Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
2 Sept 2026, 6:00 pm
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_321858_13
81 REW Samba of 2026-27 Dated-20-08-2026
Open Tender
Civil Works
Percentage
30 days
Nud
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹5,880
22 Aug 2026
22 Aug 2026
3 Sept 2026
22 Aug 2026
2 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities
not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 99.54 | sqm | 24.12 | ₹2,400.9 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth lead upto 25m in All kinds of soil | 15.17 | cum | 479 | ₹7,266.43 |
| 3 | P/L in position cement conc. 1:5:10 mix Of specified grade excluding the cost of centring & shuttering using 40mm N/ size agg. | 8.7 | cum | 4,826.5 | ₹41,990.55 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 14.2 | cum | 5,733.6 | ₹81,417.12 |
| 5 | supplying and carrying of sotnes | 6.17 | cum | 700 | ₹4,319 |
| 6 | Centering and shuttering including strutting propping etc and removal of formwork | 106 | sqm | 286.35 | ₹30,353.1 |
| 7 | Cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) | 0.52 | cum | 6,591.2 | ₹3,427.42 |
| 8 | 12mm thick cement plaster (1:6) | 42.66 | sqm | 266 | ₹11,347.56 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) excluding the cost of centring & shuttering. | 0.87 | cum | 7,788.4 | ₹6,775.91 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete (Thermo-Mechanically Treated bars of grade Fe-500D or more). | 60.96 | kg | 123.2 | ₹7,510.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_1076245.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].