Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC H NO 19 6 243 1 NGO S COLONY SHIV NAGAR NORTH BIDAR 585401 | BIDAR | KARNATAKA | 585401 | L1 | Accepted-AOC L1 and reasonable | |
| 2 | L2₹22.0 L+₹36,253.90 (1.68%)Rejected-AOC | L2 | Rejected-AOC Not L1 | |
| 3 | L3₹22.8 L+₹1.2 L (5.34%)Rejected-AOC | L3 | Rejected-AOC Not L1 | |
| 4 | L4₹23.0 L+₹1.3 L (6.17%)Rejected-AOC | L4 | Rejected-AOC Not L1 | |
| 5 | L5₹24.5 L+₹2.8 L (13.0%)Rejected-AOC | L5 | Rejected-AOC Not L1 |
| Sl No | Description | Qty | Unit | M/S RUDRAPPA CONSTRUCTIONS L7 | Siddique constructions L4 | M/s.Santosh Kotarki L3 | Mr Madhusudhan Kotarki L6 | AMAR CONSTRUCTION L5 | Satish Patpally L2 | RAMESH CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00SCHEDULE OF WORKS | ||||||||||
| 1.00 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc, including removal of debris outside MD land, complete all as specified and as directed. | 344 | Square Metre | 100 ₹34,400 | 50 ₹17,200 | 50 ₹17,200 | 65 ₹22,360 | 50 ₹17,200 | 40 ₹13,760 Lowest | 45 ₹15,480 |
| 2.00 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for roof /chajja padding including removal of debris outside MD land, complete all as specified and as directed. | 5 | Cubic Metre | 1,700 ₹8,500 | 600 ₹3,000 | 500 ₹2,500 | 500 ₹2,500 | 490 ₹2,450 | 500 ₹2,500 | 450 ₹2,250 Lowest |
| 3.00 | Material & Labour for Plain cement Concrete 1:2:4 type B-0 (using 12.5mm grades stone aggregate) as in Padding over roof / chajja, complete all as specified and as directed. | 5 | Cubic Metre | 8,600 ₹43,000 | 7,500 ₹37,500 | 6,800 ₹34,000 Lowest | 7,800 ₹39,000 | 7,300 ₹36,500 | 7,500 ₹37,500 | 7,200 ₹36,000 |
| 4.00 | Material & Labour Rendering 5mm thick on fair faces of concrete surface of ceiling in CM 1:3, surface finished even and smooth surface without using extra cement, complete all as specified and as directed. | 30 | Square Metre | 220 ₹6,600 | 200 ₹6,000 | 170 ₹5,100 Lowest | 220 ₹6,600 | 200 ₹6,000 | 200 ₹6,000 | 180 ₹5,400 |
| 5.00 | Material & Labour Rendering 10mm thick on fair faces of brick work or concrete surface in CM 1:6 surface finished even and smooth without using extra cement, complete all as specified and as directed. | 114 | Square Metre | 250 ₹28,500 | 205 ₹23,370 | 180 ₹20,520 Lowest | 220 ₹25,080 | 230 ₹26,220 | 220 ₹25,080 | 200 ₹22,800 |
| 6.00 | Material & Labour Rendering 15mm thick on brick work or concrete surface in CM 1:4 including WPC, complete all as specified and as directed. (WPC measured and paid separately). | 200 | Square Metre | 275 ₹55,000 | 215 ₹43,000 | 250 ₹50,000 | 200 ₹40,000 | 190 ₹38,000 Lowest | 250 ₹50,000 | 210 ₹42,000 |
| 7.00 | Supply only Liquid water proofing compound, complete all as specified and as directed. | 7.42 | Litre | 300 ₹2,226 | 150 ₹1,113 | 160 ₹1,187.2 | 90 ₹667.8 | 55 ₹408.1 Lowest | 100 ₹742 | 180 ₹1,335.6 |
| 8.00 | Preparation of newly plastered surfaces of wall and applying two coats of cement based paint over one coat of primer complete all as specified and as directed. | 80 | Square Metre | 80 ₹6,400 | 46 ₹3,680 | 50 ₹4,000 | 110 ₹8,800 | 105 ₹8,400 | 50 ₹4,000 | 45 ₹3,600 Lowest |
| 9.00 | Preparation of newly plastered surfaces on wall and applying two coats of oil bound distemper over one coat of primer on wall surfaces complete all as specified and as directed. | 114 | Square Metre | 70 ₹7,980 | 100 ₹11,400 | 100 ₹11,400 | 25 ₹2,850 Lowest | 120 ₹13,680 | 80 ₹9,120 | 90 ₹10,260 |
Tender Value
₹21.5 L
EMD Value
₹43,000
Closing Date
14 Apr 2026, 6:00 pmClosed
GE (AF) Bidar
Garrison Engineer (Air Force) Bidar, Military Engineer Services, Air Force Station Bidar, Bidar-585401
REPAIRS TO WALLS, FLOORING, ROLLING SHUTTER AND ALLIED WORKS AT AFS BIDAR
2026_MES_757517_1
CA NO. GE(AF)/BID/TOKEN/ 73 OF 2025-2026 8224/E8
Open Tender
Civil Works
Item Rate
180 days
Bidar
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) Bidar
₹43,000
Yes
27 Jul 2026
24 Mar 2026
21 Apr 2026
24 Mar 2026
14 Apr 2026
7 Apr 2026
24 Mar 2026 - 6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0SCHEDULE OF WORKS | |||||
| - | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc, including removal of debris outside MD land, complete all as specified and as directed. | - | Square Metre | - | - |
| - | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for roof /chajja padding including removal of debris outside MD land, complete all as specified and as directed. | - | Cubic Metre | - | - |
| - | Material & Labour for Plain cement Concrete 1:2:4 type B-0 (using 12.5mm grades stone aggregate) as in Padding over roof / chajja, complete all as specified and as directed. | - | Cubic Metre | - | - |
| - | Material & Labour Rendering 5mm thick on fair faces of concrete surface of ceiling in CM 1:3, surface finished even and smooth surface without using extra cement, complete all as specified and as directed. | - | Square Metre | - | - |
| - | Material & Labour Rendering 10mm thick on fair faces of brick work or concrete surface in CM 1:6 surface finished even and smooth without using extra cement, complete all as specified and as directed. | - | Square Metre | - | - |
| - | Material & Labour Rendering 15mm thick on brick work or concrete surface in CM 1:4 including WPC, complete all as specified and as directed. (WPC measured and paid separately). | - | Square Metre | - | - |
| - | Supply only Liquid water proofing compound, complete all as specified and as directed. | - | Litre | - | - |
| - | Preparation of newly plastered surfaces of wall and applying two coats of cement based paint over one coat of primer complete all as specified and as directed. | - | Square Metre | - | - |
| - | Preparation of newly plastered surfaces on wall and applying two coats of oil bound distemper over one coat of primer on wall surfaces complete all as specified and as directed. | - | Square Metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_848526.xls
BOQ • 0.62 MB
Tender8224.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .