Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance NO 10 544 THANEERPANTHAL KANNADI KINASSERY 678701 | KINASSERY | PALAKKAD | KERALA | 678701 | ₹1.9 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹2.1 L+₹18,627 (9.73%)Accepted-Finance KALAYIL PUTHUPARAMBIL HOUSE THACHAMBARA P O PALAKKAD 678593 | PALAKKAD | PALAKKAD | KERALA | 678593 | ₹2.1 L+₹18,627 (9.73%) | L2 | Accepted-Finance Second Lowest |
Tender Value
Refer Docs
EMD Value
₹4,566
Closing Date
3 Aug 2026, 4:00 pmClosed
Assistant Executive Engineer
MVIP Mechanical Subdivision, Thodupuzha, Muttom
Overhauling of the reduction gearbox and electromagnetic brakes, replacement of worn-out components, painting of shutters and hoisting mechanisms, lubrication of all hoisting system components, fabrication and fixing of brackets.
2026_Irrig_858939_1
IRR/MH/TR/2601/2025_16_2_1/1
Open Tender
Repair and Maintenance Works
Item Rate
Malankara Dam
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹4,566
Yes
19 Sept 2026
4 Jul 2026
5 Aug 2026
4 Jul 2026
3 Aug 2026
4 Jul 2026
4 Jul 2026 - 3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Emergency repair to RBMC shutter No 1 at Malankara dam | |||||
| 1.001 | OD45794/2025-2026:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embeded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery labour etc. complete as directed by the departmental officer at the site. | 1 | kilogram | 4.45 | ₹4.45 |
| 1.002 | OD54279/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges., | 0.4 | kg | 95.38 | ₹38.15 |
| 1.003 | OD54290/2025-2026:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge /Platform and accessories etc. for the same as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental
and handling charges etc complete but excluding cost of material already supplied., | 0.4 | kilogram | 62.38 | ₹24.95 |
| 1.004 | OD45813/2025-2026:supply and fixing of SS chemical anchor bolts M20 X 120 (Hilti or equivalent) including cost of threaded rod,chemical and labour etc. complete. | - | no | 3,010.61 | - |
| 1.005 | OD45815/2025-2026:Bend checking and correction of EN-8, 53mm OD screw rod, including cost of all labour, conveyance all lead and lifts etc.complete. | 1 | metre | 1,290.94 | ₹1,289.65 |
| 1.006 | OD47593/2025-2026:Supply of helical worm gear 32 teeth thick 46.8mm also finishing the outer diameters , finishing the bore and cut internal threads in the bore to match with the 53 mm dia screw shaft including cost of all materials,labour,lead etc.. complete | - | no | 22,714.76 | - |
| 1.007 | OD47605/2025-2026:Overhauling and Refitting newly supplied worm wheel assembly with existing worm shaft and its new support bearings
along with screw shaft with size 53 mm along with manual operating mechanism as per the directions of dept officers at site. | - | no | 28,607.67 | - |
| 1.008 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | - | sqm | 494.79 | - |
| 1.009 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | - | sqm | 252.1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1452179.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1452179.xls
BOQ • 0.33 MB
preliminaryagreement.pdf
Tender Documents • 0.05 MB
form.pdf
Other Document • 0.04 MB
viewnit.pdf
Tender Documents • 0.03 MB
affidavit.pdf
Other Document • 0.04 MB
integrity.pdf
Other Document • 0.03 MB
requisition.pdf
Other Document • 0.03 MB
viewsbd.pdf
Tender Documents • 1.64 MB
secondextn.pdf
PDF • 0.08 MB
firstextn.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .