| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.3 L+₹38,280.54 (4.29%)Rejected-Finance GRAM AND POST MUSEPUR JANPAD AZAMGARH UTTAR PRADESH | AZAMGARH | AZAMGARH | UTTAR PRADESH | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.8 L+₹1.9 L (21.2%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
4 Feb 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECTIVE ENGINEER IRRIGATION DEPARTMENT IN UP
EXECTIVE ENGINEER SHARSA SAHAYAK KHAND-32 AZAMGARH (UP)
Construction of VRB
2023_UPIDC_769522_5
05/EE/2022-23/125
Open Tender
Civil Works
Item Rate
180 days
AZAMGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹1.3 L
Yes
24 Mar 2023
27 Jan 2023
4 Feb 2023
27 Jan 2023
4 Feb 2023
27 Jan 2023
Amount
Earth work in excavation in foundation including digging and reflling the trench with its proper disposal with in 30 meter lead & lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-charge as per drawing and I.D specification.
E/W for temporary bund making and removing in all type soil including all lead and lift and labour and T&P at U/S & D/S of V.R.B
Plain Cement Concrete in 1:3:6 in foundation with coarse sand having F.M. not less than 2.5, Crushed stone aggregate of nominal size 20 mm to 40 mm mechanically mixed, placed in foundation and properly compacted including cost of all materials labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D specification.
First class brick work in 1:4 cement and coarse sand mortar up to 3M lift and 60M lead of materials with including all cost of materials, scafolding, labour and T&P etc.
Cement Pointing (Struck deep) 1:2 Cement and coarse sand mortar on brick masonry including all cost of materials, scafolding, labour and T&P etc.
Laying Reinforcement Cement Concrete (1 : 1.5 : 3) with coarse sand and crushed aggregate with mechanically mixed with properly compacted by vibrator including all cost of materials, labour and T&P etc and excluding cost of steel as directed by Engineer-in-Charge.
Laying C.C. (1 : 1.5 : 3) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.
Laying C.C. (1 : 2 : 4) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.
Centering & Shuttering for R.C.C. work - For Bridge Slabs upto 3M span including all cost of materials , fixing , removing , lobour and T&P etc.
Shuttering for C.C. blocks and concrete including all cost of materials , labour and T&P etc.
Providing and fixing of Joint Filler Board with cost of all materials, labour and T&P etc.
Providing and fixing of Spout Drainage Pipe including all cost of materials, labour and T&P etc.
Fixing of stone Wheel Guard (0.200 x 0.200 x 0.750m ) , with earth cutting and earth filling, including all materials , Labour and T&P etc.
Brick on edge Soling over ramp including all cost of materials, labour and T&P etc
100 mm dia boring with lowering casing and extraction of pipe after completion of work
Dewatering of foundation with 5 HP Diesel Pumping set
S/F Sign board during construction of work including all cost of materials,labour T&P
E/W in making Ramp including all cost of materials, labour and T&P etc
E/W in making Canal Diversion for V.R.B construction including all lead, lift, proper disposal and back filling labour and T&P etc
E/W in making Road Diversion for V.R.B construction including all lead lift proper disposal and labour and T&P etc
Dismantling of Brick Work with lime/cement mortar and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Dismantling of Reinforced Cement Concrete work and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Providing (TMT-500D),Laying , cutting , bending and binding with binding wire excluding shuttering and centering, but including all materials, labour and T&P etc.
Finishing of wall with two coat water proofing cement paints of approved make such as super snowcem, Durrocem, Robiacem, Guttucem, supreme quality of required shade on uncoated wall surface after throughly brushing the surface to remove all dirt and remain of loose powdered materials including curing and cost of all materials.
M/s Uday Construction
Surendra Maurya
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .