| 1 | L1₹7.0 CrAccepted-AOC AWAS VIKAS COLONY MELAGHAT ROAD KHATIMA UDHAM SINGH NAGAR | ₹7.0 Cr | L1 | Accepted-AOC aoc |
| 2 | L2₹7.1 Cr+₹1.6 L (0.22%)Rejected-Finance SITARGANJ UDHAM SINGH NAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | ₹7.1 Cr+₹1.6 L (0.22%) | L2 | Rejected-Finance rejected being to be 2nd lowest |
| 3 | Rejected-Technical N A | NA | NA | 121004 | - | - | Rejected-Technical techanically not qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical techanically not qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical techanically not qualified |
| Sl No | Description | Qty | Unit | M/s Suresh Kumar Jain L2 | NANDANI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 1,696.8 | Cum | 220 ₹3,73,296 | 210 ₹3,56,328 Lowest |
| 2.00 | Cartage of material by mannual labour inculding loading ,unloading & stacking up to 2km | 186.76 | Cum | 208 ₹38,846.08 | 200 ₹37,352 Lowest |
| 3.00 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles | 2,231.88 | mtr | 2,597 ₹57,96,192.36 | 2,590 ₹57,80,569.2 Lowest |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,032.98 | Cum | 166 ₹1,71,474.68 | 160 ₹1,65,276.8 Lowest |
| 5.00 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 1,949.68 | Sqm. | 28 ₹54,591.04 | 25 ₹48,742 Lowest |
| 6.00 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | 2,641.93 | Sqm | 262 ₹6,92,185.66 | 260 ₹6,86,901.8 Lowest |
| 7.00 | Supplying and filling in plinth with gola sand under floors, including watering, ramming, consolidating and dressing complete. | 55.8 | Cum | 1,799 ₹1,00,384.2 | 1,790 ₹99,882 Lowest |
| 8.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete for all lift. | 967.08 | Cum | 593 ₹5,73,478.44 | 590 ₹5,70,577.2 Lowest |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 4.5 | Cum | 6,676 ₹30,042 | 6,670 ₹30,015 Lowest |
| 10.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 162.76 | Cum | 5,772 ₹9,39,450.72 | 5,770 ₹9,39,125.2 Lowest |
Tender Value
₹7.1 Cr
EMD Value
₹14.1 L
Closing Date
14 Feb 2026, 5:00 pmClosed
GENERAL MANAGER CONSTRUCTION WING UKPJN HALDWANI
OFFICE OF THE GENERAL MANAGER (KUMAUN), CONSTRUCTION WING, UTTARAKHAND PEYJAL NIGAM, E-32 JUDGE FARM, HALDWANI, DISTRICT-NAINITAL 263139.
CONSTRUCTION OF SECOND PHASE TYPE II RESIDENTIAL BUILDING AT CENTRAL JAIL/SAMPURNANAND SHIVIR, SITARGANJ DISTRICT-UDHAM SINGH
2026_MDPEY_91226_1
162/NIVIDA UDHAM SINGH NAGAR/21 DATED 21/01/2026
Open Tender
Civil Works
Item Rate
540 days
Sitarganj Distt USN
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹11,800
PM CONSTRUCTION UNIT UKPJN UDHAM SINGH NAGAR
₹14.1 L
GENERAL MANAGER CONSTRUCTION WING UKPJN HALDWANI
4 Jul 2026
22 Jan 2026
19 Feb 2026
22 Jan 2026
14 Feb 2026
1 Feb 2026
27 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 1,696.8 | Cum | 220.59 | ₹3,74,297.11 |
| 2 | Cartage of material by mannual labour inculding loading ,unloading & stacking up to 2km | 186.76 | Cum | 208.32 | ₹38,905.84 |
| 3 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles | 2,231.88 | mtr | 2,597.97 | ₹57,98,357.28 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,032.98 | Cum | 166.1 | ₹1,71,577.98 |
| 5 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 1,949.68 | Sqm. | 28.94 | ₹56,423.74 |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | 2,641.93 | Sqm | 262.75 | ₹6,94,167.11 |
| 7 | Supplying and filling in plinth with gola sand under floors, including watering, ramming, consolidating and dressing complete. | 55.8 | Cum | 1,799.79 | ₹1,00,428.28 |
| 8 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete for all lift. | 967.08 | Cum | 593.64 | ₹5,74,097.37 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 4.5 | Cum | 6,676.69 | ₹30,045.11 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 162.76 | Cum | 5,772.88 | ₹9,39,593.95 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
Tewnderdocuemtns.pdf
Tender Documents • 5.63 MB
BOQ_108046.xls
BOQ • 0.46 MB
Drwqanings.pdf
Other Document • 1.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .