Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
29 May 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TRACK
17 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V which ever is less: where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
As a proof of technical experience/competence, (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b)(1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard GCC through subcontractor fulfilling the requirements as per clause 7 of the Standard GCC or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. (refer Clause 10.1 Part-I of SGCC 2022)
In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the GCC with prior approval of Chief Engineer in writing
The tenderer must ensure that the quantum of similar nature of work done has to be specifically mentioned in the uploaded experience 1.1.1 certificate by the concerned authority whom the certificate is issued .Otherwise ,the offer is liable to be rejected
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate 1.1.2 has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Work :- Any TSR/CTR/Track linking work
58 conditions · 18 needing a document upload
Whether required test certificates/ samples, if any have been uploaded?
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm/Company/Joint Venture (JV)/Registered Society/Registered Trust/Hindu Undivided Family (HUF)/Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the requisite documents (including Power of Attorney, if opted) for constitution of their concern as per Cl. 14 of GCC-Part-1 and as per a)Clause 17 of GCC - Part - 1, for JV b)Clause 18 of GCC - Part - 1, for Partnership Firm.
Copies of the following documents are to be uploaded:- i)Details such as Name of the tenderer/contractor, Validity of DSC, Complete address with pin code, Contact Number ii)Copy of PAN card iii)Copy of GSTIN card
A copy of NEFT form duly filled in the details as necessary to be uploaded. (The Tenderer/Contractor not having NEFT form may download the empty NEFT form available in document site)
Submission of Annexure-V(A) under Document Verification Certificate In case of other than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm / Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may b e . Non-submission of the above Certificate(s) by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested / digitally signed by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document.
As per Rly Board vide letter No2022/CE-I/CT/GCC Correspondence dated 14/05/2024, it was advised that " On IREPS Module a facility has already been created for online submission of Annexure V. Therefore, the provision of downloading of Annexure V of GCC & uploading of physically signed Annexure V by the tenderer had been discontinued on IREPS" . Hence the tenderers advised to use this option in IREPS module to submit certification related to Annexure V. The tenderers are advised to follow the instructions stated in IREPS module regarding this.
Scanned copy of PAN card has to be enclosed
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All works tenders or service tenders invited by railways through e-tendering on IREPS, having advertised value of Rs 10 lakh and above, contractors are eligible to take payment from Railways through a Letter of credit (LC) arrangement. (Ref: RB letter no.2018/CE-I/CT/9 dated 04.06.18) (i) For all the tenders having advertised cost of Rs 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement. (ii) T h i s option of taking payment through L C arrangement h a s t o be exercised in !REPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.(iii) The option so exercised, shall be an integral part of the bidder's offer. (iv) T h e above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract. (v) In case tenderer opts for payment through LC, necessary procedure for LC mode of payment shall be followed to deal release of payment through LC:
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: i.A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. ii.The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date of submission of bids ( i.e. excluding the last date of submission of bids). 1. The Bid Security shall be deposited either in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90days beyond the bid validity period. iii.Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. iv.The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. v The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected vi The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. vii The envelope shall be addressed to the officer and address as mentioned in the tender document. viii If the envelope is not sealed and marked as instructed above, the Railway assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder.
Subject to exemptions provided under para 5(1) (a) of Part-1 (ITT) of SGCC 2022, the tender must be accompanied by a Bid Security as mentioned in tender documents, failing which the tender shall be summarily rejected.
Trivandrum Division- CTR-4.325km &TSR (P) -1.544km using TRT Machine,CTR (manual)-0.395km & TSR(P) manual - 0.773km
4-TVC-4-2026
4-TVC-4-2026
Open
Works - General
12 Months
Thiruvananthapuram, Kerala
₹0
₹3.5 L
29 May 2026
4 May 2026
15 May 2026
55 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 21,71,484.13 | ||
| — | 1180.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km "Providing lighting arrangements on hiring basis with contractor's supply of tube lights of 40W with necessary fittings duly fitted on casurina/bamboo post which should be firmly fixed on the ground at 2.50m to 3.50m away from the center of the track and also the bottom of tube light shall be at 1 to 1.50m above rail level along both sides of the track at an interval of 7m to 10m for a distance of 1000m approximately during night time working of the TRT machine as per stipulated norms and lighting the same by using 4 nos. of contractor's supply of portable generator along with one standby (Total 5 nos) of 3 KVA or higher capacity including all luminaries, cables, fuels etc. 2 nos of genset should be placed on one side of track and other 2 nos.on the other side of the track at the middle of the workspot. "No cable or wire should cross the track. The contractor shall provide an electrician/operator and 3 helpers available for uninterrupted lighting at workspotincluding fixing and removing the lighting set and poles, transporting and refixing for next day's work. All labour, operator, luminaries, fittings, fuels and minor repairs etc. has to be borne by the contractor only. The lighting should be made available between 20 hrs and 6 hours of maximum duration of 10 hours. It is the responsibility of the contractor to ensure safe custody of all lighting arrangements and genset. The lighting shall be made available even during rain also.(All labour, tools and plants, labour, operator, luminaries, fittings, fuels and minor repairs etc.are to be borne by contractor's own cost)"Note:- Each denotes each tubelight | — | — | — | 1,51,323.2 | |
| — | 43.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Loading of new fittings (ie) ERC, GRP, Liners on BFR/BRH at Depot and unloading at site of work during TRT work as instructed by the Engineer - in- charge & placing them on PSC sleepers properly including correct adjusting of fittings in position if gone out of place behind TRT/ clip application. (All labour,materials and tools and plants are to be supplied by the Tenderer/ Contractor only at his own cost) | — | — | — | 14,573.56 | |
| — | 21.63 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Supply of hard/Jungle wooden battens of size 3m x 75mm x 75mm for packing below sleepers at locations specified by the Engineer-in-charge at BFR of TRT in base depot with all lead and lift etc.complete.(All labour, materials, tools and plants are to be supplied by the tenderer/contractor only at his own cost | — | — | — | 2,59,855.68 | |
| — | 7180.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Removal of ERC & liners from the exg.PSC sleepers in advance of TRT working during the line block hours as per the instruction of Engineer in charge . Payment will not be made for sleepers opened extra on which fittings are refixed due to any reason. Extra opened are to be refixed by contractor at his own cost as directed by the Engineer-in- charge and no payment will be paid for the same. (All labour, materials, tools and plants are to be supplied by the contractor onlt at his own cost) Note: each unit denotes "each sleeper" | — | — | — | 1,46,759.2 | |
| — | 7178.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Fixing,driving ERC & liners in correct position manually covering the complete day's workincluding adjusting the rubber pads and liners(All labour,materials, tools and plants are to be supplied by the tenderer/contractor only at his own cost Note: each unit denotes "each sleeper | — | — | — | 1,51,599.36 | |
| — | 7178.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Removing the GRP from the PSC sleepers during the TRT work just ahead of picking up of sleeper by TRT and again placing the GRP over the sleepers laid by the TRT duly stocking the GRP suitably by deputing suitable men (atleast 4) in the nominated location of the TRT machine with all lead and lift etc. complete and as directed by the Engineer-in- charge. (All labour and tools are to be supplied by the tenderer/contractor only at his own cos Note: each unit denotes "each sleeper" | — | — | — | 73,574.5 | |
| — | 21.63 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Lifting of track for a length as required at site per block for required height after TRT working to join the track with ytrack lifted by TRT and providing smooth ramp/slope including putting ballast into the track below sleepers and crib portion, levelling and packing to make track fit for safe passage of trains at restricted speed and as directed by the Engineer-in-charge. (All labour and tools are to be supplied by the tenderer/ contractor only at his own cost) (per each block=per block of 200m) Note: each unit denotes "per each block" | — | — | — | 1,84,593.88 | |
| — | 21.63 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Assistance in laying of PSC sleepers using TRT machine including shifting of wooden battens fromthe BRH to another BRH,removal of old entangled/broken sleepers at picking unit/conveyor belts/ platform of TRT and setting right new PSC entangled sleepers at conveyor belt/NTI as directed by the Engineer-in-charge with out loss of time during TRT block working with contractor's labour, tools and plants etc. complete. A minimum of 12 men (for this operation itself) shall be engaged per block working day. (All labour, materials, tools and plants are to be supplied by the Tenderer/Contractor only at his own cost). (each block = per every 200mof progress during block) Note: each unit denotes "each block" | — | — | — | 2,92,273.64 | |
| SW-I CTR(P) for a length of 4.72 km Removing the PSC sleeper and inserting of 8 nos of wooden /steel sleepers in TRT working and releasing the same and inserting the same in the closing point duly trucking steel/ wooden sleeper with contractor's labour and as directed by the Engineer-in-charge. (All labour, materials, tools and plants are to be supplied by the Tenderer/contractor only Note: each unit denotes "per every block" | — | — | — | 22,757.76 | |
| — | 34.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Fish plating the ends of rail panels including drilling two holes of 32mm dia in web of each end of rails and tightening of bolts and nuts as required (All labour and tools are to be supplied by the tenderer/contractor only at his own cost ) Note: joint unit denote: Each joint. | — | — | — | 9,227.94 | |
| — | 7179.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Inserting/spreading MS plate/flat on PSC sleepers for movement of TRT sled with contractor's own labour. MS plate/flat will be made available near the site of work and all handling, leading for stacking point to be done by contractor at his own cost. (All labour, materials, tools and plants are to be supplied by the tenderer/contractor only at his own cost) | — | — | — | 34,674.57 | |
| — | 566.00 | — | — | ||
| SW-I CTR(P) for a length of 4.72 km Unloading 60Kg rail panels at the sites of work from Railway wagons as directed by the Engineer in charge of the work including spreading the same at the cess of the formation not to infringe the running vehicles with all lead and lifts, consumables, crossing the track where ever required etc. complete. (The contractor has to provide adequate trained men to complete unloading quickly within a short block of time and he will not have any claim for idle labour due to non-availability of power on some occations. If required depending upon the availability of block unloading will have to be done at night also for which no extra rate is admissible, but lighting arrangements will be provided by the Railways). (Contractor has to arrange chains with sufficient strength and wire ropes for unloading the rails from BFRs) | — | — | — | 2,05,458 | |
| SW-I CTR(P) for a length of 4.72 km Renewal of existing SEJ with Thick web SEJ with PSC sleepers under traffic block conditions as per approveddrawing including fixing of special size bearing plate, rubberpad and other sleeper / rail fittings, greasing to thefittings, leading rails, sleepers & fittings to site, leading andstacking of released materials within a lead of 250m, cutting ofRails, drilling of holes, fixing of related fittings, providingtemporary connection with fishplates till welding of SEJ isdone and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. 2) One set comprise complete SEJ on both rails at SEJ. | — | — | — | 1,25,630.19 | |
| — | 15.00 | — | — | ||
| SW-II TSR(P) for a length of 2.317 km Loading of new fittings (ie) ERC, GRP, Liners on BFR/BRH at Depot and unloading at site of work during TRT work as instructed by the Engineer - in- charge & placing them on PSC sleepers properly including correct adjusting of fittings in position if gone out of place behind TRT/ clip application. (All labour,materials and tools and plants are to be supplied by the Tenderer/ Contractor only at his own cost) | — | — | — | 5,083.8 | |
| SW-II TSR(P) for a length of 2.317 km Supply of hard/Jungle wooden battens of size 3m x 75mm x 75mm for packing below sleepers at locations specified by the Engineer-in-charge at BFR of TRT in base depot with all lead and lift etc. complete.(All labour, materials, tools and plants are to be supplied by the tenderer/contractor only at his own cost | — | — | — | 92,745.53 | |
| — | 2562.00 | — | — | ||
| SW-II TSR(P) for a length of 2.317 km Removal of ERC & liners from the exg.PSC sleepers in advance of TRT working during theline block hours as per the instruction of Engineer in charge . Payment will not be made for sleepers opened extra on which fittings are refixed due to any reason. Extra opened are to be refixed by contractor at his own cost as directed by the Engineer-in- charge and no payment will be paid for the same. (All labour, materials, tools and plants are to be supplied by the contractor onlt at his own cost) Note: each unit denotes "each sleeper" | — | — | — | 52,367.28 | |
| — | 2562.00 | — | — | ||
| SW-II TSR(P) for a length of 2.317 km Fixing,driving ERC & liners in correct position manually covering the complete day's workincluding adjusting the rubber pads and liners(All labour,materials, tools and plants are to be supplied by the tenderer/contractor only at his own cost Note: each unit denotes "each sleeper" | — | — | — | 54,109.44 | |
| — | 2562.00 | — | — | ||
| SW-II TSR(P) for a length of 2.317 km Removing the GRP from the PSC sleepers during the TRT work just ahead of picking up of sleeper by TRT and again placing the GRP over the sleepers laid by the TRT duly stocking the GRP suitably by deputing suitable men (atleast 4) in the nominated location of the TRT machine with all lead and lift etc. complete and as directed by the Engineer-in-charge. (All labour and tools are to be supplied by the tenderer/contractor only at his own cos Note: each unit denotes "each sleeper" | — | — | — | 26,260.5 | |
| SW-II TSR(P) for a length of 2.317 km Lifting of track for a length as required at site per block for required height after TRT working to join the track with ytrack lifted by TRT and providing smooth ramp/slope including putting ballast into the track below sleepers and crib portion, levelling and packing to make track fit for safe passage of trains at restricted speed and as directed by the Engineer-in-charge. (All labour and tools are to be supplied by the tenderer/ contractor only at his own cost) (per each block=per block of 200m) Note: each unit denotes "per each block" | — | — | — | 65,883.72 | |
| SW-II TSR(P) for a length of 2.317 km Assistance in laying of PSC sleepers using TRT machine including shifting of wooden battens from the BRH to another BRH,removal of old entangled/broken sleepers at picking unit/conveyor belts/ platform of TRT and setting right new PSC entangled sleepers at conveyor belt/NTI as directed by the Engineer-in-charge with out loss of time during TRT block working with contractor's labour, tools and plants etc. complete. A minimum of 12 men (for this operation itself) shall be engaged per block working day. (All labour, materials, tools and plants are to be supplied by the Tenderer/Contractor only at his own cost). (each block = per every 200mof progress during block) Note: each unit denotes "each block" | — | — | — | 1,04,315.88 | |
| SW-II TSR(P) for a length of 2.317 km Removing the PSC sleeper and inserting of 8 nos of wooden /steel sleepers in TRT working and releasing the same and inserting the same in the closing point duly trucking steel/ wooden sleeper with contractor's labour and as directed by the Engineer-in-charge. (All labour, materials, tools and plants are to be supplied by the Tenderer/contractor only Note: each unit denotes "per every block" | — | — | — | 8,534.16 | |
| — | 12.00 | — | — | ||
| SW-II TSR(P) for a length of 2.317 km Fish plating the ends of rail panels including drilling two holes of 32mm dia in web of each end of rails and tightening of bolts and nuts as required (All labour and tools are to be supplied by the tenderer/contractor only at his own cost ) Note: joint unit denote: Each joint. | — | — | — | 3,256.92 | |
| — | 2562.00 | — | — | ||
| — | 579.00 | — | — | ||
| SW-II TSR(P) for a length of 2.317 km "Providing lighting arrangements on hiring basis with contractor's supply of tube lights of 40Wwith necessary fittings duly fitted on casurina/bamboo post which should be firmly fixed on the ground at 2.50mto 3.50m away from the center of the track and also the bottom of tube light shall be at 1 to 1.50m above raillevel along both sides of the track at an interval of 7m to 10m for a distance of 1000m approximately duringnight time working of the TRT machine as per stipulated norms and lighting the same by using 4 nos. of contractor's supply of portable generator along with one standby (Total 5 nos) of 3 KVA or higher capacityincluding all luminaries, cables, fuels etc. 2 nos of genset should be placed on one side of track and other 2 nos.on the other side of the track at the middle of the workspot. "No cable or wire should cross the track. Thecontractor shall provide an electrician/operator and 3 helpers available for uninterrupted lighting at workspotincluding fixing and removing the lighting set and poles, transporting and refixing for next day's work. Alllabour, operator, luminaries, fittings, fuels and minor repairs etc. has to be borne by the contractor only. Thelighting should be made available between 20 hrs and 6 hours of maximum duration of 10 hours. It is theresponsibility of the contractor to ensure safe custody of all lighting arrangements and genset. The lighting shallbe made available even during rain also.(All labour, tools and plants, labour, operator, luminaries, fittings, fuels and minor repairs etc.are to be borne by contractor's own cost)"Note:- Each denotes each tubelight | — | — | — | 74,250.96 | |
| — | — | — | Above/ 15327619.41 Below/P |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril22.pdf
ATTACHMENT
Regulations.pdf
ATTACHMENT
BidsecuAnnexureVIAandVIB.pdf
ATTACHMENT
NEWPerformaofBGtowardsPG.pdf
ATTACHMENT
AnnexureVA.pdf
ATTACHMENT
ClarificationregsubmissionofAnnexV.pdf
ATTACHMENT
CorrectionslipNo1.pdf
ATTACHMENT
Correctionslip2toGCC2022.pdf
ATTACHMENT
Correctionslip3.pdf
ATTACHMENT
Correctionslip42022-CE-I-CT-GCC-2022-Policy.pdf
ATTACHMENT
CorrectionslipNo5.pdf
ATTACHMENT
CorrectionslipNo6ofGCC2022.pdf
ATTACHMENT
CorectionslipNo7-2022-CE-I-CT-GCC-2022-POLICY-Pt.Idated25.09.2024.pdf
ATTACHMENT
GCCCorrectionslip8.pdf
ATTACHMENT
GCCCorrectionslip9.pdf
ATTACHMENT
GCC2022ACS10.pdf
ATTACHMENT
Generalconditionoftrack.pdf
ATTACHMENT
SafetyprecautionsfromTRDsideforenggtenderdoc.pdf
ATTACHMENT
NewSplconditionCTRTRR.pdf
ATTACHMENT
LocationTRT.pdf
ATTACHMENT
SplConditionTRT.pdf
ATTACHMENT
CorrectionSlip11_1.pdf
ATTACHMENT
CommonconditionBCUSSOR2021--.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .