| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-Finance | 1 | Accepted-Finance Lowest | |
| 2 | 2₹3.9 L+₹40,516.60 (11.5%)Accepted-Finance ALAPATKIZHAKKUDAN HOUSE ATTORE KUTTUR P O THRISSUR | THRISSUR | THRISSUR | KERALA | 2 | Accepted-Finance Highest |
| Sl No | Description | Qty | Unit | WILSON O J L1 | JOSE K C L2 |
|---|---|---|---|---|---|
| 1.00Annual maintenance | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 200 | sqm | 7.6 ₹1,520 Lowest | 8.67 ₹1,734 |
| 1.00 | OD19549/2026-2027:Engaging man mazdoor as per the direction of departmental officers at site | 7 | each | 900 ₹6,300 | 500 ₹3,500 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 5 | cum | 257.63 ₹1,289.44 | 243 ₹1,216.22 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5 | cum | 6,585 ₹32,957.93 Lowest | 7,420 ₹37,137.1 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 173.25 | sqm | 321 ₹55,613.25 Lowest | 363 ₹62,889.75 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 27.53 | cum | 6,943 ₹1,91,126.9 Lowest | 7,850 ₹2,16,094.8 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.33 | cum | 7,965 ₹34,496.42 Lowest | 8,636 ₹37,402.52 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 103.95 | sqm | 285 ₹29,625.75 Lowest | 322 ₹33,471.9 |
Tender Value
₹4.2 L
EMD Value
₹10,583
Closing Date
22 Sept 2026, 10:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer Irrigation Sub Division Thrissur
GENERAL PSM Imp 2026 27 Improvement works to Kolazhy Branch canal between Ch 0 300 0 600 Km for the year 2026 27 General Civil Work
2026_Irrig_870453_1
IRR/IA/TR/1289/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Kolazhy
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
₹10,583
12 Oct 2026
16 Sept 2026
23 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual maintenance | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 200 | sqm | - | - |
| 1.002 | OD19549/2026-2027:Engaging man mazdoor as per the direction of departmental officers at site | 7 | each | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 5.01 | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.01 | cum | - | - |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 173.25 | sqm | - | - |
| 1.006 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 27.53 | cum | - | - |
| 1.007 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.33 | cum | - | - |
| 1.008 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 103.95 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1474897.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.24 MB
Epaymentform.pdf
Tender Documents • 0.02 MB
FormofTenderandAffidavit.pdf
Tender Documents • 0.04 MB
Integritypact.pdf
Tender Documents • 0.02 MB
BOQ_1474897.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .