Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | -19.51% | ₹2.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹2.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | -5.00% | ₹3.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹6,800
Closing Date
11 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of drain from Farooq Ahmad Khan to Panchayat and Main road to Hanfia Eidgah, Under ADP (PRI) FY 2026-27, Panchayat Halqa Buran Zangam A, Block Pattan
2026_RDPR_317517_4
152/Xen/Rew/Bla/2026-27 Dated 23-07-2026
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹6,800
27 Aug 2026
23 Jul 2026
12 Aug 2026
23 Jul 2026
11 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. | - | Cum | - | - |
| 2 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) : Wet | 1 | Cum | 1 | ₹1 |
| 3 | Providing/Laying Stone soling hand packed on level in foundation trenches incl all carraiges of material. | 1 | Cum | - | - |
| 4 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M 10 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level). | - | Cum | - | - |
| 5 | 20% Plum in 1:3:6 cement concrete. | - | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. | 1 | Sqm | - | - |
| 7 | 12 mm cement sand plaster in 1:6 mix. | - | Sqm | 1 | - |
| 8 | Providing and fixing of Information sign board and three stage photographs (Pre, post and during execution) | - | Job | - | - |
| 9 | Carriage of Sand & Crusher Bajiri for an average lead of 25 Km. | 1 | Cum | - | - |
stage.html
html • 0.02 MB
finance_1040850.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1040850.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].