| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 LAccepted-AOC | ₹32.4 L Quoted ₹34.0 L | L1 | Accepted-AOC awarded |
| 2 | L2₹36.4 LRejected-Finance | ₹36.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹37.6 LRejected-Finance | ₹37.6 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Shivashish L3 | Vikal Sood L1 | Chitar Singh L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 metres Chiselling / Wedging out of rock where blasting is prohibited :- soft rock complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge. Chiselling work = 70% , Jumper Work = 30 % | 1,716 | Cum | 1,750 ₹30.0 L | 1,600 ₹27.5 L | 1,700 ₹29.2 L |
| 2.00 | Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/hard rock , where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting , planking, timbering and dewatering where ever required. Stacking usable and unusable material /soil seperataly and after laying, jointing and testing of pipes (for pipes only), returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per direction of the Engineer-in-charge. | 11.25 | Cum | 550 ₹6,187.50 | 500 ₹5,625 | 550 ₹6,187.50 |
| 3.00 | Providing and laying cement concrete 1:4:8 (1 cement:4sand:8 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts and to the enitre satisfaction of Engineer-in- charge. | 1.8 | Cum | 7,900 ₹14,220 | 7,800 ₹14,040 | 8,000 ₹14,400 |
| 4.00 | Providing and laying cement concrete 1:2:4(1cement:2sand:4graded crushed stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced work in:- Foundation and plinth complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge. | 2.7 | Cum | 11,000 ₹29,700 | 10,500 ₹28,350 | 10,600 ₹28,620 |
| 5.00 | Providing and laying cement concrete 1:2:4(1cement:2sand:4graded crushed stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced work in:- Columns piillar post. etc complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge. | 10 | Cum | 11,000 ₹1.1 L | 10,500 ₹1.1 L | 10,600 ₹1.1 L |
| 6.00 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give a fair finish including centring,shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtr. and removal of the same for insitu -reinforced concrete and plain concrete work in : Columns piillar post. etc complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge. | 23.04 | Sqm | 630 ₹14,515.20 | 680 ₹15,667.20 | 650 ₹14,976 |
| 7.00 | Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete including the cost of binding wire in complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge. | 762 | Kg. | 105 ₹80,010 | 102 ₹77,724 | 100 ₹76,200 |
| 8.00 | Steel work welded in built up sections, trusses and framed work, i/c cutting, hoisting, fixing in position and applying a priming coat of red lead paint. I) In beams, joists, channels, angles,tees, flats with connectin plates of angle cleets as in main and cross beams, hip and jack rafters, purlins connected to common rafters & the like. including all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 200 | Kg. | 150 ₹30,000 | 130 ₹26,000 | 125 ₹25,000 |
| 9.00Providing, laying,jointing and testing of HDPE pipes in trenches to required grades as per IS:4984-1985 latest with up to date amendments of following OD pipes, material grade and class of pipes. The jointing of pipes should be done by way of butt fusion welding as per relevant IS code and specifications including all fittings and accessories e.g. coupling, tee, bends, reducers, screwed adopters, flanged tail pieces etc. complete in all respect. | ||||||
| 9.01 | 110 mm dia PE-80 PN 4.00 | 700 | Rmt. | 680 ₹4.8 L | 550 ₹3.9 L | 650 ₹4.5 L |
Tender Value
₹28.6 L
EMD Value
₹57,148
Closing Date
10 Mar 2025, 5:00 pmClosed
EE Jal Shakti Division Larji
EE Jal Shakti Division Larji
(SH- Re- Alignment of Gravity main , Patra cutting , Providing HDPE pipe line and other misc. Works due to C/O Deori palach srikot road )
2025_HPIPH_101026_1
Reno. Kalwari plach 17093-17192 dt. 01/03/2025
Open Tender
Civil Works
60 days
Banjar
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,500
EE Larji
₹57,148
30 Apr 2026
3 Mar 2025
11 Mar 2025
3 Mar 2025
10 Mar 2025
3 Mar 2025
Amount
Cutting in earth work and disposal of excavated earth upto a lead of 20 metres Chiselling / Wedging out of rock where blasting is prohibited :- soft rock complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge. Chiselling work = 70% , Jumper Work = 30 %
Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/hard rock , where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting , planking, timbering and dewatering where ever required. Stacking usable and unusable material /soil seperataly and after laying, jointing and testing of pipes (for pipes only), returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per direction of the Engineer-in-charge.
Providing and laying cement concrete 1:4:8 (1 cement:4sand:8 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts and to the enitre satisfaction of Engineer-in- charge.
Providing and laying cement concrete 1:2:4(1cement:2sand:4graded crushed stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced work in:- Foundation and plinth complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge.
Providing and laying cement concrete 1:2:4(1cement:2sand:4graded crushed stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced work in:- Columns piillar post. etc complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge.
Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give a fair finish including centring,shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtr. and removal of the same for insitu -reinforced concrete and plain concrete work in : Columns piillar post. etc complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge.
Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete including the cost of binding wire in complete with in all respect and including all leads and lifts and entire satisfaction of engineer in charge.
Steel work welded in built up sections, trusses and framed work, i/c cutting, hoisting, fixing in position and applying a priming coat of red lead paint. I) In beams, joists, channels, angles,tees, flats with connectin plates of angle cleets as in main and cross beams, hip and jack rafters, purlins connected to common rafters & the like. including all leads and lifts as per direction and to the entire satisfaction of Engineer in charge
Providing, laying,jointing and testing of HDPE pipes in trenches to required grades as per IS:4984-1985 latest with up to date amendments of following OD pipes, material grade and class of pipes. The jointing of pipes should be done by way of butt fusion welding as per relevant IS code and specifications including all fittings and accessories e.g. coupling, tee, bends, reducers, screwed adopters, flanged tail pieces etc. complete in all respect.
110 mm dia PE-80 PN 4.00
Chitar Singh (BID ID -500804)
Shivashish (BID ID -500821)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Form6.pdf
Tender Documents • 0.68 MB
Form8.pdf
Tender Documents • 1.38 MB
BOQ_148623.xls
BOQ • 0.34 MB
Termsandconditions.pdf
Tender Documents • 0.28 MB
Download all tender documents and submit your bid