
Lucknow) and Area Load Dispatch Sub Centre (ALDS
Modipuram) through IEC 60870-5-104 (IEC-104) protocol.
Scope shall include:
-Configuration and mapping of all analog, digital, energy and alarm/event signals in Gateway/RTU.
-Integration of existing bay IEDs/relays with Gateway through IEC61850/IEC101/IEC104 protocol as applicable.
End-to-end communication checking from feeder bay level up to SLDC/ALDS control center.
-Testing, validation and troubleshooting of real-time data,
indications, SOE, alarms and commands.
-Necessary protocol conversion, database creation, IP
configuration and communication parameter settings.
-Coordination with SLDC/ALDS authorities for successful data validation and commissioning.
=Submission of tested database/configuration backup,
communication reports and validation documents after
successful commissioning. | - | Nos. | - | - | 6Core x 2.5 Sq mm |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
TD03.pdf
Tender Documents • 1.45 MB
BOQ_2161207.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid