Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
5 Sept 2026, 6:00 pm
Executive Engineer, panchayat, R & B Division, Surat.
Package No. /PAL/MMGSY/RES/2-RD/26-27 (1) Ena Ghaluda Road KM (0/00 to 2/700) (2) Palsana Vyas Faliya To Kanav Road KM (0/00 to 2/400) Total Length-5.1 km Ta. Palsana Di. Surat.
339765
07 of 2026-27
Open
Civil Works - Roads
Works
Surat
5 documents required · 5 mandatory
₹3,600
Executive Engineer, panchayat R & B Division, surat
₹1.7 L
28 Aug 2026
28 Aug 2026
28 Aug 2026
5 Sept 2026
28 Aug 2026
Name of work: Package No. /PAL/MMGSY/RES/2-RD/26-27 (1) Ena Ghaluda Road KM (0/00 to
2/700) (2) Palsana Vyas Faliya To Kanav Road KM (0/00 to 2/400) Total Length-
5.1 km Ta. Palsana Di. Surat.
Memorandum showing items of works to be carried out
Quantities Item of work Estimated Total Amount
Quantities Item of work Estimated Total Amount
It. No. estimated but may In figures according to
be more or less Rs. Ps. estimated
Clearing and grubbing road land, including uprooting
rank vegetation, grass bushes, shrubs, saplings, and
trees girths up to 300 mm, removal of stumps of trees
1 0.61 Hect. cut earlier, and disposal of unserviceable materials(D) 34889.38
By mechanical means in area of thorny jungle
Box cutting the road surface to proper slope and
camber formaking a base for road work including
2 1235.00 Cu.mt. removing the excavated stuff and depositing on the 109.41
road side slope as directed upto 50Mt.lead.
Earthwork in cutting in all sorts of soil and soft
murrum including conveying and putting the stuff in
spoil bank maintaining minimum distance of five
meter between top edge and cutting and toe of spoil
Providing and fixing pre-cast steel Dye inter locking
concrete block 100 mm thick with grade of concrete
M 350 pnumatic compressed / vibrated mechanically
and as per approved design Confirming to IS 15658 :
4 2090.00 Sqmt 2006 including 35 mm Sand layer for levelling and 1527.12
filling the joint with sand in proper line and level as
per guidlines of IRC : SP 63-2018 etc. Complete.
Providing and laying cement concrete 1:2:4 (
Cement : 2 : coarse sand : 4 graded stone aggregate
5 17.00 Cu.mt. 20mm nominal size) and curing complete excluding 5371.18
cost of form work in (A) Foundation & Plinth (more
Construction of granular sub-base by providing coarse
graded material grading-II, spreading in uniform
layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and
compacting with vibratory roller to achieve the
desired density, complete as per clause 401.B
Providing and laying 150mm thick W.B.M of
Grading-II in two layer each of 75mm using B.T.M.C.
metal of size 45mm to 63mm in layers including 13%
sone screening 13.2mm size and 7% stone dust as
7 182.00 Cu.mt. filler, including spreading, watering and cosolidation 1179.84
by vibratory roller as per MoRTH specifications etc
complete as directed by engineer in charge.
Construction of granular sub-base 150 mm thick
layer by providing machine crushed B.T. material
satisfying MORT&H specification (Fifth revision) of
Grading I including spreading in uniform layer with
8 881.00 cu.mt. motor grader on prepared surface, mixing by mix in 841.04
place method with rotavator at OMC and compacting
with vibratory roller to achieve the desired density etc.
Providing & laying 25 mm. thick SDBC using B.T.
stone chips as per MORTH gradation and
specification with asphalt VG-30 at the rate of
kg. / M.Tone of total wt. for mix i.e. (5.00 % ) by
weight of total mix of bitumen including mixing
aggregates & asphalt by continuous batching drum
mix plant & spreading the same by paver finisher
including rolling & consolidation with 10 - 12 tonnes
vibratory roller & providing tools 7 plants, fire wood,
oil, kerosene, labour charges using contractor's own
machineries etc. complete.
Providing and laying 50 mm thick compacted
B.M.with B.T. aggregate as per MORT&H
specification using Tack Coat for coat at Emulsion RS-
1 2.50 Kg./10Sq.mt. with mechanical sprayer and
bitumen grade VG-30 for mixing at the rate
Kg/M.T. i.e. 3.4 % of total mix including heating the
aggregate and asphalt by drum mix plant and
10 1805.50 M.Ton spreading the same by paver finisher and 3646.47
consolidation with vibratory roller including
providing all materials, equipments, tools and plants,
oil, kerosene, fire wood, labour charges etc. complete
Providing and laying asphalt painting on B.T. surface
with bitumen VG-30 at rate 5.00Kg / 10Sq.mt.
including spreading stone dust for painting surface at
11 16384.00 Sq.mt. rate of 0.03 cu.mt. / 10 sq.mt. 44.00
Providing and fixing ordinary Kilometer stone of
precast C.C. 1:2:4 including necessary reinforcement
as per I.R.C. type design in C.C. 1:4:8 including
12 8.00 No.s painting,lettering etc. complete (For O.D.R and V.R.) 704.33
Providing and fixing Hectometer as per I.R.C. type
design including painting, lettering etc. complete.(ii)
13 21.00 No.s Fixing in C.C. 1:5:10 356.50
Informatory Signs :-Providing and fixing sing boards
made out of 2mm aluminium sheet; size 80 x 60cms.
rectangle as per the design of IRC-67-1977 pre treated
with phospheting process & acid teching; coated with
one coat of epoxyprimer and two coats of best
qualityepoxy paint; reflectorised with retro refiective
sheeting as per latest M.O.S.T. Specifications; 3.1m
long stand postand frame fabricated from suitable
sizeiron angle of 35 x 35 x 3mm75x75x6mm as
required; painted with best qualityepoxy coatings in
14 2.00 No.s black and whitebends. the details of symbol for 3856.90
eachboard shall details of symbol for eachboard shall
be as per the instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CC block of size 45 x45
x 60cms. for each leg. including excavation curing
tec. complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)...
MMGSY Logo Board:- Providing and fixing
MMGSY Logo Board made out of 2mm aluminium
sheet, as per the drawing & design. Pre treated with
phospheting process and acid etching coated with one
coat of epoxy primer and two coat of best quality
epoxy paint, refloctrorized with retro reflective
sheeting as per the latest M.O.S.T. specification,
Mt. long stand post and frame fabricated from suitable
size iron angle of 35 x 35 x 3 mm, 75 x 75 x 6 mm as
15 1.00 No.s required painted with best quality epoxy coatings in 4545.00
black and white bends. The details of symbol for each
board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC block
of size 45 x 45 x 60 cms for each leg, including
excavation curing etc. complete under the supervision
of Engineer-In-Charge (A)Engineering grade.
Village name/ Bump Ahed sign :-Providing and
fixing sing boards made out of 2mm aluminium sheet;
size 90 x 60cms. rectangle as as per the design of IRC-
67-1977 pre treated with phospheting process & acid
etching; coated with one coat of epoxy primer and
two coats of best quality epoxy paint; reflectorised
with retro refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of 50 x 50 x
16 10.00 No.s 5mm painted with best quality epoxy coatings in 5045.36
black and white bends. the details of symbol or
inscription / numerals for each board shall be as per
the instruction of engineer in charge. The fixing at site
shall be in 1:2:4 CC block of size 45 x 45 x 60cms.
for each leg. including excavation curing etc.
complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)...
Direction sign (Junction board):-Providing and fixing
sing boards made out of 2mm aluminium sheet; size
244 x 122cms. rectangle as as per the design of IRC-
67-1977 pre treated with phospheting process & acid
etching; coated with one coat of epoxy primer and
two coats of best quality epoxy paint; reflectorised
with retro refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of 50 x
x5mm 75x75x6mm as required; painted with best
quality epoxy coatings in black and white bends. the
details of symbol or inscription / numerals for each
board shall be as per the instruction
of engineer in charge. The fixing at site shall be in
1:2:4 CC block of size 45 x 45 x 60cms. for each leg.
including excavation curing etc. complete under the
supervision of engineer in charge.(A) Engineer
Road marking with hot applied thermoplastic paints
with reflectorising glass beads on bitumin surface
providing and laying a hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass
beads @ 250gms per sqm area, thickness of 2.5mm is
excludingof surface applied glass beds as per IRC:35-
2015. The finished surface to be level, uniform and
free from streaks and holes. zebra patta /bump patta
lane/center line/ edge line/cut patta. The white color
18 775.10 Sq.mt. marking should provide liminance coefficinet on 367.72
cemend road shalll be min 130 mcd/m2/lux and
Asphalt road shall be min 100 mcd/m2/lux during the
service lifeduring the day time. The marking should
meet the performance criteria for night time
reflectivity, wet reflectivity and skid resistance as
mentioned in the section-15 of IRC 35-2015.
Warranty for the Retro reflectivity should be two
Chevron sign :-Providing and fixing sign boards made
out of1.5mm aluminium sheet / 3mm ACP
(Aluminum compositePanel); size 60x50cm
rectangular as per design ofIRC-67-2012. Pre treated
with phospheting process & acidetching; coated with
one coat of epoxy primer and two coats ofbest quality
epoxy paint ; reflectorised with High
IntensityPrismatic Grade retro refiectivesheeting of
Type-4 as perASTM D-4956 and latest
M.O.S.T.Specifications; 3.3 mtr longstand post of
Iron Angle 75 x 75 x 6mm / 65NB Circular MSPipe
as required and frame fabricated from suitable size
ironngle of35x35x3mm; painted with bestquality
epoxy coatingsin black and white bends. the details of
symbol or inscription /numerals for each board shall
be as per the instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CCblockof size 45 x
x 60 Cms. for each leg includingexcavation, curing
etc.complete under the supervision ofengineer in
charge. A warranty for 7 years for the Retroreflective
sheeting from original manufacturer & a
Rs. One Corer Seventy Lack Fifteen Thousand Eight Hundred Fourty One and Paise Thirty Seven Only.
I/We am/are willing to carry out the work at ________________ % above/below ( percent should be
written in figures and in words ) of the estimated rates mentioned above. Amount of my/our tender works out as under.
*Estimated amount *Estimated amount
put to tender Rs. 17015841.37 put to tender Rs.
Deduct ____ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note 1:- The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
Note 2 :- The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3:- GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4:- In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
Signature of Bidder
Deputy Executive Engineer Executive Engineer
Panchayat (R&B) Sub Division Panchayat (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GRs - SBD with Index_11zon (5).pdf
5. GR Performance Bond and Bitumen date.pdf
3. SOM and Monitoring Formats (Uploading attachment).pdf
2. ESMP Table and Protection Clause.pdf
1. Clauses-Terms and Conditions of Contract-B1-04.09.2017 (1).pdf
6. GR.pdf
Environment GR_11zon.pdf
Performance Bond and Bitumen date.pdf
05-GR.pdf
6.GR.pdf
Road Testing.pdf
1. PKG- 6 Schedule-BOQ.pdf
3. PKG-D SBD.pdf
4. SPECIFICATION Pkg D.pdf
PKG 2 FRONT PAGE-D.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].