| Sl No | Description | Qty | Unit | SAJI P L1 | Divakaran L2 |
|---|---|---|---|---|---|
| 1.00Annual maintenance to the temple structure | |||||
| 1.00 | OD175680/2026-2027:Labour charges for cleaning inside portions of the temple and clearing the waste-Mancolie | 2 | each | 1,039.85 ₹2,079.7 Lowest | 1,106.22 ₹2,212.44 |
| 1.00 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 5 | sqm | 557.06 ₹2,785.3 Lowest | 592.62 ₹2,963.1 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.33 | cum | 8,874.75 ₹2,928.67 Lowest | 9,441.22 ₹3,115.6 |
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 6 | sqm | 54.29 ₹325.74 Lowest | 57.76 ₹346.56 |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 6 | sqm | 355.3 ₹2,131.8 Lowest | 377.98 ₹2,267.88 |
| 1.01 | OD175887/2026-2027:Engaging labour for repair and maintenance to the Doors and windows: Carpenter second class | 2 | each | 1,151.09 ₹2,302.18 Lowest | 1,224.56 ₹2,449.12 |
| 1.01 | 24.2:Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works. | 17 | sqm | 343.39 ₹5,837.63 Lowest | 365.31 ₹6,210.27 |
| 1.01 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). | 2,700 | sqm | 90.05 ₹2,43,135 Lowest | 95.8 ₹2,58,660 |
| 1.01 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 475 | sqm | 104.31 ₹49,547.25 Lowest | 110.97 ₹52,710.75 |
Tender Value
₹3.4 L
EMD Value
₹8,500
Closing Date
3 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer TDB, Nandancode, Thiruvananthapuram-3
T-74 Trivandrum group -Chengalloor Devaswom -Annual maintenance to the temple structure in 1202 ME
2026_TDB_882824_18
TDB/EET/14/57-80/2026-27
Open Tender
Civil Works - Others
Item Rate
20 days
Thiruvananthapuram
refer NIT
7 documents required · 7 mandatory
₹885
₹8,500
4 Nov 2026
27 Oct 2026
4 Nov 2026
27 Oct 2026
3 Nov 2026
27 Oct 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual maintenance to the temple structure | |||||
| 1.001 | OD175680/2026-2027:Labour charges for cleaning inside portions of the temple and clearing the waste-Mancolie | 2 | each | - | - |
| 1.002 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 5 | sqm | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.33 | cum | - | - |
| 1.004 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 6 | sqm | - | - |
| 1.005 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 6 | sqm | - | - |
| 1.006 | OD175887/2026-2027:Engaging labour for repair and maintenance to the Doors and windows: Carpenter second class | 2 | each | - | - |
| 1.007 | 24.2:Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works. | 17 | sqm | - | - |
| 1.008 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). | 2,700 | sqm | - | - |
| 1.009 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 475 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_1503441.xls
BOQ • 0.31 MB
18SBD6511ET74.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .