Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC | ₹4.3 Cr Quoted ₹3.8 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹3.9 CrRejected-Finance | ₹3.9 Cr | L2 | Rejected-Finance L-2 |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
15 Apr 2026, 5:00 pmClosed
S.E. JNR Circle HPPWD Joginder Nagar
S.E. JNR Circle HPPWD Joginder Nagar
ROFD, R/walls, B/walls Gabion walls, M/T, Cross Drainage work, Drain, Parapets, Crash Barriers and Citizen information Board, Logo Board, KM stone and 200 Metre stone and five years routine maintenance)
2026_CEHP_147177_1
PW-SE-JNR-WS-WA-III Tender Publication /2025-26-11683-732 Dated 27.03.2026
National Competitive Bid
Civil Works - Roads
365 days
Padhar
As per bid documents
8 documents required · 8 mandatory
₹7,000
₹8.8 L
12 Jun 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
15 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damages to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out of rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawing and as directed by the Engineer-in-Charge in conformity with the requirement of MoRD technical specification for Rural Road, Section. 300 & 1600 to achieve designed formation width including hauling and stacking of materials useful for construction at suitable sites safe manner and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load and animal transport and mechanical means along with its leveling, fine dressing and carriage of machineries, tools, equipment’s and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. During the mobilization period, contractor should take the advanced x-sec in 15 m (fifteen metre) interval of whole road length in the presence of Engineer-in-charge or his representative. In case the advanced x-section has been taken in the presence of Engineer-in-Charge representative, in that case the same has to be got approved from Engineer-in-Charge. The land for dumping sites shall be arranged by the contractors himself and nothing extra shall be paid on this account, filling of unevenness blind age and finishing of the road to specified dimensions or as directed by the Engineer in-charge for smooth riding. The recovery for stones, whether useful or 65.75 (sixty Five point Seven Five) cubic metre at the rate of Rs 300/-only (Rupees three hundred only) per cubic meter shall be effected on prorata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government but excluding GST. | ||||||
| 2Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drain and Parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks (Where blasting is prohibited) as per drawings and MORD technical specification section 300 and 1600 and as per direction of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and lift including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layer not executing 150 mm (one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth any quantum of water including cleaning of slush which may arise out during dewatering complete as per direction of Engineer in-Charge. Including carriage of materials within all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government but excluding GST. | ||||||
| 3Loosening of the ground upto a level of 300 mm (three hundred millimetres) below the subgrade level, watered, graded with motor grader and compacted in layers to meet requirement of Tables 300. 1 and 300. 2 of MORD with three wheel 80-100 (eighty to one hundred) kN static roller for subgrade construction as per MORD Technical Specification section 300. as per direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government but excluding GST. | ||||||
| 4Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with in all lifts and leads, transporting to site, spreading, grading by mechanical means to required slope and compacted with three wheel 80-100 (eighty to one hundred) kN static roller to meet requirement of Table 300. 2 complete as per MORD technical Specification section 300 & 1600 and as per direction of Engineer-in-charge including carriage of materials within all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government but excluding GST. | ||||||
| 5Construction of 1st (first) layer Bio enzyme (100 mm) (one hundred millimetre) based soil stabilised layer (accredited by IRC) to a required thickness as per manufacturer design with local soil material/gravel/moorum, having CBR greater than Equal to 5% (Five percent) and treating it with Bio Enzyme in the ratio 1L (one litre) for 12. 5 per cum (twelve point five cubic metre) soil, spreading in uniform layer with motor grader on prepared surface. mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density complete as per technical specification including all labour, materials, like soil and metal, equipment etc. , complete, including Supervision (Supervisor shall be provided by Bio Enzyme Vendor) as per the directions of the Engineer incharge of the work. Bio Enzyme Supervisor accommodation, food and local transport will be in scope of Contractor. The soil will have clay percentage by hydrometry between 8% to 30%, (eight percent to thirty percent) including carriage of material within all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government excluding GST. | ||||||
| 6Construction of 2nd (second) layer Bio enzyme (75 mm) (seventy five millimetre) based soil stabilised layer (accredited by IRC) to a required thickness as per manufacturer design with local soil material/gravel/murram, having CBR greater than Equal to 6% (six percent) and treating it with Bio Enzyme in the ratio 1L (One litre) for 15. 0 per cum (fifteen point zero per cubic metre) soil with 25% (twenty five percent) 40mm (forty millimetre) crusher broken metal (of compacted thickness) in design mix, spreading in uniform layer with motor grader on prepared surface. mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density complete as per technical specification including all labour, materials, like soil and metal, equipments etc., complete, including Supervision (Supervisor shall be provided by Bio Enzyme Vendor) as per the directions of the Engineer incharge of the work. Bio Enzyme Supervisor accommodation, food and local transport will be in scope of Contractor. The soil will have clay % (percent) by hydrometry between 8% to 30% (eight percent to thirty percent), including carriage of material within all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government excluding GST. | ||||||
| 7Applying of curing material Terra Cure after the application of Bio Enzyme layer (accredited by IRC) for by mixing Terra Cure with water in the ratio of 1:200 (one isto two hundred) and then applying the mixed solution @ 3 (at the rate three) litre for 1 sqm (one square metre) including carriage of material within all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government excluding GST. | ||||||
| 8Providing, laying, spreading and compacting by mechanical means of crushed stone aggregate size 53mm to 22.4mm (fifty three millimetre to twenty two point four millimetre) Grading- III [75mm (seventy five millimetre) consolidated thickness] to water bound Macadam specification including spreading in uniform thickness using template, hand packing, rolling with three wheel 80-100 kN (eight to one hundred kilo newton) static roller in stages to proper grade and camber, including applying and brooming, stone screening type-B of size 11.2mm (eleven point two milimetre) nominal size at the rate of 0.18 cum (zero point one eight cubic metre) per ten square metres and to fill up the interstices of coarse aggregate, watering and compacting to the required density as per M.O.R.D. technical specifications section 400 and as per the entire satisfaction and direction of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidental. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government excluding GST. | ||||||
| 9Prime Coat Preparing and applying of water soluble organo silane Nano technology (for bitumen emulsion application, IRC accredited) with cationic bitumen emulsion CSSI and water <1000 (greater than one thousand) ppm TDS in the ratio of 1. 00 (One) kilogramme organo silane nanotechnology: 100 (One kilogramme) cationic bitumen emulsion CSS I. 00 (one):200 (two hundred) litre water Mixing & Spraying: Take 1. 00 (one) Kilogramme of organo silane nanotechnology and add in 200 (two hundred) litre water while filling water in tanker/drum and then add 100 (One hundred) cationic bitumen under circulation. Mix the solution completely. Spray the solution @1. 00 kg (one Kilogramme) per square metre on compacted surface. Rate including all materials labour hire charges of machinery etc. complete as per MoRD specifications clause 502 & direction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidental The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government excluding GST. | ||||||
| 10Tack Coat Preparing and applying of water soluble organo silane nanotechnology (for bitumen emulsion application IRC accredited with cationic bitumen CRSI and water<1000 (greater than one thousand)ppm TDS in ratio of 1. 00 (one) kilogramme organo silane:100 (one) killogramme cationic bitumen emulsion CRS I. 00: 200 One is to two hundred) litre water. Mixing & Spraying: Take 1. 40 (One point four zero) litre of organo silane nanotechnology and add in 200 (two hundred) litre water while filling water in tanker/ drum and then add 100. 00 (One hundred) litre cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution @ 0. 3-0. 4 (zero point three to zero point four) kilogramme per square metre on compacted base. Rate including all materials labour hire charges of machinery etcetera complete as per MoRD specifications clause 503 & direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidental. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government excluding GST. | ||||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_229009.xls
BOQ • 0.35 MB
SBD.pdf
Tender Documents • 11.35 MB
Download all tender documents and submit your bid