Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.4 LRejected-AOC | ₹8.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JOTHISH V R L2 | AHAMMED KABEER L1 |
|---|---|---|---|---|---|
| 1.00APPENDIX-A | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.92 | cum | 500 ₹460 | 2,104.7 ₹1,936.32 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 3 | each | 500 ₹1,500 | 373.19 ₹1,119.57 |
| 1.00 | 15.57:Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge | 6.51 | sqm | 50 ₹325.50 | 57.65 ₹375.30 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 19.8 | sqm | 50 ₹990 | 74.97 ₹1,484.41 |
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 4 | each | 200 ₹800 | 146.55 ₹586.20 |
| 1.01 | 14.85:Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge. | 5 | sqm | 1,500 ₹7,500 | 217.76 ₹1,088.80 |
| 1.01 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 14.91 | sqm | 100 ₹1,491 | 572.89 ₹8,541.79 |
| 1.01 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | 64.62 | sqm | 100 ₹6,462 | 349.43 ₹22,580.17 |
| 1.01 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 145.51 | sqm | 5 ₹727.56 | 20.23 ₹2,943.71 |
Tender Value
₹8.5 L
EMD Value
₹21,181
Closing Date
10 Nov 2025, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Building sub division, Palakkad
GENERAL-Renovation works to CBCID OFfice,Palakkad- Renovation works-General Civil Work
2025_PWD_811093_2
PWD/BLDG/TR/14254/2025_5_1_1/1
Open Tender
Civil Works - Buildings
120 days
Palakkad
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,870
Yes
₹21,181
Yes
6 Feb 2026
31 Oct 2025
13 Nov 2025
31 Oct 2025
10 Nov 2025
31 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370310.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1370310.xls
BOQ • 0.33 MB
Sbdcbcid.pdf
Tender Documents • 1.63 MB
nitcbcidoffice.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid