Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -0.50% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹750.66 (0.50%)Admitted-Finance | +0.00% | ₹1.5 L+₹750.66 (0.50%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹765.67 (0.51%)Admitted-Finance | +0.01% | ₹1.5 L+₹765.67 (0.51%) | L3 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
20 Aug 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
PLEASE REFER NIT
2026_RDPR_319880_97
e-NIT No. 39 REW Rajouri of 2026 Dated 10-08-2026
Open Tender
Civil Works
Percentage
90 days
RAJOURI
PLEASE REFER BOQ
2 documents required · 2 mandatory
₹500
Yes
Rural Development and Panchayati Raj
₹3,000
Yes
22 Sept 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed | 10.88 | CUm | 612 | ₹6,658.56 |
| 2 | Providing and laying in position cement concrete of M5 grade including curing but excluding the cost of centring and shuttering. All work upto plinth level | 2.04 | CUm | 4,826.5 | ₹9,846.06 |
| 3 | Providing and laying in position cement concrete of M10 grade with 30% Boulders including curing but excluding the cost of centring and shuttering. | 6.97 | CUm | 5,733.6 | ₹39,963.19 |
| 4 | Providing and Laying RCC in M20 Grade including curing but excluding the cost of centring and shuttering. | 3.36 | CUm | 9,395 | ₹31,567.2 |
| 5 | Steel Reinforcement for RCC Work | 3.36 | QTL | 12,320 | ₹41,395.2 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work | 32 | SQM | 286.35 | ₹9,163.2 |
| 7 | Carriage of Sand /Aggragates by 35 km By MT | 16.59 | CUm | 575 | ₹9,539.25 |
| 8 | Add Cost Of Sign Board | 1 | nos | 2,000 | ₹2,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_1063524.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .