Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹48.0 L
EMD Value
₹95,960
Closing Date
19 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
DEHYDRATION SERVICING PERIODICAL TESTING AND MAINTENANCE OF 11 433V TRANSFORMERS INSTALLED AT VARIOUS SUBSTATIONS AND ALLIED WORKS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) DM VISAKHAPATNAM
2026_MES_796299_1
8618/C/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Naval Dockyard Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹500
GE (I) DM Visakhapatnam
₹95,960
Yes
29 Oct 2026
29 Oct 2026
21 Nov 2026
29 Oct 2026
19 Nov 2026
12 Nov 2026
30 Oct 2026 - 10 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for opening of top cover in situ or at wksp by unscrewing all nuts, bolts & washers, daining out transformer oil upto required level and keeping in clean container for repair/replacement of HT/LT bushings, tap changer, physical check of any defects, for lifting of core assy, for cleanning/repair and refixing top cover complete with RC 70 C rubberised cork sheet gusket sheet , existing/new nuts, bolts & washers for transformer indoor/outdoor type, refilling of oil for transformer capacity 250 KVA to 750 KVA all as specified and directed.
Note:- (a) HT/LT bushings, Studs, tap changers, nuts, bolts & washers required new shall be mesured separately here-in-after (b) RC 70C rubberized cork sheet shall be inclusive of quoted rated. | 25 | Each Job | - | - |
| 2 | All as per item No. 1.00 above, but for transformer capacity 1000 KVA to 1600 KVA, 11/0.415 KV
Note for serial item No 1 to 2 :-
(a) New transformer oil to be bought in company sealed ISI marked container with test certificate
(b) Filtration /dehydration of transformer oil shall be carried out at the location where transformer is installed and required pipe connection from filter machine to transformer shall be made and rate shall be inclusive of quoted rate.
(c) Necessary filter/dehydration plant having pressure gauge, hour meter, temperaturature gauge to be brought at site by contractor and to be kept permanently inside ND (V) till completion of work and rate deemed to be included in the quoted rate. In any condition, in-out of the filter machine during the progress of the work will not be allowed.
(d) Transformer oil test report before and after dehydration/filtration shall be submitted duly authenticated by state Govt CEIG, Directorate of Electrical safety Licence for testing of Di-electric strength of Transformer oil and issue of test certificate. | 10 | Each Job | - | - |
| 3 | M&L for dismantling of HT/LT porcelain insulator after dismantling cables at outside & transformer terminal at inside of transformer for rectification of oil leakage through insulator or for replacement of insulator or for replacement of brass stud by taking out unsv gusket from inside & outside bushing and replacement with RC 70 C rubberised cork sheet gusket of proper thickness, reassemble old/new insulator, brass stud, HT/LT cable connection, HT/LT transformer inside terminal connection to original position all as specified and directed.
Note: (a) Opening of top cover measured separately (b) porcelain insulator HT/LT & Brush stud with nuts & bolts required new shall be measured as supply only. (c) Silicon sheet gusket shall be inclusive of quoted rate. | 35 | Each Job | - | - |
| 4 | Supply only transformer porcelain bushing outdoor/indoor type suitable for 11 KV grade complete of transformer capacity 250KVA to 3000 KVA, 11/0.415 KV transformer complete all as specified and directed. (Transformer bushings shall be compitable model with make and model of existing transformer) | 6 | Each | - | - |
| 5 | M & L for filtration/dehydration transformer oil of transformer voltage grade 11/0.415 KV, capacity 250 KVA to 3000 KVA indoor/outdoor type, floor mounted in situ till achieve dielectric strength minimum 40 KV at 4mm gap all as specified and directed. | 20,000 | Ltr | - | - |
| 6 | M & L for topping up/replacement of transformer oil with new transformer oil suitable for working voltage 11000 volts grade including necessary dehydration to achieve dielectric strength min 40 KV at 4mm gap complete all as specified and directed. | 1,500 | Ltr | - | - |
| 7 | Periodical servicing of complete transformer at every alternate 3 month by cleaning of complete outside surface, observing any oil leakage from any point, rectify by replacing with suitable RC 70 C rubberised cork sheet gusket to keep the complete outside surface dry all as specified and directed.
Note- (i) replacement of silicon gusket other than at top cover and bushings shall be carried out and rate shall be inclusive of quoted rate. (ii) rectification of leakage from top cover and from bushing shall be measured and paid separately in the schedule (iii) Works under warantee period will not be measured in repitation | 210 | Each Job | - | - |
| 8 | M&L for complete painting of transformer outer surface in situ/wksp with one coat of synthetic enamel paint using sprayer for transformer capacity 250-1600 KVA after prliminary preparation of old painted surface .
Note : (i) During process of painting, transformer will be under shut down for the period and the rate deemed to be included for running the sprayer machine with alternative arrangement by contractor. (ii) After completion of painting HT/LT outdoor bushing, cable termination joint, Oil inspection glass, meters and name plates to be made clean using volatile cleanner | 20 | Each Job | - | - |
| 9 | M&L for testing of transformer 250 KVA to 1600 KVA, 11/0.415 KV at various location by following test for HV & LV complete
(a) Insulation Registance (b) Winding resistance (c) Turn ratio (d) Magnetic balance, (e) Oil BD value
Note: Required testing equipment for transformer test shall be brought by the contractor and rate shall be inclusive of quoted rate | 15 | Each Job | - | - |
| 10 | M&L for replacement of new silica gel blue granives in place of light pink colour in the breather assembly of transfromer complete all as specified and directed. | 10 | Kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
8618Tender.pdf
Tender Documents • 0.97 MB
BOQ_893147.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .