Loading…
Loading…
Tender Value
₹97.1 L
EMD Value
₹97,120
Closing Date
20 May 2026, 4:00 pmClosed
Superintending Engineer, Transmission Circle GETCO Jambuva
Bi-Annual Rate Contract for 66KV Undergound Cable Fault Finding and Attending Work under Jambuva Circle
299432
JTC/ 26 -27 / n- 01
Open
Electrical
Works
Vadodara
15 documents required · 15 mandatory
₹5,900
Gujarat Energy Transmission Corporation Limited
₹97,120
29 Apr 2026
29 Apr 2026
29 Apr 2026
20 May 2026
29 Apr 2026
Name of work : Bi-Annual Rate Contract for 66KV Undergound Cable Fault
Finding and Attending Work under Jambuva Circle
TECHNICAL SPECIFICATION
( TO BE SUBMITTED ONLINE through N-Code
Web site - https://tender.nprocure.com )
TENDER NOTICE No –JTC/ 26-27 / n-01
Superintending Engineer, Transmission Circle GETCO Jambuva ( Address of the office - Gujarat Energy
Transmission Corporation Limited, Circle Office, 220kv Jambuva sub-station compound, N.H. No-8, PO:- Jambuva,
Tal & Dist: Vadodara.-390 014 ) invites “On line Tenders” (e-tendering) for the purchase/ works of following items.
Tender Papers & Specifications may be down loaded from Web site https://tender.nprocure.com (For view, down
load and on line submission) and GUVNL/GETCO web site www.guvnl.com (For View & download only).
All tender documents, scanned copies of original documents (Notarized / self-attested copies of original – as
specified in tender document) along with scan copy of transaction slip of payment made through RTGS/NEFT for
Tender Fee & EMD shall be unloaded through on line only ( which is mandatory) on (n) procure portal. Bidders shall
compulsorily pay tender fee and EMD through RTGS/NEFT only. No any physical documents, Demand Draft /
Banker’s cheque or Pay order for tender fee and EMD to be submitted by bidders.
All the bidders, in respect of tender item must have vendor registration with the GETCO or their any subsidiary
company viz. prior to the date of opening of technical bid of the tender, otherwise their bids will not be considered
eligible for technical scrutiny and their technical bids will not be opened
Sr. Description
1 Tender No.: JTC/ 26 -27 / n-
2 Purchase/Work of Bi-Annual Rate Contract for 66KV Undergound
Cable Fault Finding and Attending Work under
3 Tender Fee (non-refundable) Rs. 5900.00 (Rs. 5000.00 + GST applicable
4 Estimated cost inclusive of GST in Rs. Lacs Rs.
5 Earnest Money Deposit amount in Rs. Rs.
6 On line (E-tendering) tender/ offer submission last 20.05.2026
date up to 16.00 hours only (This is mandatory)
7 Date of opening online technical bid at 16:10 Hours. 20.05.2026
8 Tentative Date of on – line opening of Price bid, (if Shall be intimated separately.
possible), at 11.00 Hours
9 Prices Firm/Percentage basis
10 Validity of offer 180 days
11 Time limit 24 months
12 Appropriate / Registration Class Only GETCO registered contractor
1. All tender documents, scanned copies of original (Notarized / self-attested copies of original – as specified in tender
document) documents along with scan copy of transaction slip of payment made through RTGS/NEFT for Tender
Fee & EMD shall be uploaded through on line only (which is mandatory) on (n) procure Portal. Any physical
documents , Demand Draft / Banker’s cheque or Pay order for tender fee and EMD are not accepted
2. Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on or before due date and
time of submission of tender .Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will
not be accepted and no any further communication in the matter will be entertained.
3. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in scheduled time.
4. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain legible (readable)
and should not be password protected.
5. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on bidder’s letterhead), Tender
acceptance letter (on bidder’s letterhead), price bid, tender documents specified in the tender must be submitted
through online on n-procure portal (mandatory) (All the documents to be duly self attested by the bidder). For any
differences or wrong entry bidder shall be sole responsible for that documents.
6. Tender will be evaluated on the basis of Data / Details / Documents submitted by the bidders though online offer only.
7. The bidders are required to upload complete technical bid duly filled, sealed & signed by bidder ( all the appendices
(annexure)/forms etc). This is intended for transparency and speedy evaluation of the bids. Instead of simply
confirming/attached in bid/refer physical offer, the bidder shall fill in the particulars against appropriate place in respect
of each line appearing in Technical bid (In the absence of required details in uploaded tender documents, technical
bid , the purchaser has every right to evaluate the bids accordingly and bidder cannot raise any objection against any
point during evaluation).
8. In case of short submission of documents with bid and / or clarification if any required from the bidder,the
required details / documents may be asked from the bidder in physical form.
9. Payment of Tender Fee and Earnest Money Deposit (EMD ) :
1) The EMD and Tender fee plus GST as applicable shall be paid through RTGS/NEFT only.Bidder shall have
to upload scan copy of payment made (transaction slip of payment made) with the Tender documents online
on n-procure portal.
2) Bidder has to provide following detail on the same date when payment of tender fee and EMD is
made at below mentioned e-mail ids :
Sr. No. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
8 GST Registration No.
3) GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of Account GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
12. Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will not be accepted.
Also,Tender fee and EMD received after due date and time as specified in the tender will not be
accepted/opened irrespective of delay due to any reasons and the Corporation shall not assume any
responsibility for late receipt of the same.
13. Tender without EMD and tender fee plus GST as applicable shall be rejected.
14. Bidders are requested to remain in touch with the n-procure portal for any amendment/corrigendum or
extension of due date etc.
15. The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason thereof.
Any technical questions, information and clarification that may be required pertaining to this enquiry should
be referred to: The Superintending Engineer (TR), Gujarat Energy Transmission Corporation Limited, Circle
office Jambuva.
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
C.O., GETCO, Jambuva
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe” website
In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if training
required for participating in online tender, they can contact the following office: (n) Procure Cell, (n)
code solutions-A division of GNFC Ltd., 403, GNFC Infotower, S.G. Road, Bodakdev Ahmedabad –380054
079-26857321 / 40007533, Email: [email protected]
TENDER No: JTC/ 26-27 / n-01
“Name of Work : Bi-Annual Rate Contract for 66KV Undergound Cable Fault Finding and Attending
Work under Jambuva Circle
Sr. No. Document Code Part Page No.
1. Tender Notice - I
2 Technical Bid I
3 Integrity Pact I
4 Instructions to Tenderers ITB I
5 Qualification Requirement
6 General Conditions of Contract GCC I
7 Erection Conditions of Contract ECC I
8 Special Conditions of Contract with SCC I
Declaration Form
9 Technical Specifications TSP II A
10 Technical Data sheets TDS II B
11 Various Annexures
(A) INSTRUCTIONS TO THE BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Baroda hereinafter called ‘GETCO’/ ‘OWNER’ intends
to receive bids Bi-Annual Rate Contract for 66KV Undergound Cable Fault Finding and Attending
Work under Jambuva Circle as detailed in the accompanying specifications in accordance with Terms
and Conditions herein. The bids shall be prepared and furnished as per these Instructions.
2.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/liable for these
costs irrespective of the course and conclusion of this Bidding.
3.0 BID DOCUMENTS
Details of Documents
The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
4.0 Knowing the Bid Documents
4.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein, which
may in any manner, affect the scope & content of work and the costs thereof. Submission of a Bid not
substantially responsive to the Bid Document in all respects and/or failure to furnish all information required
by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
5.0 Clarifications on Bid Documents
5.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications or is in
doubt as to the true meaning of any part, he shall make a request, in writing not later than the date of pre
Bid discussion, to the owner in triplicate. The owner will issue explanations, interpretations and clarifications
as deemed fit in writing as a response to this request. On receipt of such interpretations/clarifications, the
Bidder may submit his Bid within the date and time stipulated in the Bid invitation, All such explanations,
interpretations and clarifications from the Owner shall be deemed as part of Bid Documents and shall
invariably accompany the Bidder’s proposal.
5.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his
representative(s) will not in any way be binding on the Owner.
6.0 Amendment of bidding document:
6.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at his own
initiative or in response to a clarification requested by the intending Bidder, modify the Bidding Document
with amendment(s).
6.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have received the
Bidding Document at the address contained in the letter of request for issue of Bidding document from the
Bidders. Owner will bear no responsibility or liability arising out of non-receipt of the same in time or
6.3 In order to afford prospective bidders reasonable time in which to take the amendment into account in
preparing their bids, the Owner may, at his discretion, extend the deadline for the submission of bids.
6.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration by
the Bidders while they submit their bids and shall invariably enclose such documents as a part of the bid.
7.0 PREPARATION OF BIDS
7.1 Language of Bid:
The Bid prepared by the Bidder and all correspondence and documents relating to the Bid, exchanged by
the Bidder and the Owner, shall be written in the English language, provided that any printed literature
furnished by the Bidder may be written in another language so long as accompanied by an English
translation of its pertinent passages. Failure to comply with this may disqualify a bid. For purposes of
interpretation of the bid, the English translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding any
printed/typewritten text of their own.
8.0 Local Conditions:
8.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which may
have any effect on the execution of the Contract covered under these documents and specifications. The
Owner shall not entertain any request for clarifications from the bidders, regarding such local conditions.
8.2 It must be understood and agreed that such factors have properly been investigated and considered while
submitting the proposals. No claim for financial adjustment to the Contract awarded under these
specifications and documents will be entertained by the owner. Neither any change in the time schedule of
the Contract nor any financial adjustments arising thereof shall be permitted by the Owner, which are based
on the lack of such clear information or its effect on the cost of the works to the Bidder.
9.0 Documents comprising the Bid:
furnished in the Bidding Documents, indicating, for the services to be rendered, a brief description of
services, quantity and price.
9.2 All tender documents, scanned copies of original (Notarized / self-attested copies of original – as specified
in tender document) documents along with scanned copy of original document for Tender Fee & EMD shall
be uploaded through on line only (which is mandatory) on (n) procure Portal to establish that the Bidder
meets the Qualification Requirements as detailed in ANNEXURE -I. No physical documents to be
submitted by the bidder.
9.3 Complete technical bid / Tender Documents / formats are to be filled in all respects. Same shall be sealed
and signed by the Company Authorized Signatory wherever specified and scanned copies of original
(Notarized / self-attested copies of original – as specified in tender document) documents along with
scanned copy of original document shall be uploaded through on line only (which is mandatory) on (n)
procure Portal.
9.4 Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on before due
date and time of submission of tender. Tender fee and EMD paid though Demand Draft / Banker’s
cheque or Pay order will not be accepted and no any further communication in the matter will be
9.5 In case of short submission of documents with bid & / or clarification if any required from the bidder, the
required details/ documents may be asked from bidder in physical form.
9.6 It shall be sole responsibility of the bidder that the uploaded scanned documents ( in PDF form) remain
legible & should not be password protected.
9.7 Bidder shall have to upload scanned copies of complete technical bid filled in all respect and sealed and
signed by Company Authorized Signatory through on line only (which is mandatory) on (n) procure Portal
10.0 Bid Price:
10.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate price
Schedules, enclosed in bid proposal sheets for erection, testing and commissioning, and other services it
proposes to furnish under the contract. The % age above/below indicated shall be inclusive of all taxes
and duties applicable inclusive of GST applicable on required inputs and services.
10.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease based
11.0 Price Basis:
11.1 The Price shall be quoted on firm basis.
11.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract and shall
not be subject to variation on any account save for change in quantity. A bid submitted with an adjustable
price quotation shall be treated as non-responsive and rejected.
12.0 Taxes and Duties:
12.1 Goods and Service Tax (GST):
12.1.1 The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on a
given taxable goods and/or services within the original contractual delivery period. The amount and% of
GST and Cess as applicable should clearly be indicated separately. (GST/Cess means all applicable
Tax/Cess under GST Laws. GST Laws means IGST Act, GST(Compensation to the State for Loss of
Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017and all related ancillary legislations).
12.1.2 You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder, certifying that
you have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not claim
any such Refund, on a future date, from the concerned Authorities and if, any Refund, in respect of such
GST and Cess, is claimed by you, it will be immediately passed on to the COMPANY, without COMPANY
making any specific Claim, for the same, either from the Department or from you.
12.1.3 The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess
is not mentioned clearly unless the bidder has opted for Compostion Scheme under GST Act, which should
be clearly indicated in the price bid. COMPANY may at its discretion consider such offer with presumption
of highest applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
12.1.4 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of the
Supplier from Composition scheme during the tenure of the contract, the rate mentioned in the price bid
shall be final and any additional GST will have to be borne by the tenderer. In no case additional amount
towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause
will not be applicable in case of Supplier / Contractor has opted for Composition Scheme under GST.
12.1.5 Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of GST
(later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above
as charged in the invoice shall be borne by the Supplier/Contractor. However, any refund received by the
supplier / contractor on account of GST charged from the company; such refund shall have to be passed
on to the company, along with interest if any. Such refund along with interest needs to be passed on suo-
moto by the supplier / contractor.
12.1.6 Further, the Company has a right to recover the amount of GST along with penal interest at the rate of 15%
per annum if GST charged is not paid / short paid to the government or fail to upload the details or uploads
inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated time limit.
12.1.7 In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
12.1.8 INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Creditand / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under the
GST Act, subsequent to the date of submission of the offer, the same should be passed on to COMPANY
and you should inform such changes to COMPANY from time to time.
12.1.9 GST, other taxes and other levies and duties including custom duty solely in respect of the transaction
between the owner and the contractor under this contract, if any, shall be included in the bid price. These
shall also be indicated separately wherever applicable as mentioned in the Tender.
12.2 As regards the income Tax, surcharge on income tax and any other corporate tax, including GST if any
,the owner shall not bear any tax liability whatsoever. The bidder shall be liable and responsible for payment
of such taxes as attracted under the provisions of the law.
12.3 Notwithstanding the tax liabilities as per the sub-clause 12.1 above the owner shall have the right to make
deduction at source from the amounts payable to the contractor in respect of Income Tax (on the cost of
items of supply included in the works contract) as may be mandatory in terms of the law. The owner shall
not bear any liability in this regard but shall issue necessary certificate in respect of such deduction made.
12.4 In case any tax or duty is newly introduced by the Government applicable for this contract with effect from
the next day of the date submission of the bid and if the contractor is required to pay additional tax or duty,
then the owner shall reimburse the contractor the additional tax or duty so paid by the contractor against
submission by the contractor of documentary evidence to the satisfaction of the owner. This provision will
not be applicable to transaction between the contractor and his sub-contractors and will be applicable only
to the direct transaction between the contractors and owner. Besides the said statutory variation, no other
statutory variation shall be payable by the owner.
12.5 The owner’s liability for all taxes and duties including GST under the contract shall be limited to those
indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as per
Clause No. 12.10 para.
12.6 If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced by
reasons of the making, passing or promulgation of any law after the date of submission of bid or by any
order, regulation or bye-law having the force of law the amount of such increase or reduction shall be added
to or deducted from the “Contract Price” as the case may be for direct transactions between contactor &
owner, and not for bought out items. It is the Bidders responsibility to furnish details of taxes, duties, levies
etc. applicable as on the date of submission of the bid.
12.7 No claim for any increase towards the statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty applicable shall be entertained by the Owner during the extended period
of contract, if any, provided the extension of the contract is required by causes attributable to the contractor.
12.8 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of a new
tax or duty will be applicable only to the direct transaction between the contractor and the owner.
12.9 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat the
applicability of Entry Tax, GST in respect of this work and include the same in the quoted price. The Owner
in this regard will entertain no separate claim, as it is the responsibility of the Bidder to pay all these taxes.
12.10 In addition, the conditions detailed under Special Conditions of Contract shall apply.
13.0 Time Schedule:
13.1 The basic consideration and the essence of the contract shall be strict adherence to the time schedule for
performing the specified works.
13.2 The Owner’s requirements of completion schedule for the Works are mentioned in the accompanying
Special Conditions of Contract.
13.3 The completion schedule as stated in the special conditions of contract shall be one of the major factors in
consideration of the bids.
13.4 The owner reserves the right to request for a change in the work schedule during pre- award discussions
with successful bidder.
13.5 The successful bidder will be required to prepare detailed Bar chart and finalize the same with the owner
as per the requirement of Clause no 27.0 of GCC
14.0 Contract Quality assurance:
14.1 The Bidder shall include in his proposal the Quality Assurance Program containing the overall quality
management and procedures which he proposes to follow in the performance of the Works during various
phases as detailed in relevant clause of the General Technical Conditions.
14.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed for the execution
of the Contract will be mutually discussed and agreed and such agreed Program shall form a part of the
14.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being supplied
wherever specifically indicated in the tender document shall supply only from those vendors. Such details
shall be accompanied by their list of previous supplies made performance reports etc. However, in case of
orders are placed, specific approval shall be obtained from the owner for the vendor-supplied materials.
The quality assurance program shall be furnished for each material separately for approval.
15.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled
Insurance, in General Terms and Conditions of Contract and in Erection Conditions of this Part-I. Bidder’s
attention is specifically invited to these clauses. Bid price shall include all the costs in fulfilling all the
insurance liabilities under the Contract.
16.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment tools &
tackles etc. which he proposes to bring to site for the purpose of erection, handling, testing and
commissioning including performance and guarantee tests of the equipment. If any such equipment is listed
anywhere else in the proposal and not specially mentioned in the above schedule, it shall be deemed to
have been included in the Bidder’s proposed scope of supply.
17.0 Brand Names:
17.1 The specific reference in these specifications and documents to any material/equipment by brand name
makes or catalogue number shall be construed as establishing standards of quality and performance and
not as limiting competition. However, Bidders may offer other similar material/equipment provided they
meet the specified standard, design and performance requirements. The Bidder shall furnish adequate
technical information about such alternative material equipment to enable the Owner to determine its
acceptability. The Owner shall be the sole judge on the acceptability or otherwise of such alternatively
material/equipment.
17.2 The bidder shall note that standards for workmanship material and equipment, and reference to brand
name of catalogue numbers designed by the Owner in its Technical Specifications are intended to be
descriptive only and not restrictive. The Bidder may substitute alternative standards, brand name and/or
catalogue numbers in its bid, provided that it demonstrates to the Owner’s satisfaction that the substitutions
are substantially equivalent or superior to those designed in the Technical Specification.
18.0 Bid Security/EMD:
The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of estimated
cost to be paid as under:
a) Payment of Earnest Money Deposit ( EMD ) can be accepted by RTGS/ NEFT only.
1. In case of payment through RTGS/NEFT the scan copy of payment made (transaction slip
of payment made) shall be uploaded online with the Tender documents on n-procure portal.
2. Bidder has to provide following detail on the same date of payment made so that receipt can
be generated at below mentioned e-mail ids:
Sr. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3. GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
18.1 The offer should be valid for a minimum period of 180 days from the date of opening of technical bid.
18.3 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would warrant
the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be made payable
to the Owner without any condition whatsoever.
18.4 The Owner as non-responsive will reject any bid not secured in accordance with Para 18.1 above. No
exemptions are made in the furnishing of the security.
18.5 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three months
from the date of submission of tender whichever is later.
18.6 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
18.7 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid Form:
b) If a bidder refuses to accept the contract or fails to commence the works including supplies within thirty
days of letter of award of contract)
19.0 Format of Bid:
19.1 The original and all copies of the bid shall be typed or written in indelible ink and shall be signed by the
Bidder or a person or persons duly authorized by the Bidder to sign the Contract. The letter of
authorization shall be indicated by written power-of-attorney accompanying the bid. All pages of the
bid, except for un-amended printed literature, shall be initiated by the person or persons signing the
19.2 Complete technical bid / all Tender Documents / formats are to be filled in all respects. Same shall be sealed
and signed by the Company Authorized Signatory wherever specified and scanned copies of original
(Notarized / self-attested copies of original – as specified in tender document) documents along with scanned
copy of original document shall be uploaded through on line only (which is mandatory) on (n) procure Portal.
No physical documents to be submitted by the bidder
19.3 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors made by
the Bidder, in which case such corrections shall be initiated by the person or persons signing the bid.
19.4 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initiated by the person or persons signing the
19.5 Bids shall be submitted as under:
Complete Technical Bid, Tender documents as per QR , Price Bid and transcation slip for payment
made for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only.
20.0 Signature of Bids:
20.1 The bid must contain the name, residence and place of business of the person or persons making the bid
and must be signed and sealed by the Bidder with his usual signature. The names of all persons signing
should also be typed or printed below the signature.
20.2 Bid by a partnership must be furnished with full names of all partners and be signed with the partnership
name, followed by the signature(s) and designation(s) or the authorized partner(s) or other authorized
representative(s).
20.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by the
President/Managing Director or by the Secretary or other person or persons authorized to bid on behalf of
such Corporation/Company in the matter.
20.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’, ‘Agent’
or other designation without disclosing his Principal will be rejected.
20.5 If it is found that two or more persons who are connected with one another either financially or as a principal
and agent have bid under different names without disclosing their connection then such bids will be liable
for rejection. Satisfactory evidence of authority of the person signing on behalf of the Bidder shall be
furnished with the bid.
20.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
20.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
21.0 Submission of bids:
21.1 Complete Technical Bid, Tender documents as per QR , Price Bid and transcation slip for payment
made for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only.
Price Bid : Technical & Price bid shall be submitted ‘online’ only through n-code.
21.2 The Technical Bid and accompanying documents, RTGS/ NEFT transaction slip for payment made for
tender fee and EMD shall be uploaded ( scanned copies of original document ) through on line only (which
is mandatory) on (n) procure Portal by the bidder.
21.3 Address of the Owner is as under:
The Superintending Engineer
GETCO, Circle Office,
220kv Jambuva sub-station compound.
NH -8, Jambuva PIN CODE-
22.0 Deadline for submission of bids:
22.1 Bids submitted by telex/telegram/physical will not be accepted. No request from any Bidder to the Owner
to collect the proposals from airlines, cargo agent etc. shall be entertained by the Owner.
22.2 Bids must be submitted not later than the time & date mentioned in the tender.
22.3 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the Bidding
Document in which case all rights and obligations on the Owner and Bidders previously subject to the
deadline will thereafter be subject to the deadline as extended.
23.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids prescribed
by the Owner, will be rejected and not considered for evaluation.
24.0 Modification and withdrawal of bids:
24.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of the
modification or withdrawal is received by the Owner prior to the deadline prescribed for submission of bids.
24.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of clause 23.0. The envelope should clearly indicate whether the
modification is for the Technical bid or the Price bid. No bid modifications notice by Telex/Grams/Fax shall
be entertained by the Owner.
24.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of bids.
24.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the expiration of
the period of bid validity specified by the Bidder on the Bid Form. Withdrawal/modification of a bid during
this interval may result in the Bidder’s forfeiture of its bid security.
25.0 Information required with the proposal:
25.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of each principal item
of equipment proposed to be furnished and erected. The bid should also contain drawings and descriptive
materials indicating general dimensions, materials from which the parts are manufactured, principles of
operation, the extent of pre-assembly involved, major construction equipment proposed to be deployed,
method of erection and the proposed erection organizational structure.
25.2 The above information shall be provided by the Bidder in the form of separate sheets, drawings, catalogues,
etc. in five copies.
25.3 Any bid not containing sufficient descriptive material to describe accurately the equipment proposed may
be treated as incomplete and hence rejected. Such descriptive materials and drawings submitted by the
Bidder will be retained by the Owner. Any major departure from these drawings and descriptive material
submitted will not be permitted during the execution of the Contract without specific written permission of
25.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement of the equipment
or any other matter will not be considered.
25.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to provide additional
information and data as deemed necessary by the Bidder.
25.6 The Bidder, along with his Proposal, shall submit a list of recommended erection equipment and materials
which will be required for the purpose of erection of equipment and materials supplied under the Contract.
25.7 In case the ‘Proposal’ information contradicts specification requirements, the specification requirements will
govern, unless otherwise brought out clearly in the technical commercial deviation schedule.
26.0 BID OPENING AND EVALUATION
Opening of bids by owner:
26.1 The Owner will open the technical bids in the presence of Bidder’s representatives who choose to attend
on the date and time mentioned for opening of bids in the Invitation to Bid or in case any extension has
been given thereto, on the extended bid opening date and time notified to all the Bidders who have
purchased the bidding document. The Bidder’s representatives who are present shall sign a register
evidencing their attendance.
26.2 The Bidder’s names, Technical modifications, bid withdrawal and such other details as the Owner, at his
discretion may consider appropriate, will be announced in the Technical Bid Opening.
26.3 Price bid will be open ‘online’ only through n-code after technical scrutiny of tender.
Technical bid and Price bid will be open ‘online’ only through n-code.
27.0 Purpose of evaluation of bids:
27.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these specifications
and documents. All technically responsive bids shall then be examined to determine the LOWEST
EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
27 ( A) Policy for bids under consideration:
27.A.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until such
time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids are under
consideration, Bidders and/or their representatives and other interested parties are advised to refrain from
contacting by any means, the owner and/or his employee’s representatives on the matters related to Bids
under consideration.
27.A.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the Bidder
for a clarification of its bid. The request for clarification and the response shall be in writing and no change
in the price or substance of the bid shall be sought, offered or permitted.
28.0 Preliminary Examination:
28.1 The Owner will examine the bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have been
properly signed, and whether the bids are generally in order.
28.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit
price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a discrepancy
between the total bid amount and the sum of total costs, the latter shall prevail and the total bid amount will
be corrected accordingly. If there is a discrepancy between words and figures, the amount advantageous
to the Owner will prevail. If the Bidder does not accept the correction of the errors as above, his Bid will be
rejected and the amount of Bid Security will be forfeited. The Bidder should ensure that the prices furnished
furnished in the specified prices schedules to be identified in Bid Form for this purpose, the Owner shall be
entitled to consider the highest price for the purpose of evaluation and for the purpose of award of Contract
use the lowest of the prices in these schedules.
28.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid to the
Bidding Document. For purpose of these Clauses, a substantially responsive bid is one which conforms to
all the terms and conditions of the Bidding Document without material deviations. A material deviation is
one which affects in any way the prices, quality, quantity or delivery period of the equipment, completion of
works or which limits in any way the responsibilities or liabilities of the Bidder of any right of the Owner as
required in these specifications and documents. The Owner’s determination of a bid’s responsiveness shall
be based on the contents of the bid itself without recourse to extrinsic evidence.
28.4 A bid determined as not substantially responsive will be rejected by the Owner and may not subsequently
be made responsive by the Bidder by correction of non-conformity.
28.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any
29.0 Evaluation of Price Bids:
29.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition will apply:
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of works.
b) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost Compensation for
30.0 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall be
derived as under:
Differential Price (DP)=n1F1+n2F2…+nn Fn, where F1, F2…Fn are the various factors in Indian Rupees
per unit of parameter differential or deficiency in the equipment and services offered as stipulated in these
specifications: n1, n2…nn are the respective parameter differential or deficiency in the corresponding units
to be determined from the Bidder’s proposal. The above factors and corresponding units of parameter
differential are derived from the Technical Specifications, Data sheets and/or Special Conditions of
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value (D) and
from the Bidding Document while evaluating the bids. In determining the Rupee value of the deviations the
Owner will use parameters consistent with those specified in the specifications and documents and or other
information as necessary and available to the Owner.
30.1 Comparison of Bids
The bids shall be compared on the basis of lumpsum prices (i.e., for erection services to be rendered as
quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value of erection cost including other components if
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest evaluated
bid and, as a result of this comparison, the lowest bid will be selected for the award of the Contract.
31.0 AWARD OF CONTRACT
31.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further that the
Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall be the sole judge
in this regard.
32.0 MATCHING OF END COST:
32.1 In case the GETCO decides to award contract on matching end-cost basis, the bidder has to reduce all the
quoted rates proportionately. The reduction on overall basis will not be accepted (i.e. all unit rates of
erection schedule shall be reduced proportionately by difference in percentage). The confirmation for
matching end cost shall be given within 7 (seven) days from the letter from GETCO.
32.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with the
terms and conditions specified in the accompanying Technical Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject all
bids at time prior to award of contract, any without thereby incurring any liability to the affected Bidder or
Bidders or any obligation to inform the affected Bidder or Bidders of the grounds for the Owner’s action.
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will notify
the successful Bidder in writing by registered letter or cable or telex or FAX, to be confirmed in writing by
registered letter, that its bid has been accepted.
34.2 The notification of award will constitute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 36.0, the
Owner will promptly notify each unsuccessful Bidder and will discharge its bid security, pursuant to Clause
35.0 Signing of contract:
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the Owner
will send the Bidder the detailed of Award, incorporating all agreements between the parties.
35.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same with date and
return it to the Owner.
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be
signed within 30 (Thirty) days of notification of Award.
36.0 Contract Performance Guarantee:
36.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be required
to furnish a performance guarantee in form of Bank guarantee from a Public Sector Indian bank/Scheduled,
Commercial Bank in the form to be furnished. The guarantee amount shall be equal to ten percent (5%) of
the Contract price and it shall guarantee the faithful performance of the Contract in accordance with the
terms and conditions specified in these documents and specifications. the guarantee shall be valid up to
90 days after the end of Warranty Period.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment furnished
and erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors and
installed by him shall be free from all defects in design, material and workmanship and shall upon
written notice from the Owner fully remedy free of expenses to the Owner such defects as developed
under the normal use of the said equipment within the period of guarantee specified in the relevant
clause of the General Terms and Conditions in the Part-I / Special Conditions of Contract.
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract.
However, it is not to be construed as limiting the damages under clause entitled “Equipment Performance
Guarantee” in Technical Specifications, Part-II and damages stipulated in other clauses in the Bid
36.4 The performance guarantee will be discharged without any interest at the end of guarantee period, unless
otherwise specified in Special Conditions of Contract.
37.0 Scope of the proposal
37.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering all
the equipment erection and other installation services specified under the accompanying Technical
Specifications. It will include among others as specified therein the following: -
a) Receipt of equipments and material from GETCO’s store, transportation, storage, preservation and
conservation of equipment at the Site.
b) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
c) Reliability tests and performance and guarantee tests on completion of commissioning.
37.2 No deviation whatsoever to certain conditions of the bidding documents permitted by the Owner and
therefore, the Bidders are advised that while making Bid Proposals and quoting prices these conditions
may appropriately be taken into consideration. Bidders are required to furnish a certificate in this regard as
per the format provided in Special Conditions of Contract in a separate sealed envelope containing
Bid security, which shall accompany the Technical Bid. Any Bid not accompanied by such certificate
shall be rejected by the Owner and shall not be opened.
37.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence rejected.
37.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data Sheets
and specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid Proposal
37.5 The scope of work is Bi-Annual Rate Contract for 66KV Undergound Cable Fault Finding and Attending
Work under Jambuva Circle as per standard specification and standard practice of GETCO and as per
Qualification Requirement
To be qualified for award, the bidder shall provide following satisfactory evidence to the Owner of his capability and
adequacy of resources:
Sr.No. Qualifying Requirements
1. Registration : The bidder shall be strictly a GETCO register contractor for UG cable line WORK of any
2. Technical Criteria:
1. Bidder shall have individually executed total 5.0 kms route length of 66kV Underground cable line or
higher voltage class in STU, CTU, any government organization, Private Licensee, Private consumer,
Private shifting etc. during last 3 ( Three ) financial years
1. The bidder should have carried out total 03 nos. of similar nature of work like Fault Finding and
Attending Work with Testing and commissioning of 66KV & above class UG Cable lines during last 3 (
Three ) financial years.
3. Financial Criteria:
1) The bidder shall submit the Bank solvency of the amount which is 20% of the total estimated cost of
4. Additional Documents:
1. Electrical Contractor Licence with latest validation
2. Payment of Tender fee and EMD.
3. GST registration certificate. (Certificate of Provisional GST registration shall not be accepted).
4. Details of Proprietorship / Partners/Directors of the Firm/Company. Partnership deed, MOA, BR,
5. Copy of power of attorney as the case may be.
6. PF registration
7. The Bidder should have to submit copy of PAN card.
8. Financial turn over for last three years shall be submitted along with bid duly approved by charted
accountant & IT returns along with profit Loss and Balance sheet of Last three financial years.
9. Payment of Tender fee and EMD.
10. Experience Certificate of work executed with copy of work order
11. List of tools and tackles.
1. Complete Technical bid ,all tender documents (Scan copy of notarized/self-attested as per tender
specification) ,RTGS/ NEFT transaction slip for payment made for tender fee and EMD to be submitted on
line only (which is mandatory) on (n) procure Portal.No physical documents to be submitted by the bidder
2. The above-cited requirements are only indicative. The owner reserves the right to requisition any other
relevant information and also reserves the right to reject the Bid proposal of any Bidder, if in the Owner’s
opinion the Qualification data is incomplete and Bidder is not qualified to perform the Contract satisfactorily.
1. The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering all
the services specified under the accompanying Technical Specifications.
2. The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, technical Data Sheets
and specified elsewhere.
3. The scope of work is Bi-Annual Rate Contract for 66KV Undergound Cable Fault Finding and Attending
Work under Jambuva Circle as per standard specification and standard practice of GETCO and as per EIC.
4. The above work shall be done as per GETCO’s approved drawing/layout.
5. Transportation of material from the store to the Site.
6. Receipt storage, preservation and conservation of 66 KV cable & all accessories at the Site.
7. Pre-assembly, if any, insurance, erection, testing and commissioning of all the quipments/accessories of
66 KV cable line
8. Reliability tests and performance guarantee tests on completion of commissioning.
9. Necessary field quality plan of GETCO shall be implemented and necessary documentation shall also be
maintained as per GETCO’s norms and instruction of EIC. If required field quality plan shall be available at
10. During the work of erection / Shifting of line safety check list shall be followed. Necessary check list will be
available at our field office.
11. Successful bidder has to appoint site Engineer to maintained site register & FQP as per ISO.
12. All work should be done accordingly to ISO & FQP and all require documents including Filled FQP, testing
results etc. should be submitted while handing over the completed work.
13. The quantity mentioned in price bid is tentative and may vary in actual work order.
14. The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data Sheets
and specified elsewhere.
15. The work includes laying. Erection, Testing and Commissioning of 66kV XLPE Cable, Straight joints, end
terminations, Mid span joint/ cross bonding joint for power cable, LA & SVC,fixing of cable route marker
items of this tender as detailed in the BOQ, Schedules so as to complete the project.
16. All EE ( AM ) / DE Tech are requested to contact DE Tech Circle office for requirement regarding allotment
of agency for the work covered under subjected ARC with detail planning for indented work, detail of work
proposed ( BOQ) , MOM , well in advance. Also, submit detail of work executed ( BOQ) to DE Tech Circle
office in the interest of monitoring of subjected work.
17. DE Tech Circle office shall have to allot the agency on as and when required basis as per requirement of
field office and has to Co-ordinate amongst agency & concern division office as well as monitoring of
18. Contractor shall have to start work on receipt of intimation from EIC / EE AM and program / allotment given
by DE Tech Circle office as per specifications of the tender and instructions of concern EE AM at the earliest
19. Monthly statement for execution of work shall be submitted to SE Jambuva , DE Tech Circle showing
detailed work carried out for monitoring of order quantity/value.
Superintending Engineer
GETCO, CO- Jambuva,
GENERAL TERMS AND CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its group
companies. i.e. GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL and shall include its legal
representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and
shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Sub-Contractor’ shall mean the person named in the Contract for any part of the Works or any person to
whom any part of the Contract has been sublet by the Contractor with the consent in writing of the Engineer
and will include the legal representatives,successors and permitted assigns of such person.
1.5 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to time for
the purpose of the Contract.
1.6 The terms ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials to be issued to
the Contractor under the Contract.
1.7 ‘Works’ shall mean and include taking delivery of line materials labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.8 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract and
such other schedules and drawings as may be mutually agreed upon.
1.9 ‘Site’ shall mean and include the land and other places on, into or through which the works and the related
facilities are to be erected or installed and any adjacent land, paths, street or reservoir which may be
allocated or used by the Owner or Contractor in the performance of the Contract.
1.10 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with additions
and/or deletions as may be agreed and incorporated in the Letter of Award and the contract agreement for
the entire scope of the works.
1.11 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the works including
erection, testing and putting into satisfactory operation including successful completion of performance and
guarantee tests to be performed at Site by the Contractor including cost of insurances.
1.12 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to inspect
the equipment; stores or Works under the Contract and/or the duly authorized representative of the Owner.
1.13 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice issued by the
Owner notifying the Contractor that his bid has been accepted.
1.14 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.15 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the respective
sub division deputy engineer.
1.16 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.17 Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or seal
as the case may be.
1.18 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As
Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and
phrases of like importance are used the approval, judgment, direction etc. is understood to be a function of
the Owner/Engineer.
1.19 Test on completion shall mean such tests as prescribed in the Contract to be performed by the Contractor
before the work is taken over by the Owner.
1.20 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine and
demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.
1.21 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and Guarantee
Tests, as specified in the accompanying Technical Specifications or otherwise agreed in the Contract.
1.22 ‘Guarantee Period’ shall mean the period during which the Contractor shall remain liable for repair or
replacement of any defective part of the works performed under the Contract.
1.23 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which cannot
be detected during inspection, testing etc, based on the technology available for carrying out such tests.
1.24 ‘Drawing’, ‘Plans, shall mean all:
a) Drawings furnished by the Owner to the Contractor during before execution of work / the progress of the
b) Engineering data and drawings submitted by the Contractor during the progress of the work provided
such drawings are acceptable to the Engineer/Owner after duly approved.
1.25 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter of
1.26 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.27 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
1.28 Terms and expressions not herein defined shall have the same meaning as are assigned to them in the
Indian Sale of Goods Act (1930), failing that in the Indian Contract Act (1872) and failing that in the General
Clauses Act (1897) including amendments thereof, if any.
1.29 In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance Security’.
1.30 GST / Cess means all applicable tax / cess under GST Laws ,GST laws means IGST Act, GST (
compensation to the state for loss of Revenue ) Act, CGST Act, UTGST Act & SGSCT Act, 2017 and all
related ancillary legislations.
1.31 Works contract means a contract for composit supply & covered under the definition of works contract as
defined under section 2 ( 119) , of the CGST act , 2017 or SGST act ,2017 & similar provisions, applicable
under the UTGST act, 2017 & the IGST act ,
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by provisions in other
parts of the Contract.
The works carried out under this Contract shall conform to the all statutory regulation and provisions the acts,
mentioned in the Technical Specifications, and, when no regulations or standard is mentioned, to the
authoritative regulations or standards/ Act, appropriate to the works and such stipulations shall be the latest
issued by the concerned institution.
4.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices, correspondences,
operating and maintenance instructions, drawings or any other writing shall be written in English language.
The Metric System of measurement shall be used exclusively in the Contract.
5.0 CONTRACT DOCUMENTS
5.1 The term Contract Documents shall mean and include the following which shall be deemed to form an
integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders, General
Terms and Conditions of Contract and all other documents included under Volume- I and the Special
Conditions of Contract.
b) Specifications of the erection of the equipments and other technical services to be provided under
the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of clarifications
thereto between the Contractor and the Owner prior to the Award of Contract except to the extent of
d) All the materials, literature, data and information of any sort given by the Contractor along with his
bid, subject to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and special terms and
conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred to the
Engineer whose decision shall be considered as final and binding upon the parties.
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any provision
thereof, or any specification, plan, drawing, pattern, sample or information furnished by or on behalf of the
Owner in connection therewith, to any person other than a person employed by the Contractor in the
performance of the Contract. Disclosure to any such employed person shall be made in confidence and
shall extend only so far as may be necessary for the purpose of such performance.
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the Contract.
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other medium,
photographs or other reproduction of the Works under this Contract, or descriptions of the site, dimensions,
quantity, quality or other information, concerning the works unless prior written permission has been
obtained from the Owner.
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain the
property of the Owner and shall be returned (in all copies) to the Owner on completion of the Contractor’s
performance under the Contract if so required by the Owner.
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will be
treated as a single Contract.
Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage, handling
at site, installation, testing and commissioning including performance testing in respect of all the equipment
material equipment/materials given by the owner after observing standard store procedures for transport
from owner’s stores, insurance, unloading storage handling at site installation testing & commissioning.
7.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for executing,
then the Contractor shall at the time of taking delivery of the equipment/dispatch documents be required to
execute an Indemnity Bond in favor of the Owner in the form acceptable to the SE(TR) GETCO Jambuva
for keeping the equipment in safe custody and to utilize the same exclusively for the purpose of the said
Contract. Samples of Performa for the Indemnity Bond will be furnished during award of Contract.
7.3 The Contract shall in all respects be construed and governed according to Indian Laws.
7.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of
deviations or modifications under the Contract(s).
8.0 JURISDICTION OF CONTRACT
8.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Vadodara shall have
exclusive jurisdiction in all matters arising under this Contract.
9.0 EXECUTION OF CONTRACT:
9.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final agreement
to the Contractor for his scrutiny and approval.
9.2 The Agreement, unless otherwise agreed to, shall be signed within 10 days of the acceptance of the Letter
of Award, at the office the Owner at Jambuva on a date and time to be mutually agreed. The Contractor
shall provide for signing of the Contract, Performance Guarantee, appropriate power of attorney and other
requisite materials. In case the Contract is to be signed beyond the stipulated time, the Bid Guarantee
submitted with the Proposal will have to be extended accordingly.
9.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one signed
original and the rest will be retained by the Owner.
9.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings, and descriptive
materials submitted with the bid, to form a part of the Contract immediately after issue of Letter of Award
9.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with copies
of agreement within fifteen (15) days after the signing of the Contractor.
10.0 ENFORCEMENT OF TERMS
10.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in respect
thereto or to exercise any option therein provided, shall in no way be construed to be a waiver of such
provisions, rights or options or in any way to affect the validity of the Contract. The exercise by either party
of any of its rights herein shall not preclude or prejudice either party from exercising the same or any other
right it may have under the Contract.
11.0 COMPLETION OF CONTRACT
11.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be deemed
to have been completed on the expiry of the guarantee period as provided for under the clause entitled
‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
12.0 TIME – THE ESSENCE OF CONTRACT
12.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner without or
with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the essence
of the Contract. The Contractor shall so organize his resources and perform his work as to complete it not
later than the date agreed to.
12.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate
number of activities covering various key phases of the work such as field erection activities within five (5)
days of the date of Notification of Award. This network shall also indicate the interface facilities to be
provided by the Owner and the dates by which such facilities are needed. The Contractor shall discuss the
network so submitted with the Owner and the agreed network shall form part of the Contract documents.
During the performance of the Contract, if in the opinion of the Engineer, proper progress is not maintained,
suitable changes shall be made in the Contractor’s operations to ensure proper progress without any cost
implication to the Owner. The interface facilities to be provided by the Owner in accordance with the agreed
network shall also be reviewed while reviewing the progress of the Contractor.
12.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by the Contractor as
directed by the Engineer.
12.4 Subsequent to the finalization of the network, the Contractor shall make available to the Engineer a detailed
program in line with the agreed Contract network. Such program shall be reviewed, updated and submitted
to the Engineer every month thereafter.
12.5 The above bar charts/ program shall be compatible with the Owner’s computer environment and furnished
to the Owner on such media as may be desired by the Owner.
13.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given by
the respective construction sub division unless otherwise provided in the notification of award.
14.0 PENALTY FOR DELAY
14.1 If the Contractor fails to successfully complete the work within the time fixed under the Contract, the
Contractor shall pay to the Owner as penalty a sum specified for each specified period of delay. The details
of such penalty are brought out in the accompanying Special Conditions of Contract (SCC).
14.2 Any delay that may take place in work execution beyond Contractual cutoff date stated as per stipulated
delivery period shall be subject to the penalty at the rate of ½ % of the delayed work value plus applicable
taxes (if any) per week or part thereof, with a ceiling of 10 % of the total contract value plus applicable taxes
(if any), detailed in the Special Conditions of Contract (SCC).
14.3 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be entitled
to deduct the amount of Penalty for delay from the amounts payable to the Contractors under any bills
raised under this contract or any other contract with the GUVNL and its Subsidiary Companies i.e. GETCO,
GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to adjust the amount
of Penalty of delay against any Bank Guarantee furnished by the Contractor under this contract or any
other contract with GUVNL and/or its subsidiary companies.
14.4 The penalty will be deducted from bills payable either against this contract or from any Bank Guarantee or
any other amount payable under any other contract with the GETCO.
Total material supplied by the bidder and work executed shall be covered under guarantee period against
any defect in materials, poor workmanship or defect/ wrong design etc. for a period of two years from the
date of commissioning of 66 KV Cable line.
In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss or
damages, repairs or adjustment may be made by the Engineer or a third party chosen by the Engineer
without advance notice to the Contractor and the cost of such work shall be paid by the Contractor. In the
event such action is taken by the Engineer, the Contractor will be notified promptly and he shall assist
wherever possible in making necessary corrections. This shall not relieve the Contractor of his liabilities
under the terms and conditions of the Contract.
If it becomes necessary for the Contractor to replace or renew any defective portions of the works the
provision of this clause shall apply to portion of the works so replaced or renewed until the expiry of twelve
(12) months from the date of such replacement or renewal. If any defects are not remedied within a
reasonable time, the Engineer may proceed to do the work at the Contractor’s risk and cost but without
prejudice to any other rights which the Owner may have against the Contractor in respect of such defects.
The repaired or new parts will be furnished and erected free of cost by the Contractor. If any repair is carried
out on his behalf at the site, the Contractor shall bear the cost of such repairs.
The repaired or new parts will be furnished and erected free of cost by the Contractor. If any repair is carried
out on his behalf at the site, the Contractor shall bear the cost of such repairs.
The repaired or new parts will be furnished and erected free of cost by the Contractor. If any repair is carried
out on his behalf at the site, the Contractor shall bear the cost of such repairs.
The acceptance of the equipment by the Engineer shall in no way relieve the Contractor of his obligations
under this clause.
In the case of those defective parts, which are not repairable at site but are essential for the commercial
operation of the line, the Contractor and the Engineer shall mutually agree to a programme of replacement
or renewal, which will minimize interruption to the maximum extent in the operation of the line.
16.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the
Owner or the Contractor in pursuance of the Contract. In addition the Contractor shall be responsible for
payment of all Indian duties including GST, levies and taxes lawfully assessed against the Contractor for
his personal income & property only.
17.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for the
failure, omission or neglect on the part of the Contractor to perform any acts, matters, covenants or things
under the Contract, or for damage or injury caused by the alleged omission or negligence on the part of the
Contractor, his agents, representatives or his Sub-Contractors, or in connection with any claim based on
lawful demands of Sub-Contractors, workmen, suppliers or employees, the Contractor shall in all such
cases indemnify and keep the Owner, and the Engineer and/or his representative, harmless from all losses,
damages, expenses or decrees arising of such action.
18.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor from
all his liabilities under the Contract. Such final payment shall be made only at the end of the
Guarantee/Warranty period or after finalization of material account and final bill and till such time as the
Contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments made under
the Contract shall be treated as on-account payments.
19.0 ENGINEER’S DECISION
19.1 In respect of all matters which are left to the decision of the Engineer including the granting or with-holding
of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a decision
19.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the meaning
and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days after receipt of
the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the Engineer’s
decision and the decision shall become final and binding.
19.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent to the
right to request arbitration. It is the intent of the Agreement that there shall be no delay in the execution of
the works and the decision of the Engineer as rendered shall be promptly observed.
20.0 POWER TO VARY OR OMIT WORK
20.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to as
‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the Contractor
except as directed in writing by the Engineer, but the Engineer shall have full powers subject to the
provisions hereinafter contained, from time to time during the execution of the Contract, by notice in writing
to instruct the Contractor to make such variation without prejudice to the Contract. The Contractor shall
carry out such variation and be bound by the same conditions as far as applicable as though the said
variations occurred in the Contract Documents. If any suggested variations would, in the opinion of the
Contractor, if carried out, prevent him from fulfilling any of his obligations or guarantees under the Contract,
he shall notify the Engineer thereof in writing and the Engineer shall decide forthwith whether or not, the
same shall be carried out and if the Engineer confirms his instructions, the Contractor’s obligations and
guarantees shall be modified to such an extent as may be mutually agreed. Any agreed difference in cost
occasioned by any such variation shall be added to or deducted from the Contract Price as the case may
20.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials are
already prepared or any design, drawings or pattern made or work done as per the contract requires to be
altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
20.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement of
carrying out the alterations or additional or substituted work which either then or later on, will in the opinion
of the Contractor, involve a claim for additional payment, the Contractor shall immediately and in no case
later than thirty (30) days, after receipt of the instructions aforesaid and before carrying out the instructions,
advise the Engineer to that effect. But the Engineer shall not become liable for payment of any charges in
respect of any such variations, unless the instructions for the performance of the same shall be confirmed
in writing by the Engineer.
20.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing, so to
the extent of any change in the price, before the Contractor proceeds with the change.
20.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the decision
of the Engineer shall prevail.
20.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct the
Contractor, in writing, during the execution of the Contract to vary the quantities of the items or groups of
items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section GCC of this
Volume-I. The Contractor shall carry out such variations and be bound by the same conditions as though
the said variations occurred in the Contract Documents. However, the Contract Price shall be adjusted at
the rates and the prices provided for the original quantities in the Contract.
21.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT:
No subletting of contract is allowed. Contractor should carry out work on his own under his or his authorized
supervisor and by labours employed by him.
22.0 CHANGE OF QUANTITY
22.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the quantities
of items under the Contract but without any change in unit price or other terms & conditions. Such variations
unless otherwise specified in the accompanying Special Conditions of Contract and/or Technical
Specifications, shall not be subjected to any limitation for the individual items but the total variations in
all such items under the Contract shall be limited to a percentage of the Contract price as specified
in the Special Conditions of Contract.
22.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for the
change in quantities as above. The base unit rates, as identified in the Contract shall however remain
constant during the currency of the Contract, except as provided for in Clause 33.0 below. In case the unit
rates are not available for the change in quantity, the same shall be subjected to mutual agreement.
23.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers and
freely exchange with them such technical information as is necessary to obtain the most efficient and
economical design and to avoid unnecessary duplication of efforts. The Engineer shall be provided with
three copies of all correspondence addressed by the Contractor to other Contractors and Consulting
Engineers of the Owner in respect of such exchange of technical information, wherever needed.
24.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor any
order by the Owner or the Engineer for payment of money or any payment for or acceptance of, the whole
or any part of the Works by the Owner or the Engineer, nor any extension of time, nor any possession taken
by the Engineer shall operate as a waiver of any provision of the Contract, or of any power herein reserved
to the Owner or any right to damages herein provided nor shall any waiver of any breach in the Contract
be held to be a waiver of any other or subsequent breach.
25.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the rights of
the Owner against the Contractor or relieve the Contractor of his obligation for the due performance of the
Contract, or be interpreted as approval of the Works done or of the equipment furnished and no certificate
shall create liability for the Owner to pay for alterations, amendments, variations or additional works not
ordered, in writing , by the Engineer or discharge the liability of the Contractor for the payment of damages
whether due, ascertained, or certified or not or any sum against the payment of which he is bound to
indemnify the Owner, nor shall any such certificate nor the acceptance by him of any sum paid on account
or otherwise affect or prejudice the rights of the Owner against the Contractor.
26.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own cost
submit periodic progress reports as may be reasonably required by the Engineer with such materials as,
charts, net-works, photographs, test certificates, etc. Such progress reports shall be in the form and size
as may be required by the Engineer.
27.0 BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating starting and
completion dates of each activity. This is mandatory condition the tenders without which shall be liable to
28.0 TAKING OVER
Upon successful completion of work of erection of tower line by the Contractor, the Engineer shall issue to
the Contractor a completion Certificate as a proof of the final acceptance of the erected line. Such certificate
shall not unreasonably be withheld nor will the Engineer delay the issuance thereof on account of minor
omissions or defects which do not affect the commercial operation and/or cause any serious risk to the
erected line. Such certificate shall not relieve the Contractor of any of his obligations which otherwise
survive, by the terms and conditions of the Contract after issue of such certificate.
C. CONTRACT SECURITY AND PAYMENTS
29.0 CONTRACT PERFORMANCE GUARANTEE
The Contractor shall furnish Contract Performance Guarantee(s) for the proper fulfillment of the Contract
in the prescribed form within fifteen (15) days of “Notice of Award of Contract”. The performance
guarantee(s) shall be as per terms prescribed.
30.1 The payment to the Contractor for the performance of the works under the Contract will be made by the
Owner as per the guidelines and conditions specified herein. All payments made during the Contract shall
be on account payments only. The final payment will be made on completion of all Works and on fulfillment
by the Contractor of all his liabilities under the Contract.
30.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of conditions
specified thereof.
31.0 Payment Schedule:
31.1 Application for Payment
31.2 The Contractor shall submit application for the payment in the prescribed proforma of the Owner. Performa
for application for payment will be as prescribed.
31.3 Each such application shall state the amount claimed and shall set forth in detail, in the order of the Payment
Schedule, particulars of the Works including the Works executed at Site and of the equipment
shipped/brought on to the site pursuant to the Contract up to the date mentioned in the application and for
the period covered since the last preceding certificate, if any.
31.4 Every interim payment certificate shall certify the Contract value of the Works executed up to the date
mentioned in the application for the payment certificate, provided that no sum shall be included in any
interim payment certificate in respect of the works that, according to the decision of the Engineer, does not
comply with the Contract.
31.5 Mode of Payment
Payment due on completion of work shall be made by the Owner through Owner’s Bank or directly to the
Contractor as per the payment schedule.
31.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract after
signing the Contract Agreement.
Progressive payments linked with erection shall only be made after the issue of certificates by the Engineer,
one for the quantum of work completed and the other for the successful completion of quality check points
involved in the quantum of work billed.
32.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. All such claims shall be
billed by the Owner to the Contractor regularly as and when they fall due. Such bills shall be supported by
appropriate and certified vouchers or explanations, to enable the Contractor to properly identify such claims.
Such claims shall be paid by the Contractor within thirty (30) days of the receipt of the corresponding bills
and if not paid by the Contractor within the said period, the Owner may then deduct the amount, from any
monies due or becoming due by him to the Contractor under the Contract or may be recovered by sections
of Law or otherwise.
D. RISK DISTRIBUTION
33.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all perils
detailed herein. The form and the limit of such insurance as defined herein together with the under-writer
in each case shall be acceptable to the Owner. However, irrespective of such acceptance, the responsibility
to maintain adequate insurance coverage at all time during the period of Contract shall be of Contractor
alone. The Contractor’s failure in this regard shall not relieve him of any of his contractual responsibilities
and obligations. The insurance covers to be taken by the Contractor shall be in the joint name of the Owner
and the Contractor. The Contractor shall, however, be authorized to deal directly with Insurance Company
or Companies and shall be responsible in regard to maintenance of all insurance covers. Further the
insurance should be in freely convertible currency.
33.2 Any loss or damage to the material during handling, transportation, storage, erection, and all activities to
be performed till the successful completion of commissioning of the line shall be to the account of the
Contractor. The Contractor shall be responsible for preference of all claims and make good the damages
or loss by way of repairs and/or replacement of the equipment, damaged or lost. The transfer of title shall
not in any way relieve the Contractor of the above responsibilities during the period of Contract. The
Contractor shall provide the Owner with copy of all insurance policies and documents taken out by him in
pursuance of the Contract. Such copies of documents shall be submitted to the Owner immediately after
such insurance coverage. The Contractor shall also inform the Owner in writing at least sixty (60) days in
advance regarding the expiry/cancellation and/or change in any of such documents and ensure
revalidation, renewal etc., as may be necessary well in time.
33.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied
risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit,
theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions, accidents of
all kinds, etc. The scope of such insurance shall be adequate to cover the replacement/reinstatement cost
of the equipment for all risks up to and including delivery of goods and other costs till the equipment is
delivered at Site. The insurance policies to be taken should be on replacement value basis and/or
incorporating escalation clause. Notwithstanding the extent of insurance cover and the amount of claim
available from the underwriters, the Contractor shall be liable to make good the full replacement/rectification
value of all equipment/materials and to ensure their availability as per project requirements.
33.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account and
will be included in Contract Price, However, the Owner may from time to time, during the pendency of the
Contract, ask the Contractor in writing to limit the insurance coverage, risks and in such a case, the parties
to the Contract will agree for a mutual settlement, for reduction in Contract price to the extent of reduced
premium amount. The Contractor, while arranging the insurance shall ensure to obtain all discounts on
premium which may be available for higher volume or for reason of financing arrangement of the project.
33.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional insurance
requirements for the portion of the works to be performed at the Site.
33.6 Special Conditions of Contract details out the various insurance liabilities.
34.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the successful
completion of commissioning as defined elsewhere in the Bid document.
35.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
35.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or his
authorized agents, then the Contractor shall be given due extension of time for the completion of the Works,
to the extent such omission on the part of the Owner has caused delay in the Contractor’s performance of
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be final.
35.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if such
delays have resulted in any increase in cost. The Owner shall examine the justification for such a request
for claim and if satisfied, the extent of compensation shall be mutually agreed depending upon the
circumstances at the time of such an occurrence.
36.0 DEMURRAGE, WHARFAGE, ETC.
All demurrage, warfare and other expenses incurred due to delayed clearance of the material or any other
reason shall be to the account of the Contractor.
37.0 FORCE MAJEURE
37.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the Owner
as the case may be, which they could not foresee or with a reasonable amount of diligence could not have
foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or undeclared,
priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other in
writing of such causes.
37.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from any
force majeure cause as referred to and/or defined above:
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even though
such cause may occur after Contractor’s performance of obligation has been delayed due to other causes.
38.0 SUSPENSION OF WORK
38.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works
without invalidating the provisions of the Contract. Orders for suspension or reinstatement of the Works
will be issued by the Engineer to the Contractor in writing. The time for completion of the works will be
extended for a period equal to duration of the suspension.
38.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the
works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the Engineer.
The Owner shall not be responsible for any liabilities if suspension or delay is due to some default on the
part of the Contractor or his Sub-Contractor.
39.0 “RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the contract against
the Contractor, the Owner shall be entitled to withhold and also have a lien to retain such sum or sums in
whole or in port from the security, If any, deposited by the Contractor and for the purpose aforesaid, the
Owner shall be entitled to encash and withhold the amount of Performance Bank Guarantee or other
security, if any, furnished as the case may be. The Owner shall also have a lien over the same pending
finalization or adjudication of any such claim. In the event Of the security is insufficient to cover the claimed
amount or amounts, the Owner shall be entitled to withhold and have lien to retain to the extent of the such
claimed amount or amounts referred to above, from any sum or sums found payable or which at any time
thereafter may become payable to the Contractor under the same contract or any other contract with the
Owner or GUVNL or its subsidiary companies pending finalization or adjudication of any such claim.
Lien in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (Including the security deposit) under the contract
may be withheld or retained by way of lien by the Owner against any of its claim in respect of payment of
a sum of money arising out of or under any other contract made by the Contractor with the Owner or GUVNL
or any of its subsidiary companies.
b) It is on agreed that the sum of money so withheld or retained under this clause by the Owner will be
kept withheld or retained as such by the Owner till its claim arising out of the same contract or any other
contract is either mutually settled or determined by the arbitrator or competent court, as the case may be,
and the Contractor shall have no claim for interest or damages whatsoever on this account or on any other
ground in respect of any sum of money withheld or retained under this clause and as may be duly notified
to the Contractor.
40.0 CONTRACTOR`S DEFAULT
40.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse or
neglect to comply with any reasonable order given to him, in writing by the Engineer in connection with the
works or shall contravene the provisions of the Contract, the Owner may give notice in writing to the
Contractor to make good the failure, neglect or contravention complained of. Should the Contractor fail to
comply with the notice within thirty (30) days from the date of serving the notice, then and in such case the
Owner shall be at liberty to employ other workmen and forthwith execute such part of the works as the
Contractor may have neglected to do or if the Owner shall think fit, without prejudice to any other right he
may have under the Contract to take the work wholly or in part out of the Contractor’s hands and re-contract
with any other person or persons to complete the works or any part thereof and in that event the Owner
shall have free use of all Contractor’s equipment that may have been at the time on the Site in connection
with the works without being responsible to the Contractor for fair wear and tear thereof and to the exclusion
of any right of the Contractor over the same, and If the sum that the contractor is entitled to be paid plus
the costs incurred by the Owner in completing the works, exceeds the Contract Price or the entire works if
entire works have been completed or the price for part of the work if part of the works have been completed,
the Contractor shall be liable for such excess.
If such excess is greater than the sums due to the Contractor, the Contractor shall pay the balance to the
Owner and if such excess is less than the sums due to the Contractor, Owner shall pay the balance to the
Contractor. For facilitating such payment, Owner shall pay the balance to the contractor. For facilitating
such payment, Owner shall encash the Bank Guarantees of Contactor available with Owner/s and retain
such other payment due to the Contractor under the Contract in question or any other Contract that the
Owner/s may have with the Contractor. Such payment of excess amount shall be independent of the
liquidated damages for delay which the Contractor shall have to pay if the completion of works is delayed.
40.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay
liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
40.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not entitle
the Contractor to reduce the value of the Contract Performance Guarantee nor the time thereof. The
Contract Performance Guarantee shall be valid for the full value and for the full period of the Contract
including guarantee period.
41.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
41.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other than
those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event give fifteen
(15) days notice in writing to the Contractor of his decision to do so.
41.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent specified
in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to the extent
they are related to the work terminated and terms satisfactory to the Owner, stop all further sub-contracting
or purchasing activity related to the work terminated, and assist Owner in maintenance, protection, and
disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and reasonable,
dictated by the circumstances prevalent at the time of termination.
41.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if the
Contractor is a partnership concern and one of the partners dies then unless the Owner is satisfied that the
legal representatives of the individual Contractor or of the proprietor of the propriety concern and in the
case of partnership, the surviving partners, are capable of carrying out and completing the Contract the
Owner shall be entitled to cancel the Contract as to its incomplete part without being in any way liable to
payment of any compensation to the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of the Owner that the legal
representatives of the deceased Contractor or surviving partners of the Contractor’s firm cannot carry out
and complete the Contract shall be final and binding on the parties. In the event of such cancellation the
Owner shall not hold the estate of the deceased Contractor and/or the surviving partners of the estate of
the deceased Contractor and/or the surviving partners of the Contractor’s firm liable to damages for not
completing the Contract.
42.0 FRUSTRATION OF CONTRACT
42.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section 56 of the
Indian Contract Act, parties shall be absolved of their responsibility to perform the balance portion of the
Contract, subject to provisions contained in sub-clause 42.3 below.
42.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason of
willful or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall be
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties hereto
shall be relieved from carrying out further obligations under the Contract treating it as frustration of the
42.3 In the event referred to in sub-clauses 42.1 & 42.2 above the parties shall mutually discuss to arrive at
reasonable settlement on all issues including amounts due to either party for the work already done on
quantum merit basis which shall be determined by mutual agreement between the parties.
43.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor or his
partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their behalf in
relation to the obtaining or to the execution of this or any other Contract with the Owner, shall in addition to
any criminal liability which it may incur, subject the Contractor to the cancellation of this and all other
Contracts and also to payment of any loss or damage to the Owner resulting from any cancellation. The
Owner shall then be entitled to deduct the amount so payable from any monies otherwise due to Contractor
under the Contract.
E. RESOLUTION OF DISPUTES
44.0 SETTLEMENT OF DISPUTES
44.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent possible,
be settled amicably between the parties.
44.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor,
arising out of the Contract for the performance of the Works whether during the progress of the Works or
after its completion or whether before or after the termination, abandonment or breach of the Contract, it
shall, in the first place, be referred to and settled by the Engineer, who, within a period of thirty (30) days
after being requested by either party to do so, shall give written notice of his decision to the Owner and the
44.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and binding
upon the parties until the completion of the Works and shall forthwith be given effect to by the Contractor
who shall proceed with the Works with all due diligence, whether he or the Owner requires arbitration as
hereinafter provided or not.
44.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has been
communicated to him by either party within thirty (30) days from the receipt of such notice, the said decision
shall become final and binding on the parties.
44.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being
requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with any
such decision, or within thirty (30) days after the expiry of the first mentioned period of thirty days, as the
case may be, either party may require that the matters in dispute be referred to arbitration as hereinafter
45.0 ARBITRATION
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this contract
with reference to the construction, interpretation, breach, termination or validity thereof (hereinafter
referred as "the Dispute") shall, upon the written request of either Party be referred to the authorized
representatives of the Disputing Parties for resolution. The authorized representatives shall promptly meet
and attempt to negotiate in good faith a resolution of the Dispute within thirty days of the service of the
(2) Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as indicated herewith in
sub clause (1) of Clause, arising under or in connection with the present works contracts, whether pertaining
to works contracts alone or works and procurement both, the same shall be referred to arbitration under
the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act, 1992."
46.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering payments claimed and
the payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner. The
Contractor shall also prepare and submit a detailed account of Owner Issue materials received and utilized
by him for reconciliation purpose in a format to be discussed & finalized with the Owner before the award
47.0 TAKING DELIVERY AND INSURANCE
47.1 The contractor has to take delivery from construction store of Tower material, H-frame structure material,
conductor & line material keeps S/S materials in safe custody and transport to the respective sites and will
be fully responsible for any damage to or loss of all materials at any stage during transportation or erection
or taking over of the line by GETCO.
47.2 The Contractor has to open site store and ensure for safe custody of all the stored materials at his own
47.3 The Contractor shall have total responsibility for the entire tower & line materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable security
arrangements at his own cost to ensure the protection of all materials, equipment and works from theft, fire
pilferage and any other damages and loss. It shall be the responsibility of the contractor to arrange for
security till the works are finally taken over by the Corporation.
48.0 STORAGE-CUM-ERECTION INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost, which are required to
complete the 66 KV cable line including material supplied by owner. Bidder shall have to take the
comprehensive Marine Cum Erection (Overall) insurance policy against any loss, damage, theft, pilferage,
fire etc. for the complete period of storage, erection and commissioning up to the time of taking over of the
66 KV cable line by GETCO. However, if the work is not completed within the stipulated time limit as
mentioned into work order, the MCE shall be extended by the contractor up to the work completion and
taking over of the 66 KV cable line by GETCO. Moreover, the charge for extension of insurance shall be
borne by contractor if the delay is attributed to the contractor. The charge for extension of insurance shall
be reimbursed by GETCO to the contractor on production of proof for extension of MCE if the delay is
attributed on the part of GETCO. The contractor shall deal directly and pursue the claim with the insurance
company and shall be responsible in regard to maintenance of all insurance coverage as well as for
settlement of claim. The proof of insurance policy taken by the contractor shall be furnished / submitted to
engineer-in-charge of GETCO.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to lodge, pursue
and settle all the claims with the Insurance Company for all items, materials and the GETCO shall be kept
informed about it. Contractor shall replace the lost / damaged materials / items promptly irrespective of the
settlement of the claims by underwriter and ensure that the work progress is as per agreed schedule. The
loss, if any, such replacement will have to be borne by the Contractor and GETCO will not entertain any
claim / representation in this regard. However it will be contractor's responsibility to insure the entire project
till the cable line is taken over by the GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk shall
be covered for lifting of materials from store to final handing over to GETCO. Further, in absence of the
above insurance policy, R.A.bill payment will be withheld.
Bidder shall note that storage cum erection insurance is to be taken at his own cost and amount of material
for erection to complete the scope.
Successful bidder shall have to take insurance as mentioned below :
Successful bidder has to take insurance amounting Rs.10.00 Lakh having validity of 02 years i.e. entire
contract period immediately on receipt of the work order.
During Bi-annaul ARC duration, if any untoward incident took place and contractor is forced to claim the
insurance then GETCO will review the balance insurance cost.In such case, successful bidder will be bound
to take additional insurance policy for the balance period i.e. upto due date of completion of work
If time limit extension beyond the contract period is required on mutual aggrement between GETCO &
successful bidder , in that case require insurance policy shall be taken by successful bidder for extension
49.0 Termination of Contract:
In case of contractor fails to complete the transmission line work or part thereof within contractual period
or in case the work is found not in accordance with prescribed specification the GETCO shall exercise its
discretionary power either:
49.1 To recover, from the contractor as agreed, by way of penalty clause above applicable taxes (if any)
49.2 To get the work done other contractor after giving due notice to the contractor on account and at the risk
of the contractor for such work executed or other similar description without canceling the contract in
respect of the works not yet due for completion or
50.0 To cancel the contract.
In the event of the risk works of similar description, the opinion of the GETCO shall be final. In the event
of action taken under clause (A) or (B) above, the contractor shall be liable to pay for any loss which the
GETCO may sustain on that account, but the contractor shall not be entitled to have any saving on such
purchases made against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any time for
rejection of the stores.
51.0 LABOUR LAWS:
51.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be employed
in the night shift between 07.00 p.m. and 06.00 a.m. next day.
51.2 Contractor shall maintain a valid labor license under the contract Labor (Regulation and abolition) Act for
employing necessary manpower required by him. In the absence of such license, the contract shall be
liable to be terminated without assigning any reason thereof.
51.3 The Contractor shall at his own expenses comply with all labor laws and keep the GETCO indemnified in
respect thereof. Some of the major liabilities under various labor and industrial laws which the Contractor
shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or other
Statutory Authority.
ii) Payment of deposit in respect of each contract labor at the rate of Rs. 30/- or later prevailing rate
with the Office of Commissioner of Labor as per the Contract Labor (Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for
every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial Dispute
Act. Any payment to the Contractor’s employee arising out of any claim of disputes under the
Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed under
the various labour laws, in force from time to time, from Statutory Authorities like State Government/
Government o India, which the Contractor shall have to comply with.
51.4 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee. Provident
Fund and Family Pension Scheme at the rate of 18% (or at the rate made applicable by the Government
from time to time of the wages. The Contractor’s contribution and his worker’s contribution towards
Provident Fund and Family Pension Scheme shall be deposited by the Contractor with Regional Provident
Fund Commissioner, Ahmedabad.
51.5 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of the
Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional Provident Fund
Commissioner, Ahmedabad.
51.6 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor with
Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
51.7 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labor, shall be
provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for individual
laborer which shall be duly verified, approved and certified by the authorized Officer of the GETCO.
51.8 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the liability
insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pungency of the contract.
51.9 The contractor shall employ adequate number of experienced skilled at site for daily supervision and for
maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
51.10 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO also,
Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and expenses
whatsoever, arising out of or in connection with the matters referred herein above elsewhere and against
all actions, proceedings, claims, demands, costs and expenses which may be made against the GETCO
or Government for or in respect of performance of his obligation under the contract documents. The GETCO
shall not be liable for intervention of authority Government for or in respect of performance of his obligation
under the contract documents. The GETCO shall not be liable for or in respect of or in consequence of any
accident or injury to any workman or other person in the employment of the Contractor or his Sub-
Contractor and the contractor shall indemnify and keep indemnified the GETCO against all claims,
demands, proceedings, cost, charges and expenses whatsoever in respect thereof or in relation thereto.
51.11 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this contract.
If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide workmen’s employer’s
liability insurance for the latter’s employees, such employees shall be covered under the Contractor’s
51.12 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates fixed under the
minimum wages act. The wages of every Contract Labor employed by him under this contract shall also
be paid by him before the expiry of 7th day of the last day of the month in respect of the wages are payable
(i.e. wages of a month have to be paid by him in the first week of the next month). Any default will result
in cancellation of contract forthwith or else the contractor shall be punishable to the extent of Rs. 100/-
per each day or as per the prevailing rules of labor laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case of labor
trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his office outside the
factory work premises and the Contractor shall arrange to have his office outside the factory work
premises and the Contractor shall keep himself present throughout the working hours.
52.0 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
ii) The contractor should mention separate P.F. code number allotted by PPFC, along with the tender.
Signature of Contractor) Superintending
Seal: GETCO,C.O., Jambuva
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these specifications &
document and shall govern the portion of the work of this Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his representative at
Site suitably designated for the purpose of overall responsibility and coordination of the works to be
performed at Site. Such person shall function from the Site office of the Contractor during the pendency of
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the performance of
his field activities. He shall also comply with the Minimum Wages Act, 1948 and the Payment of Wages Act
(both of the Government of India) and the rules made there under in respect of any employee or workman
employed or engaged by him or his Sub-Contractor. He shall abide by labour laws and others as specified
in the special conditions of contract.
2.2 All initial registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract
shall be to the account of the Contractor. Should any such inspection or registration need to be re-arranged
due to the fault of the Contractor or his Sub Contractor, the additional fees to such inspection and/or
registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all tower, H-frame, Stringing and other line material brought to the Site for
the purpose of erection, testing and commissioning of the line to be erected under the Contract. The Owner
shall continue to hold the lien on all such material throughout the period of Contract. No material brought
to the Site shall be removed from the Site by the Contractor and/or his Sub-Contractors without the prior
written approval of the Engineer.
4.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the Contract.
Any written order or instruction of the Engineer or his duly authorized representative shall be communicated
to the said authorized resident representative of the Contractor and the representative shall be available at
a stated address for this purpose.
5.0 ACCESS TO SITE AND WORKS ON SITE
5.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in
reasonable time.
5.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the Owner
may approve and the Owner shall give the Contractor reasonable facilities for carrying out the works.
5.3 In the execution of the works, no person other than the Contractor or his duly appointed representative,
Sub- Contractor and workmen, shall be allowed to do work on the Site,except by the special permission, in
writing of the Engineer or his representative.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the Owner and
doing work in the vicinity of the Works under the Contract. The Contractor shall also so arrange to perform
his work as to minimize, to the maximum extent possible, interference with the work of other Contractors
and their workmen. Any injury or damage that may be sustained by the employees of the other Contractors
and the Owner, due to the Contractor’s work shall promptly be made good at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his employees
and workmen at Site. The Engineer shall be at liberty to object to the presence of any representative or
employee of the Contractor at the Site, if in the opinion of the Engineer such employee has misconduct
himself or is incompetent or negligent or otherwise undesirable and then the Contractor shall remove such
a person objected to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and schedules
for carrying-out each part of the works. Any review of such plan or schedule or method of work by the
Engineer shall not relieve the Contractor of any of his responsibilities towards the field activities. Such
reviews shall also not be considered as an assumption of any risk or liability by the Engineer or the Owner
or any of his representatives and no claim of the Contractor will be entertained because of the failure or
inefficiency of any such plan or schedule or method of work reviewed. The Contractor shall be solely
responsible for the safety, adequacy and efficiency of plant and equipment and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the safety
of all persons employed by him or his Sub–Contractor and all the properties under his custody during the
performance of the work. This requirement shall apply continuously till the completion of the Contract and
shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any, photographs
of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall highlight
comparison to the schedules. The report shall also indicate the reasons for the variance between the
scheduled and actual progress and the action proposed for corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hour’s schedule
for the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged works
to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with experience
of his particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances
and other payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency under
any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour Regulation
Abolition Act or any other law due to act of omission of the Contractor, the Owner may make such payment
and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
13.1 Space : Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at site,
land for construction of Contractor’s field office, workshop, stores,etc. required for execution of the Contract.
Any such temporary construction shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer. Until and unless
the Contractor has handed over the vacant possession of land allotted to him for the above purpose, the
payment of his final bill shall not be made.
13.2 Electricity:
The concerned Executive Engineer shall apply for temporary connection at site.Sub-division paying required
service charges & deposit.Such temporary connections to be released on the name of Contractor on
recommendation of the concerned Executive Engineer. The power so consumed shall be charged at the
prevailing tariff rate
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings required for
pre-assembly, erection, of the Towers, H-frame, string, earthing etc, covered under the Contract. He shall
submit a list of all such materials to the Engineer before the commencement of work at Site. These tools
and tackles shall not be removed from the Site without the written permission of the Engineer.
The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personals shall be trained in administering
14.3 Cleanliness
The Contractor shall be responsible for keeping the entire area allotted to him clean and free from rubbish,
debris etc. during the period of Contract. The Contractor shall employ enough number of personnel to keep
the work area clean. Materials and stores shall be so arranged to permit easy cleaning of the area. In
areas where equipment might drip oil and cause damage to the floor surface, a suitable protective cover of
a flame resistant, oil proof sheet shall be provided to protect the floor from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings. The
Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical control points
will be established and marked by the Engineer at site at suitable points. These points shall be used as
datum for the works under the Contract. The Contractor shall inform the Engineer well in advance of the
times and places at which he wishes to do work in the area allotted to him so that suitable datum points
may be established and checked by the Engineer to enable the Contractor to proceed with his works. Any
work done without being properly located may be removed and/or dismantled by the Engineer at
Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize fire hazards to
the extent practicable. Combustible materials, combustible waste and rubbish shall be collected and
removed from the Site at least once each day. Fuels, oils and volatile or inflammable materials shall be
stored away from the construction and equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for fire fighting.
Enough of such trained personnel must be available at the Site during the entire period of the Contract.
The Contractor shall have total responsibility for all equipment and materials in his custody/stores, loose,
semi-assembled and/or erected by him at Site. The Contractor shall make suitable security arrangements
ensure the protection of all materials, equipment and works from theft, fire, pilferage and any other damages
18.0 MATERIALS HANDLING AND STORAGE
18.1 All the material furnished under the Contract and arriving at Site shall be promptly received, unloaded,
transported and stored in the storage spaces by the Contractor.
18.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of any
damages, storage, discrepancy etc, for the purpose of Engineer’s information only. The Contractor shall
submit to the Engineer every week a report detailing all the receipts during the week. However, the
Contractor shall be solely responsible for any shortages or damages in transit, handling and / or in storage
and erection of the equipment at Site. Any demurrage, wharf age and other such charges claimed by the
transporters, railways etc, shall be to the account of the Contractor.
18.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment
materials received by him for the purpose of erection and keep such record open for the inspection of the
Engineer in-charge.
18.4 All material shall be handled very carefully to prevent any damage or loss. The equipment stored shall be
properly protected to prevent damage either to the equipment or to the floor where they are stored. The
equipment from the store shall be moved to the actual location at the appropriate time so as to avoid
damage of such equipment at Site.
18.5 All material shall be protected against moisture ingress and corrosion during storage and periodically
18.6 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected and
stored in a suitable manner to prevent damage or deterioration in quality by storage.
18.7 All the materials stored in the open or dusty location must be covered with suitable weatherproof and flame
proof covering material wherever applicable.
18.8 If the materials belonging to the Contractor are stored in areas other than those earmarked for him, the
Engineer will have the right to get it moved to the area earmarked for the Contractor at the Contractor’s
18.9 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment,
which require indoor storage. Normally, all the electrical equipment such as motors, control gears,
generators, exciters and consumables like electrodes, lubricants etc. shall be stored in the closed storage
space. The Engineer, in addition, may direct the Contractor to move certain other materials, which in his
opinion will require indoor storage, to indoor storage areas, which the Contractor shall strictly comply with.
19.0 CONSTRUCTION MANAGEMENT
19.1 The field activities of the Contractors working at Site will be coordinated by the Engineer and the Engineer’s
decision shall be final in resolving any disputes or conflicts between the Contractor and other Contractors
and the tradesmen of the Owner regarding scheduling and coordination of work. Such decision by the
Engineer shall not be a cause for extra compensation or extension of time for the Contractor.
19.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be designated by
the Engineer. The Contractor shall attend such meetings and take notes of discussions during the meeting
and the decision of the Engineer and shall strictly adhere to those decisions in performing his works. In
addition to the above weekly meeting, the Engineer may call for other meetings either with individual
Contractors or with selected number of Contractors and in such a case the Contractors if called, will also
attend such meetings.
19.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his works
in accordance with the specified construction schedule. If at any time, the Contractor is falling behind the
schedule, he shall take necessary action to make good for such delays by increasing his work force or by
working overtime or otherwise accelerate the progress of the work to comply with the schedule and shall
communicate such actions in writing to the Engineer, satisfying that his action will compensate for the delay.
The Contractor shall not be allowed any extra compensation for such action.
19.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or supply
or any other services to the Contractor except for the coordination work between various Contractors if any
20.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The Contractor
shall also maintain in addition the continuous record of all changes to the above Contract Documents,
drawings, specifications, and supplementary data, etc. effected at the field and on completion of his total
assignment under the Contract shall incorporate all such changes on the drawings and other Engineering
data to indicate as installed conditions of the equipment furnished and erected under the Contract. Such
drawings and Engineering data shall be submitted to the Engineer in required number of copies.
21.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
21.1 The Contractor shall bring to Site all materials, including construction equipment, tools and tackles for the
purpose of the works under intimation to the Engineer. All such goods shall, from the time of their being
brought vest in the Owner, but may be used for the purpose of the works only and shall not on any account
be removed or taken away by the Contractor without the written permission of the Engineer. The Contractor
shall nevertheless be solely liable and responsible for any loss or destruction thereof and damage thereto.
21.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or owing
to him by the Contractor, under, in respect of or by reasons of the Contract. After giving a fifteen (15) days
notice in writing of his intention to do so, the Owner shall be at liberty to sell and dispose off any such
goods, in such manner as he shall think fit and to apply the proceeds in or towards the satisfaction of such
sum or sums due as aforesaid.
21.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of the
Engineer the materials such as construction equipment, erection tools and tackles, scaffolding etc. with the
written permission of the Engineer.
22.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
22.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner and the
employees of other Contractors and Sub-Contractors and all public and private property.
23.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and Conditions
of Contract of this Volume-I, the following provisions will also apply to the portion of works to be done
beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
23.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against claims
for injury, disability, disease or death of his or his Sub-Contractor’s employee, which for any reason are not
covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s : As per statutory
Compensation Provisions
Employee’s : As per statutory
Liability Provisions
23.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease or
death of members of public or damage to property of others, due to any act of omission on the part of the
Contractor, his agents, his employees, his representatives and Sub-Contractors or from riots, strikes and
civil commotion.
23.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-Contractors,
his agents and his employees have to perform work pursuant to the Contract.
23.5 The above are only illustrative list of insurance covers normally required and it will be the responsibility of
the Contractors to maintain all necessary insurance coverage to the extent both in time and amount to take
care of all his liabilities either direct or indirect, in pursuance of the Contract.
24.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed without
subjecting the equipment and materials to adverse effects during inclement weather conditions, like
monsoon, storms etc. and during other unfavorable construction conditions. No field activities shall be
performed by the Contractor under conditions, which might adversely affect the quality and efficiency
thereof, unless special precautions or measures are taken by the Contractor in a proper and satisfactory
manner in the performance of such Works and with the concurrence of the Engineer. Such unfavorable
construction conditions will in no way relieve the Contractor of his responsibility to perform the Works as
per the schedule.
25.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may come
across during the course of performance of his Works either during excavation or elsewhere, are properly
protected and handed over to the Engineer. Similarly, the Contractor shall ensure that the bench marks,
reference points, etc, which are marked either with the help of Engineer or by the Engineer shall not be
disturbed in any way during the performance of his Works. If any work is to be performed which disturbs
such reference the same shall be done only after these are transferred to other suitable locations under
the direction of the Engineer. The Contractor shall provide all necessary materials and assistance for such
relocation of reference points etc.
26.0 WORK & SAFETY REGULATIONS
26.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment belonging to
him or to GETCO or to others, working at the Site. The Contractor shall also be responsible for provision
of all safety notices and safety equipment required both by the relevant legislations and the Engineer, as
he may deem necessary.
26.2 All equipment used in construction and erection by Contractor shall meet Indian/International Standards
and where such standards do not exist, the Contractor shall ensure these to be absolutely safe. All
equipment shall be strictly operated and maintained by the Contractor in accordance with manufacturer’s
Operation Manual and safety instructions and as per Guidelines/rules of GETCO in this regard.
26.3 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out in
accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and associated
Laws/Rules in force from time to time. A register of such examinations and tests shall be properly
maintained by the Contractor and will be promptly produced as and when desired by the Engineer or by
the person authorized by him.
26.4 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
26.5 The Contractor shall provide safe working conditions to all workmen and employees at the Site including
safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be erected under the
control and supervision of an experienced and competent person. For erection, good and standard quality
of material only shall be used by the Contractor.
26.6 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment belonging
to the Owner or other Contractors under any circumstances, whatsoever, unless expressly permitted in
writing by GETCO to handle such fuses, wiring or electrical equipment
26.7 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other
Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be connected.
26.8 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall be
an earthed metal sheath surrounding the cores.
26.9 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No weight of
any description will be imposed on any cable and no ladder or similar equipment will rest against or attached
26.10 No repair work shall be carried out on any live equipment. The equipment must be declared safe by the
Engineer and a permit to work shall be issued by the Engineer before any repair work is carried out by the
Contractor. While working on electric lines/equipment, whether live or dead, suitable type and sufficient
quantity of tools will have to he provided by the Contractor to electricians/workmen/officers.
26.11 In case any accident occurs during the construction/ erection or other associated activities undertaken by
the Contractor thereby causing any minor or major or fatal injury to his employees due to any reason,
whatsoever, it shall be the responsibility of the Contractor to promptly inform the same to the Engineer in
prescribed form and also to all the authorities envisaged under the applicable laws.
26.12 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is being
carried out in such a way that it may cause accidents and endanger the safety of the persons and/or
property, and/or equipment. In such cases, the Contractor shall be informed in writing about the nature of
hazards and possible injury/accident and he shall comply to remove shortcomings promptly. The Contractor
after stopping the specific work can, if felt necessary, appeal against the order of stoppage of work to the
Engineer within 3 days of such stoppage of work and decision of the Engineer in this respect shall be
conclusive and binding on the Contractor.
26.13 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to safety
reasons as provided in Para 31.18 above and the period of such stoppage of work will not be taken as an
extension of time for completion of work and will not be the ground for waiver of levy of liquidated damages.
26.14 It is mandatory for the Contractor to observe during the execution of the works, requirements of Safety
Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so as to
enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper introduction as
to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire prone
areas and adequate fire-fighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient first aid to
e) Requirements of ventilation in underwater working to licensed and experienced divers, use of gum
boots for working in slushy or in inundated conditions are essential requirements to be fulfilled.
26.15 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable laws
pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from time to
time without any demur, protest or contest or reservations. In case of any discrepancy between statutory
requirement and GETCO Safety Rules referred above, the latter shall be binding on the Contractor unless
the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1, 00,000 + day plus applicable taxes ( if any) These are applicable
Causing death per person: for death
b. Major injuries or accident causing Rs.20,000+ day plus applicable taxes ( if any) injury to any
25% or more permanent disablement per person whosoever.
to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and rules framed
there under or any other applicable laws as applicable from time to time. In case the Owner is made to pay
such compensation then the Contractor is liable to reimburse the Owner such amount in addition to the
compensation indicated above.
27.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment shall be
in accordance with the relevant Codes and accepted good engineering practice, the Engineer’s drawings
and other applicable Indian recognized codes and laws and regulation of the Government of India.
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars :
This part of the Bid Document relates to certain specific/special terms and conditions particular to the
Contract. The provisions herein are to be read and understood in conjunction with the relevant provisions
elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC) and Erection
Conditions of Contract (ECC). The intent of provisions herein are specific to this contract and are, in
general, supplementary to related provisions under ITB,GCC and ECC. However, in certain provisions
which are contrary to those in ITB, GCC and ECC, the provisions in these Special Conditions of Contract
2.0 Tender Fee/ Earnest Money Deposit (EMD) :
Bidders shall compulsorily pay tender fee and EMD through RTGS/NEFT only.
a) Payment of Tender fee / Earnest Money Deposit ( EMD ) can be accepted by RTGS/ NEFT.
For payment through RTGS/NEFT the scan copies of payment made (transaction slip of payment made)
shall be uploaded online with the Tender documents on n-procure portal.
1. Bidder has to provide following detail on the same date of payment made so that receipt can be
generated at below mentioned e-mail ids:
Sr. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3. GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
2.1 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would warrant
the guarantee forfeiture, pursuant to relevant para elsewhere The bid guarantee shall be made payable
to the Owner without any condition whatsoever.
2.2 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-responsive. No
exemptions are made in the furnishing of the security.
2.3 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three months
from the date of submission of tender.
2.4 The successful bidders, Bid Security will be discharged upon, furnishing the contract Performance guarantee
2.5 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid Form:
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies within thirty
days of letter of award of contract)
2.6 Bidders are requested to pay an earnest money deposit by RTGS/NEFT. Banker’s cheque / demand
draft shall not be accepted.
2.7 Tenders no accompanied by EMD shall be rejected.
2.8 If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the EMD shall be
forfeited and the tenderer may be disqualified from tendering for future works of GETCO.
2.9 The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned to the
successful tenderer after he furnishes the Security Deposit for performance and duly enters into the
contract. If he fails to furnish the SD or to execute the contract for the work offered to him, his EMD
shall be forfeited and the tenderer may be disqualified from tendering for further works for GETCO.
3.0 Validity period: The offers should be valid for minimum period of 180 Days from date of opening of tender
(Technical Bid).
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the
5.0 Qualifying Requirement: As mentioned in Qualifying requirement. Bidder shall have to upload scanned
copies of original (Notarized/ self-attested copies of original-as specified in QR) online through n-
6.0 SCOPE OF WORK: As mentioned in Qualifying Requirement.
7.0 Price Inclusions (including Taxes & Duties):
7.1 Goods & Service tax (GST): GST & Cess as applicable shall be payable/receivable as mentioned in
clause 12 of ITB.
7.2 The prices quoted shall be all inclusive of freight, transportation, loading, –unloading & stacking at site of
materials supplied by Contractor as well as owner supplied item if any.
7.3 No extra payment toward any type of templates including extension & special tower and erection tools
/materials will be made.
7.4 Evaluation of the tender shall be carried out on end cost basis.
7.5 Statutory Variations:
Any statutory increase or decrease in the taxes and duties subsequent to your offer if it takes place within
the original contractual delivery date will be to the GETCO’s account subject to the claim being supported
by documentary evidence.However, if any decrease takes place after the contractual delivery date, the
advantage will have to be passed on to the GETCO.
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision of
Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.7 Welfare Cess:-
1. As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects, and
civil works.The welfare cess @ 1% shall be paid by the contractor and the same shall be reimbursed
by employer on production of documentary evidence of payment.
2. Contractor shall get registered under Welfare Cess Act before commencement of work in required head
as per nature of work. Office of the Factory Inspector is authorized at present as a registering authority.
3. GETCO shall pay the welfare cess by way of reimbursing to contractors on production of documentary
evidence of payment. Registration charges will not be reimbursed.
4. The contracts for which supply or part supply of material are in the scope of GETCO, then contractors
shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive basis of
utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to the
contractor on receipt of request letter along with documentary evidence of payment. For calculation of
welfare cess on supply part, valuation as per MR shall be taken and informed to the contractor for
payment. This will be over and above the A/T value. The modality of payment/ reimbursement of welfare
cess will be as under.
5. On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit
the documentary evidence to the concern office. Copy of Registration certificate shall be submitted
before submission of 1st RA bill
6. Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
7. Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
8. The welfare cess shall be reimbursed to the contractor on submission of copy of documentary evidence
of payment by observing due formalities.
9. The Welfare cess @1% is not considered in the estimate for this project & therefore , bidders are
8.0 SECURITY DEPOSIT-CUM-PERFORMANCE GUARANTEE DEPOSIT
8.1 The successful bidder has to pay 100 % security deposit (5% of the Contract) upon placement of
LOI within 10 days.
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as a
Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable either in
BG/DD payable at Vadodara. Bank guarantees from following Banks will be acceptable.
(A) Guarantees issued by the following Banks will be accepted as SD on permanent basis.
1. All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to March
2027. The validity cut-off date in the GR is with respect to date of issue of Bank Guarantee irrespective
of date of termination of Bank Guarantee.1.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagrik Sahkari Bank Ltd
31. Saraswat Co-Operative Bank Ltd
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
38. The Baroda CentraI Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-operative Bank
42. The Banaskantha Mercanttile Co-op. Bank
43. Gujarat Gramin Bank
8.3 No interest will be allowed on amount of Security deposit.
8.4 The Security Deposit - total shall be kept deposited up to 24 months from the date of charging of line. The
same shall be released on receipt of N.O.C. from the concerned EE(const./ AM).
8.5 You shall have to keep contract alive and its solely your responsibility to renew the SD cum performance
bank guarantee towards execution of contract at least one month prior to date of expiry.In case of such
extension of bank guarantee towards execution of contract the same shall be duly
acknowledged,separately
8.6 This security deposit is for the performance of contract and the same is liable to be forfeited by the GETCO
in event of non fulfillment of the terms and conditions of this contract by the contractor.
8.7 Corporate Guarantees are not admissible.
8.8 The ‘Signing of Contract ‘and ‘Contract Agreements’ will be done as per prevalent GETCO Terms and
8.9 A/T shall be issued on receipt of Bank Guarantees, contract agreement & Indemnity Bond within 30 days
of issue of LOI
8.10 The SD cum performance bank guarantee towards execution of contract will be returned only on successful
execution of guarantee period ( 24 months from date of charging line) of the contract
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in materials, poor
workmanship or defect/ wrong design etc. for a period of 24 months from date of charging line.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in work execution beyond Contractual cutoff date stated as per
stipulated delivery period shall be subject to the penalty at the rate of ½ % of the delayed work value plus
applicable taxes (if any) per week or part thereof, with a ceiling of 10 % of the total contract value plus
applicable taxes (if any).
10.2 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be entitled
to deduct the amount of Penalty for delay from the amounts payable to the Contractors under any bills
raised under this contract or any other contract with the GUVNL and its Subsidiary Companies i.e. GETCO,
GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to adjust the amount
of Penalty of delay against any Bank Guarantee furnished by the Contractor under this contract or any
other contract with GUVNL and/or its subsidiary companies.
10.3 The penalty will be deducted from bills payable either against this contract or from any Bank Guarantee or
any other amount payable under any other contract with the GETCO.
11.0 COMPLETION PERIOD
11.1 Overall Completion period for this Contract will be 24 Months from the date of commencement .The date
of issue of the work order is the date of commencement of the Bi-annual rate contract, failing which the
penalty ½% per week plus Taxes (if any) as Applicable or Part thereof on delayed portion of work
and / or supply value subject to ceiling of 10% plus Taxes (if any) as applicable of the total contract
value will be imposed.
Work under subjected rate contract shall be carried out at any location under Jambuva Circle as per
instruction of EIC.
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
11.3 Contractor shall have to arrange man power / tools tackles for work execution within 12 hours from the
date of receipt of instructions or intimation through e -mail / telephone from concerened division office /
circle office and each job work shall be completed within 10 Days or at the earliest looking to the emergency
nature of work.MOM & BOQ shall be submitted by field office / Division offce for initialization of process for
issuance of sub order by Division office / Circle office.Work shall be completed at the earliest looking to the
emergency nature of work
11.5 There might be possibility of more than one incident / emergency arise at same point of time like in cyclone,
moonsoon season etc.In that case, successuful contractor shall have to take prompt action to start the
restoration work simultaneously at each fault location / site by arranging gang /man power with tools
tackels at the earliest.
11.6 if required, the Bi-annual rate contract may be extended for the period of further one year with mutual
understanding with the same rate and terms and condition.Also, if amount remains pending in Bi-annual
rate contract extension may be given up to completion of amount with mutual understanding
11.7 The time limit for the work may be reduced and contractor should make all his efforts to complete the work
within stipulated time limit as may be given by the Engineer in charge depending upon emergency of work,
GETCO reserves the right to reduce the time limit without giving any notice.
11.8 The completion date will be deemed to be the date on which all works on the Contract are demonstrated
to be complete to the satisfaction of the GETCO/Engineer and is complete in all respects as per the terms
and conditions of this Contract.
12.0 Presentation of Bills:
12.1 For Erection: Monthly R.A Bills for erection 90% value of work executed in original with one copy
shall be submitted to concerned EE( AM) for passing and processing for payment.
12.2 Balance 10% payment for erection shall be released only after finalization of material account and
passing of final bill .The contractor has to submit the final bill along with the material consumption
statement and other required data of the work carried out within 3 months from the date of completion
of work to concerned EE.
12.3 All the bills in accordance with the above clauses must be submitted with the following information:
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the
respective RA bill shall be withheld and shall only be released at the time of final bill.
12.5 The R.A. Bill shall be submitted to concern Executive Engineer ( AM) of Asset Management Division
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of work.
13.1 For erection works.
(i) 90% payment of amount claimed covering various activities such as fault finding and attending ,cable laying,
St. Joint, end termination etc against R.A. bills duly certified by EIC within 30 days from the date of R.A.
bill. However, the amount to be considered for payment shall be after deduction of GST as applicable.
(ii) Balance 10% of erection value shall be paid within 30 days against commissioning of 66 KV cable
line only after settlement of material account statement of items supplied, used, erected and successful
commissioning of 66 kv cable line & the same amount will be released in final bill only and payment will be
made only after passing of final bill. However, the amount to be considered for payment shall be after
deduction of GST as applicable.
(iii) net payable amount is more than Rs 10.00 Lacs, payment will be released from circle office/corporate
office. The payment will be made by RTGS/NIFT only
(iv) As the existing contract is inclusive of GST as applicable, GST as applicable will be deducted from R.A.
Bills and same shall be released only after production of proof of the payment of GST. However, concerned
contractor has to submit undertaking on its letter head regarding the category of service under which they
are providing the service and constitution of their organization i.e. company or noncompany. If GETCO is
liable to pay GST as receiver of specified services then GETCO will pay the portion of GST at applicable
rate at which it is liable to pay as a service receiver and remaining amount of GST shall be reimbursed to
the contractor on production of proof of the same at applicable rate.
The RA bill payment shall be made by concerned EE ( AM ) within 30 days on completion of the job and
production of sub order along with work completion certificate of the Line / Sub-Station In charge to the
respective division, after following the procedures of GETCO.
Final bill payment shall be made by concerned AM Division after passing of final bill from Circle office.
Payment shall be made through RTGS only.
PAYMENT TERMS UNDER MSME ACT:
(1) You have to update your MSME detail on GETCO’s website by following link
https://getco.co.in/msme/ (and intimate to concern bill submitting office with copy to this office).
(2) The payment will be made within 45 days from the *date of acceptance or the **date of as deemed
acceptance of goods or services i.s After submission of all required documents as per at terms &
time to time circular issued by GETCO’s corporate office as well as statutory requirement to
process the bill.
14.0 The contractor will have to give indemnity bond on Non-judicial Stamp paper of value Rs. 300/-to GETCO
for material as per attached format. The cost of stamp paper will be born by the contractor.
15.0 Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our Circle
office Jambuva before commencement of works as per GETCO’s prescribed Performa. The cost of stamp
paper will be born by the contractor.
16.0 The contractor will have to give safety cum indemnity on Non-judicial Stamp paper of value Rs. 300/- to
GETCO against any possible claim of compensation for damage to contractor’s staff or any of third party
during the execution of work. The cost of stamp paper will be born by the contractor.
17.0 SAFETY CLAUSE
The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable laws
pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from time to
time without any demur, protest or contest or reservations. In case of any discrepancy between statutory
requirement and GETCO Safety Rules referred above, the latter shall be binding on the Contractor unless
the statutory provisions are more stringent.
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of agency or outsider
due to negligence or non-compliance of GETCO safety norms then in addition to the compensation
and liability as per statutory requirement, contractor / agency shall be penalized as under:
Sr. No Amount of Contract in Rs. Penalty amount
Rs.5000/- plus applicable taxes (if
Rs.40000/- plus applicable taxes (if
2 Above1 Lac to 10 Lacs
Rs.100,000/- plus applicable taxes (if
3 10 to 100 Lacs
4 > 100 Lacs 1.0 % plus applicable taxes (if any)
1. The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of fatal/Non-
fatal accident occurred to human being.
2. The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3. Safety Requirement:
i) Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s site in
charge and supervisor. Safety document shall be handed over and vital safety norms and key points
of safety related to project shall be explained and recorded for commitment by erection contractor.
Such records are mandatory for clearing first erection bill.
ii) During site visit by GETCO official of Executive Engineer and above rank, the following checks during
execution of work shall be covered.
I. Safety equipment available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
II. Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
III. T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
iii) If above-mentioned safety requirements found violated in any of the above three conditions shall attract
penalty of Rs.1000/- plus applicable taxes (if any) per occasion. (Max.Rs.3000/--for violation of three
iv) During subsequent visit, if violation is found, then double penalty applicable taxes (if any) shall be
deducted from the bill of the Contractor/Agency.
18.0 As built Tower Schedule :
The contractor must furnish the as built tower schedule as per prescribed format at Annexure-B
within 15 days from the date of test charge or commissioning of the line to E.I.C.
GENERAL CONDITION
A. GENERAL TERMS :-
1. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or any tender.
The Superintending Engineer ,Jambuva reserves the right to reject any or all tender without signing any
reasons whatsoever and decision of the The Superintending Engineer ,Jambuva will be final and
unchallengeable.
2. In case of any dispute / doubt, the decision of The Superintending Engineer- Jambuva, shall be
unchallengeable, final and binding to the Contractor.
3. Tender offer without payment of E.M.D/Tender Fee, required Certificate, Documents, , blank tender etc.
required for execution of job will be out rightly rejected. The tenderer should furnish details of past experience
of such job of similar nature completed by him satisfactorily within the time limit in GETCO without this certificate
offer shall be rejected out rightly.
4. The competent authority can delete any items in schedule of the tender, if he feels that the rate quoted by
contractor act. That item is abnormally high completed to the estimated rates. Specification in any items
mentioned in tender are subject to change without any prior notice and binding to the Contractor.
B. GENERAL TERMS FOR CONTRACTOR :-
1. The erection work should be carried out according to the specification and as per Instructions & programmed
laid out by the DE / Executive Engineer-in-charge of the work. Contractor has to co-ordinate E.I.C. of planning
of outage & work schedule thereof, so as to complete all the planned work in outage. Contractor has to deploy
adequate manpower accordingly.
2. The contractor should appoint supervisor with sufficient qualification and experience who could supervise the
execution of work throughout. He should always be present on the site as far as possible. Qualification &
experience certificate of deputed supervisor to be submitted to GETCO.
3. The erection work should be commenced immediately from the date of receipt of instructions from office and
should be completed within thereafter. Prior intimation in writing for starting the job will be given by GETCO for
4. The Contractor has to follow all IE rules, Insurance rules, GETCO rules labours laws, safety rules and
regulations at his risk & cost.
5. The GETCO does not take any responsibility in case of accident or injury to the workers. The safety / security
of men, materials & equipments shall be sole responsibility of the contractor. Contractor will abide by and fulfill
all the terms and conditions and general terms and condition of the contract for works available in the office.
All other general terms and conditions as prevailing in the GETCO shall be applicable to this contract. The
contractor will be governed by the GETCO’s general conditions of works contract. The Booklet will be available
in the concerned office in any working days. In the event of placing order, the contractor will have to sign this
booklet along with other documents and agreement. All the usual terms and conditions of the GETCO, though
the same might have not been mentioned in this specification or contractor booklet will applicable to this
contract, and the decision of the Executive Engineer (AM), of Concern Division shall be binding on the
6. The bidder shall have the experience of similar nature of UG cable line work as mentioned in
Technical/Commercial Bid..
7. The tenderer should quote for complete erection work, testing and commissioning of UG cable line as indicated
in the Schedule “B” and as per terms and conditions.
8. It will be bidder sole responsibility for erection of complete the work in all respect, accordance with latest rules
under Electricity Act and approved by Electrical Inspector.
9. Above terms and conditions are part and partial of tender and will be observed
10. The Contractors has to engage required strength of skilled persons for restoration work of Transmission line
and proper Supervisor to avoid complication & unnecessary delay to complete work. The Contractor will be
totally responsible for labour claims arising out of the labour employed for this job.
11. The detailed drawings of equipments can be seen from concern GETCO office during any working day and the
equipments which are to be erected can also be seen physically at GETCO store during any working day and
12. Contractor has to ensure safe shifting and erection of all accessories / equipments as per standard norms.
13. The Contractor has to arrange for minor fabrication (if required) at free cost. The tender includes all minor
accessories and items of work which may not have been specifically mentioned in the specification schedule
etc. but are essential for completion of work. The contractor will not be eligible for any extra payment in respect
of such minor accessories and items of work.
14. The contractor has to co-ordinate & co-operate fully with Engineer-in-Charge and commissioning Engineer of
the supplier for erection of all equipments / structure / accessories, etc., and any other items which are not
conveniently included in the specification but requires for completing the job.
15. The Contractor has to remain in contact in close days with Engineer in charge of work who in turn shall issue
detailed instruction for the commencement of the work.
16. The Contractor will be solely and responsible for any accident / damage either to equipments or any human
being during the time of execution of work.
17. Either you or your authorized person should contact our concern EIC as well Concern Division. office,daily,
for the availability of material required for this work, failing to which this work order shall be terminated without
giving any notice.
18. The Contractor will have to give indemnity bond to GETCO against any possible claim of compensation for
damage to contractor’s equipments or staff or any of third party during the execution of work.
19. The Contractor will have to complete entire job as per directive and instruction of Engineer in charge. If he fails
to do so entire work will be carried out at Contractor’s risk and cost.
20. The contractor has the experience of survey work and produces the list of survey instrument and bio-data of
Supervisor / Surveyor / Engineer / Technician to be engaged for the job.
21. If the work is required to be carried out during specified outage then the contractor has to deploy
adequate man power, material, tools etc. well advance and has to complete the entire work during this
specific outage period only, failing to which GETCO shall be at liberally to deduct the amount of
revenue loss due to prolong outage. Contractor has to co-ordinate E.I.C. of planning of outage & work
schedule thereof, so as to complete all the planned work in outage.
22. If required by GETCO you shall have to provide free to & for traveling facility to our field Engineer or Surveyor
23. The Contractor shall not refuse to execute the work order at any time and it will be his sole responsibility to
execute and complete this work as per the instruction of Engineer - in - charge.
24. The tender shall invariably furnish a monthly average erection capacity (in km. and rating) along with list of
available machinery, tools and tackles etc. for erection of line.
25. No subcontractor, Power of Attorney shall be allowed.
26. Any excess work done beyond specification and drawing shall be at Contractor’s risk and cost.
27. The bidder shall specifically note that GETCO will not pay any extra amount to wards any type of claim except
for the description indicated in Schedule “B’. The party has to carry out all other / additional required activities
/ work as directed by Engineer in charge which is not mentioned in Schedule but required to be completed as
per the site condition and for this work no extra Payment shall be made by GETCO.
28. In addition to the general of the construction particular attention shall be paid to the final finish and every effort
shall be made to have the entire work contented wish standard of workmanship by the Contractor.
29. No any idling / gang mobilization charge will be paid by GETCO in any circumstances.
30. No part rate or reduces rate shall be allowed in final bill.
31. The interpretation of specification doubts etc: - In case of any doubts about what is mentioned in
specification or schedule or elsewhere, the tenderer should get all doubts cleared from the Department in
writing and in advance of filling in the tender. In case of difference of opinion about interpretation of specification
etc. the decision of Ex. Engineer (AM) /SE will be final and shall be binding to the contractor to the tenderer.
32. Power supply should be arranged by contractor at his own cost. For that temporary connection to be obtain by
contractor from MGVCL for the said work.
33. In case of any objection / ROW, contractor has to mobilize his all efforts to clear the objection in consultation
with GETCO authority. No extra Charge will be paid for such effort.
34. The contactor shall co-operative with the GETCO in recording measurement etc. as expeditiously as possible
and he shall fulfill all the requirement which are necessary to finalizes the accounts on the basic of its records
and pay him such amounts as if found due to him, together with the amount of security deposit if any remaining
payable to him after deduction there from the amount due by him to the GETCO. The GETCO shall not entertain
further claim from thereafter.
35. GETCO shall deduct the Income - Tax & Taxes as per prevailing rules from each and every bill.
36. The contractor will not be eligible for any extra payment in respect of minor accessories and items of work.
37. RETURN OF EMPTY CABLE DRUMS: The empty CABLE drum shall be required to be returned back by the
contractor to the GETCO stores.
38. ACCOUNTING OF GETCO MATERIALS: - The contractor will be fully answerable and responsible for all the
material issued to him for the work by the GETCO for any theft, loss of pilferage and shall have to furnish
account for the same after completion of the work and before preparation of final bill, If the loss referred to
above is not made good before final bill as per rules of the GETCO. Contractor has to maintain Site Register
Material Account Register regularly.
39. The structure & equipment required for line erection work shall be delivered at central store by GETCO at free
of cost and it must be shifted to site without damaging the equipment must be kept in position as per instruction
of In charge Engineer and Manufacturer’s manual. The M.S. Girder required for line erection work will be
provided at one end of the line by GETCO. The trip of Girder should be of minimum 20 Girders.
40. The Contract has to shift the material at site with packing and it shall be open carefully without damaging the
equipment/ material. The material shall be stacked as directed by Engineer-in-charge.
41. The equipments / material must be cleaned, washed if required before erection. The initial testing wherever
required should be carried out first with the help of Engineer-in-charge before erection, such as measuring
continuity test or any other test found necessary.
42. THE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. shall supply Steel Section required, for
earth mesh / structure / G.I. / M.S. strip for earthings the equipments structures with nut and bolts, power
cable, control cable, L.T. cable, Clamps connectors and C.I. Plate for small pit etc. at free of cost subject to
condition mentioned in schedule-B.
43. Wooden charcoal, salt, black cotton soil, G.I. pipe, G.I. strip, G.I. wire, nut & bolts lugs etc. required for earthing
shall be procured by the contractor as per specification given is Schedule B.
44. Contractor will fully and solely responsible for any shortage, damage, leakages to the equipments or any it’s
accessories that may occur during transportation dragging, draining of oil, erection work etc.
45. In case of non - availability of some items / materials contractor shall have to collect the same from other nearby
store center of GETCO.
46. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you to the
respective center of the GETCO as per instruction of Engineer in charge at your cost.
47. All the materials issued by GETCO shall be transported to the work site on same day and to be preserved in
safe custody failing to which GETCO shall initiate Police actions, similarly as per instruction of Engineer-in-
charge, you have to credit the material at GETCO store without any loss of time failing to which GETCO shall
initiate Police action.
48. Accounts of Materials issued :- The contractor shall have to maintain accurate day to day and item wise
account of use of issued materials which shall be got checked from time to time by the representative of the
GETCO. The contractor will be responsible for custody and preserving the issued materials till the work is
handover by the Contractor after completion.
49. The contractor has to maintain site Register, covering all the daily details of Material receipt & utilization,
progress of work etc. This register shall be checked and signed by Engineer in charge during the site visit
1. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.
2. No special tools and tackles such as compression joint machine, jointing dies etc. will be given by GETCO.
3. Erection tools required during construction of lines shall be arranged by the contractor at his own cost.
4. Contractor will have to make his own arrangement for all tools, tackles required to complete work
5. The contractor has to submit the list of tools, tackles, equipments with him along with his tender offer. The
tender without this list and other required documents (as mentioned above herein the tender) should be
rejected out rightly.
52. ELECTRICITY RULES : All works shall be carried out in accordance with the revised and latest providing
under Indian Electricity Act and Rules made the rounder.
53. INSPECTION BY GETCO REPRESENTATIVES:The Engineer-in-charge, higher authority of GETCO or his
representatives will be free to visit the contractor’s work, their stores site and erection sites and also verify the
GETCO’s materials in the custody of the contractor as and when required.
GENERAL INFORMATION (TECHNICAL) :
1.1. CODES, STANDARDS & REGULATIONS
The erection and testing of the 66 KV cable, accessories & material to be supplied by owner, shall comply with
latest revisions of relevant Indian Standards or equivalent IEC standards.
In addition, the Indian Electricity Rules, Electricity Act 2003,Statutory requirements of Central Govt., GERC and
State Government of Gujarat( applicable codes), shall also be complied with. Any complications arising out of it will
be set right by the bidder without any implication to Corporation.
The bidder shall submit his offer as per information given in submission of tender.
1.2. TEST AND INSPECTION FOR INDIVIDUAL ITEM
Site tests shall be carried out as per appropriate IS/IEC. The bidder shall make reasonable facilities, at his cost for
inspection and testing of the 66 KV cable line by GETCO’s Officials. Inspection and tests do not relieve the bidder
of his contractual obligations regarding performance of the equipment at site/in actual use.
1.3. FUNCTIONAL AND COMPOSITE TESTING
Following test shall be conducted on equipment after completion of erection in the presence of Engineer -in-charge
from point of view of completeness in the presence of GETCO’s Authorized Representative.
Visual inspection of total system.
Checking of continuity of power cables.
Checking of insulation.
Verification and measurement of earthing resistance.
Checking of cable terminations and laying, dressing etc.
Checking of safe accessibility of components.
The insulation resistance test shall be carried out
All tests as specified in Technical Specification Part –II
Identification labels shall be provided on all equipments as per client’s approval. All labels shall be engraved on
plastic (white letters with black background) and all text shall be in English language.
Any exclusion /deviation from specification shall be clearly spelt out and listed at one place only and bidder shall
substantiate the same with appropriate reasons. In the absence of clearly spelt out and mutually agreed deviation,
it shall be considered that the bidder has undertaken to comply with the technical specification totally, in letter and
The installation for the line shall include all civil works as required under tech.specification and necessary material
required to complete the Installation. It may be noted that civil works details should be got approved from GETCO.
For installation work at site, the bidder shall be fully responsible for arranging the supply of required tools and
tackles, welding sets, pipe bending machine, cable crimping tools, labours, scaffolding, ladders, etc.
Bidder has to arrange for water by pipeline or by water tankers or by drilling bore if required at his cost.
On completion of the installation but before energizing the system, all installation shall be physically checked and
properly tested. These checks and tests shall be conducted by the bidder under the supervision of Engineer In-
charge and bidder shall furnish the final status and test results shall be made good by the bidder free of cost within
contract completion period.
All clamps, brackets, bolts, nuts, screws, markers, ferrules, lugs and glands and other hardware necessary for
erection work, shall be included in the scope of work and shall be arranged by the bidder.
1.5 INSPECTION AND TESTING
Any inspection by the GETCO’s Authorized Representative does not relieve the Bidder from his responsibility of
quality assurance and quality control functions.
1.6 OTHER CONDITIONS
Any clarification / amendment necessary, in any or more clauses incorporated in the present A/T, you will have to
make a detailed reference to the GETCO latest within ten days from the receipt of A/T. If you fail to do so, no
request for any clarification / amendment shall be considered thereafter. Please also note that all the points which
need clarification / amendment should be brought out at once. No piecemeal clarification/amendment will be
1.7 The agency should produce the documents for technical knowhow for carrying out 66 kV termination.
Necessary technical back up from the termination kit manufactures shall be furnished along with tender.
1.8 Instructions before submitting your bid.
1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in AutoCAD format shall be submitted
by successful bidder. Also the hard copies as per specification shall be submitted.
2. The bidder shall submit Field Quality Plan (FQP) with the technical bid.
3. Please note that the evaluation will be carried out on the strength of content of bid only. No further
correspondence will be made.
4. It is mandatory to quote all the items.
5. Evaluation of the tender shall be carried out on end cost basis considering all the items mentioned in price
6. Cable remains in air is not part of U/g cable laying. However, it is to be covered under the part of terminations
on tower/H frame/ respective substation area.
7. The bidder shall bring out all the technical deviation/s only at the specified annexure.
8. Preparing of Erection Key Diagram (EKD) indicating all the quantity required for successful erections, testing
and commissioning of line is in Bidders scope.
9. For all straight joints, contractor has to provide B.B. masonry chambers as per instruction of engineer in charge
and drawing provided in tender.
10. Successful bidder has to work anywhere in Gujarat ( Jambuva Circle OR another nearby Circle in case of
emergency) and any length of cable line.
11. In entire cable trench, RCC precast slab of size 600 x 300 x 50 mm is to be provided on both the side & upper
side of 1C x 300mm2 power cable for protection purpose as shown in drawing.
12. Except substation end, Earthing as per GETCO standard and approved SVL calculations shall be provided at
earthlink boxes. Further, wherever, 66KV cable is to be terminated on tower, 03 nos. of additional 66KV LA
earthings are to be provided. These earthings are part of scope without any additional cost to GETCO.
13. Line wise detail release order & commencement date will be issued separately for subjected work
14. Specification for 1C x 300 & 630 mm 2& coaxial power cable is kept here with for reference.
15. Please refer specification of end termination, Straight through Joint, Link box with or without SVL for providing
& fixing arrangement.
16. The detail scheme with SVL calculations shall be get approved from Engg. dept for quantity of Link Box
with/without SVL, MidPoint Joints and Cross Bonding Joints before execution.
17. The straight through joints, end terminations, mid span bonding/cross bonding joints shall be get inspected and
must be cleared from quality department before dispatch.
18. It will be necessary for the successful Bidder to arrange technical supervision during installation of cable laying
and termination.
19. The successful Bidder shall arrange for the services of fully qualified and competent supervising Engineer /
Engineers and necessary minimum number of jointers, semi-skilled labourers, as he deems it absolutely
20. Provision of special tools / appliances required for conductor jointing and stripping / dressing and application of
XLPE insulation etc. shall be made by the successful Bidder.
21. The successful Bidder shall furnish all necessary information, including drawings, manuals and instructions
relating to both cable laying and jointing practice.
22. The associated civil works, which are necessary in laying / installation of power cable, though not specifically
mentioned, but shall be completely in the scope of successful Bidder.
23. No idling charges or cost over run for the entire project shall be entertained.
24. The cables shall be completely surrounded by a layer of having a low thermal resistivity (selected sand) sand
about 350 mm over & 150 mm below of the cable surface throughout width of the cable trench at no extra cost.
( River sand shall be allowed for surrounding layer)
25. Wherever it is required to cross the cable through Railways/Highways(Roads)/Nala/Canal/Gas lines/ W ater
supply & sewerage lines etc.; the bidder has to carry out the excavation as per the requirement of respective
department ensuring full safety. The depth of the excavation may vary with respect to different utilities. For all
above requirement, bidder should not claim any extra money on account of deep excavation.
26. The successful bidder has to execute the Safety-Cum-Indemnity Bond on Rs. 300/-recent stamp paper and it
shall be binding to the bidder till completion of contract.
27. The successful bidder has to execute the earthing in all type of soil as per technical requirement and i.e. for
normal as well as for rocky soil as per instruction of Engineer Incharge without extra cost to GETCO.
28. GETCO will provide 66KV cable Poly AL or Al. corrugated sheath construction as per availability, 6.6KV cable
for earthing, 66KV Lightening arrester, 66KV Tower or members for conversion from A to B type towers, 66KV
DP Structures, Earthinh strips etc.. However, the bidder has to transport the same from the GETCO’s Store .
29. Laying Specifications are revised and shall be read as below: “The power cable shall be laid generally at a
depth of 1500 mm and can vary, if obstacles like power cable of other rating / telephone cable / water pipe line
etc, come in the way of installation. At least minimum Depth of 1000 mm shall be maintained from nearest road
30. Revised sectional drawings of cable laying, method of construction route marker etc. shall be considered.
31. The minimum size of route marker shall be 900X300X100mm. It shall be at least embedded in ground upto
min. 400 mm depth. Name of cable route & Sr. No. of route marker shall also be painted with non-washable
paint. Warning Board shall be made as per drawing & placed at major crossing points of cable route & at
minimum 90 Mtr. Interval, including following details: Name of route, “ GETCO 66KV Cable” & mobile no. of
concern cable owner Substations.
32. Sucssesful bidder shall have to supply standard, GETCO approved make straight through joint and outdoor
termination joint suitable for existing 66 kV 1C x 300 sq. mm OR 1C x 630 sq.mm XLPE insulated Copper wire
screened, Poly AL-Poly cable OR 66 kV 1C x 300 sq. mm OR 1C x 630 sq.mm AL Corrugated cable
GUJARAT ENERGY TRANSMISSION
CORPORATION LTD.
Sardar Patel Vidyut Bhavan, Race Course,
TECHNICAL SPECIFICATIONS
66 KV 1C 630 SQ.MM. XLPE POWER
CABLE (POLY –AL-POLY
CONSTRUCTION) FOR
UNDER GROUND LINE
GETCO/E/TS – PCBL025/R4 Jul.
TECHNICAL SPECIFICATIONS FOR 66 KV (CROSS LINKED
POLYETHYLENE INSULATED) POWER CABLE :
1.1.1 The scope under this section covers design, engineering, manufacture, testing, packing, supply of 66 KV,
Sq.mm, XLPE, insulated power cable for use with solidly grounded distribution systems.
The XLPE cable and its accessories shall be complete with all fittings and components necessary
for the satisfactory performance and ease of maintenance.
1.2 STANDARDS: Unless otherwise specified, the cables shall conform, in all respects, to IEC-502, IEC-60840
and IS: 7098 (Part-III) / 1993 with latest amendment or latest edition for cross linked polyethylene insulated
Thermoplastic High Density Polyethylene sheathed cable for working voltage of 66 KV.
1.3 CLIMATIC CONDITIONS: The climatic conditions under which the cable shall operate
satisfactorily are as follows :
a) Maximum ambient temperature of air in shade 0C :
b) Minimum ambient temperature of air in shade 0C :
c) Maximum daily average ambient temperature
d) Maximum yearly average ambient temperature 0C
e) Maximum relative humidity % :
f) Average number of the thunder storm days per annum. :
g) Average annual rainfall Cm :
h) Maximum wind pressure kg/m2 :
i) Altitudes not exceeding above MSL Meter :
j) Max. soil temp. at cable depth 0C :
k) Max. soil thermal resistivity ohm-cm :
1.4 PRINCIPAL PARAMETERS:
1.4.1 66 KV (E) grade XLPE single core power cable of single length, with H.D. aluminium conductor, shielded
with extruded semi-conducting layer, insulated with dry gas cured cross linked polyethylene (XLPE)
insulation, insulation screened with extruded semi-conducting layer followed by semi-conducting non-
woven water swellable tape, insulated core copper-wire, screened (suitable
for 31.5KA for 1 sec) tapped with a combination of semi-conducting water swellable and poly
aluminium laminated followed by black extruded Thermoplastic HDPE (Poly-ethylene) inner sheath.
Single H.D. aluminium wire armoured (suitable for 31.5KA for 1 sec) and extruded semi-conductive
layer OR graphite coated Thermoplastic HDPE outer sheathed overall cable, confirming to IEC-
60840 for construction and also confirming to IS:7098 (Part-III) / 1993 or any latest amendments
1.4.2 Outer sheathing should be designed to afford high degree of mechanical protection and should also be heat,
oil, chemicals and weather resistant. Common acid, alkalis and saline solution should not have adverse effect
on the Thermoplastic HDPE sheathing material used.
1.4.3 The cable should be suitable for laying in covered trenches and / or under ground for outdoor.
1.4.4 CABLE PARAMETERS 66 KV
i) Voltage grade (Uo/U) KV 38 /
ii) No. of cores Single
iii) Size (mm2)
iv) Nominal system voltage KV
v) Highest system voltage KV
vi) System Frequency Hz
vii) Variation in frequency 5%
viii) Fault level individually for
i) Conductor 59.22 KA / 1 Sec.
ii) Cu.screen 31.5 KA / 1 Sec.
iii) Armour 31.5 KA / 1 Sec.
ix) Maximum allowable temperature
a) Design continuous operation at rated full load current, 0C
the max. temp. of conductor shall not exceed
b) The conductor temperature after a short circuit for
1.0 sec. shall not exceed. 0C
x) Basic insulation level.
(1.2 / 50 Micro second wave)
xi) 1-min. power frequency withstand voltage 140 KV
xii) System earthing Solidly grounded
1.5 GENERAL TECHNICAL REQUIREMENTS:
1.5.1 CONDUCTOR: The cable conductor shall be made from stranded H.D. aluminium to form compact
circular shaped conductor having resistance within limits specified in IS: 8130 / 1984 and any amendment
thereof. The conductor shall confirm to IEC: 228 and the shape shall be compacted circular shaped. Nominal
diameter of individual strand & number of strands shall be selected such that calculated conductor nominal
cross section shall be 630 sq. mm.
1.5.2 CONDUCTOR SHIELD: The conductor having a semi-conducting screen shall ensure perfectly smooth
profile and avoid stress concentration. The conductor screen shall be extruded in the same operation as the
insulation; the semi-conducting polymer shall be cross-linked.
1.5.3 INSULATION: The XLPE insulation should be suitable for specified 66KV system voltage. The
manufacturing process shall ensure that insulations shall be free from voids. The insulation shall withstand
mechanical and thermal stresses under steady state and transient operating conditions. The extrusion method
should give very smooth interface between semi-conducting screen and insulation. The insulation of the cable
shall be of high standard quality, generally confirming to IEC-60840 and I.S. 7098 part-III / 1993 (latest
1.5.4 INSULATION SHIELD: To confine electrical field to the insulation, non-magnetic semi-conducting shield
shall be put over the insulation. The insulation shield shall be extruded in the same operation as the conductor
shield and the insulation by triple extrusion process. The XLPE insulation shield should be bonded type.
Metallic screening shall be provided. The metallic screen shall be of copper wire having fault current capacity
(31.5 KA for 1-sec.). Copper wires shall be followed by open helix copper tape of suitable size. Diameter of
individual copper wire, number of wires & tape size shall be selected such that calculated minimum cross
section shall be 210 sq. mm. collectively.
1.5.4a) A semi-conducting non-woven water blocking tape shall be provided over the extruded semi
conducting layer and over the copper wire metallic screen.
1.5.4 b) To avoid the ingress of moisture, poly-aluminium laminate tape shall be applied longitudinally with suitable
1.5.5 INNER-SHEATH: The sheath shall be suitable to withstand the site conditions and the desired temperature.
It should be of adequate thickness, consistent quality and free from all defects. The sheath shall be extruded
and of black Thermoplastic H.D.P.E. (Poly-ethylene).
1.5.6 ARMOUR: Single H.D. Aluminium wire armouring shall be provided. The dimension of H.D. Aluminium
wire armouring shall be as per latest IS:3975/19988. The armour shall be having fault current capacity
(31.5 KA for 1-sec.). However, diameter of armour wire shall be 3.15 mm. nominal & number of such
armour wires shall be not less than 56 in any case.
1.5.7 OUTER SHEATH: Extruded Thermoplastic HDPE outer sheath confirming to IEC: 502/1983, shall be
applied over armouring with suitable additives to prevent attack by rodents and termites. The outer sheath
shall be coated with thin layer of extruded semiconducting material OR graphite throughout the length of
1.5.8 CONSTRUCTION:
1.5.8.1 All materials used in the manufacture of cable shall be new unused and of finest quality. All materials should
comply with the applicable provision of the tests of the specification. IS, IEC, Indian Electricity Rules, Indian
Electricity Act and any other applicable statutory provisions rules and regulations.
1.5.9 CURRENT RATING: The cable will have current ratings and derating factors as per relevant standard IEC.
1.5.9.1 The one-second short circuit current rating values each for conductor, screen & armour shall be furnished and
shall be subject to the purchaser's approval.
1.5.9.2 The current ratings shall be based on maximum conductor temperature of 90 deg. C with ambient site
condition specified for continuous operation at the rated current.
1.5.10 OPERATION:
1.5.10.1 Cables shall be capable of satisfactory operation under a power supply system frequency variation of 5%
voltage variation of 10 % and combined frequency voltage variation shall be +10 % & - 15%.
1.5.10.2 Cable shall be suitable for laying in ducts or burried under ground.
1.5.10.3 Cable shall have heat and moisture resistance properties. These shall be of type and design with proven record
on transmission network service.
1.5.11 LENGTHS: The cable shall be supplied in standard drum lengths as below:
Size of cable Standard Drum length
a) 66 KV, 1C x 630 sq.mm. 700 meters 5% tolerance and
2 % overall tolerance in total quantity of cable.
1.5.12 INDENTIFICATION MARKING: Identification of cables shall be 'provided externally at three meters’
intervals to identify as under.
i) 'Name of manufacture'
ii) ‘Per meter marking’
iii) 'Year of manufacture'
iv) 'Voltage grade' to be printed / embossed at the interval of one meter-length. The identification, by printing
or embossing shall be done only on the outer sheath. Name of the purchaser shall also be embossed.
1.6.1 TYPE TESTS: The cable & accessories offered shall be fully type tested as per the relevant standards with
latest / amended / up to date IS/IEC. In case the cable & accessories of the type and design offered has already
been type tested in a Govt. recognized laboratory, the Bidder shall furnish two sets of type test Hard
Copy/Color Scan reports along with the offer. Type test reports shall not be older than TEN years and shall
be valid as on the last date of submission of bid. The purchaser reserves the right to demand repetition of
some or all the type tests in the presence of purchaser's representative. Furthermore, purchaser reserve right
to select the sample from Manuf. Works & recommend the NABL lab to carry out type tests in case of non-
submission / partial submission or type test reports of which validity is over.
These prices shall be taken into consideration for bid evaluation. For any change in the design/type
already type tested and the design/type offered against this specification, fresh Type Tests need
to be performed on offered design/type without affecting delivery schedule & no extra cost to
1.6.2 Type Tests
a) Tests on conductor:
ii) Resistance test
b) Physical test on insulation:
i) Test for thickness and dimensions of insulation
ii) Tensile strength and elongation at break
iii) Thermal ageing in air oven
iv) Hot set test
v) Shrinkage test
vi) Void and contaminants test
c) Resistivity test for semi-conducting layers
d) Test for concentric metallic screen:
i) Test for concentric copper wire
ii) Test of concentric copper tape
e) Thickness of metallic screen
f) Tests for armouring material
ii) Tensile strength and elongation at break
iii) Wrapping test
iv) Resistivity test
g) Physical tests for outer sheath:
1) Measurement of thickness
i) Carbon black content
ii) Tensile strength and elongation at break before and after aging
iii) Hot-deformation
h) Water tightness test
i) i) Thermal ageing on complete cable sample
ii) Tensile strength and elongation at break for insulation and outer sheath
iii) Resistivity test for semi-conducting layer
j) Bending test followed by P.D. test
k) Dielectric power factor and capacitance measurement at ambient
l) Dielectric power factor measurement at elevated temperature
m) Load cycle test followed by P.D. test
n) Impulse withstand test (@350 kvp) followed by HV test
o) Insulation Resistance Test (at room temperature & elevated temperature)
Important Note:
In case of non-submission / partial submission or type test reports of which validity is over, the bidder shall
submit pending type test report/s from NABL accredited laboratory, in the event of an order, before
commencement of supply without affecting delivery schedule, free of cost to GETCO. Confirmation for above
shall be invariably submitted along with technical bid.
1.6.2 ACCEPTANCE AND ROUTINE TESTS:
1.6.2.1 All acceptance and routine tests as stipulated in the IEC-60840 and IS: 7098 (Part-III) / 1993 shall be carried
out by the supplier in presence of purchaser's representative.
Sample shall be selected from offered lot, for not less than 10% (Ten percent) of nos. of cable
drums, for conducting acceptance tests after considering the next highest whole numbers.
Minimum 5% of the drums offered subject to minimum two in any lot offered for inspection shall be
subjected to length verification & physical check of outer sheath & identification markings.
1.6.2.2 Acceptance Tests
a) Conductor resistance test
b) Annealing test
c) Test for dimensions of insulation
d) Hot set test for insulation
e) Void and contaminants test
f) Test for thickness of metallic screen & PolyAl layer
g) Test for thickness of inner & outer sheath
h) Partial discharge test
i) High voltage test (30 min. on full drum as well as 4Hrs. on sample)
j) Measurement of capacitance
k) Insulation Resistance Test (at room temperature & elevated temperature)
l) Conductor Weight KG/meter (for reference Only)
1.6.2.3 Immediately after finalization of the programme of type/acceptance/routine testing, the supplier shall give
fifteen days advance intimation to the purchaser, to enable him to depute his representative for witnessing the
1.7 INSPECTION:
The inspection may be carried out by the purchaser at any stage of manufacture. The successful
Bidder shall grant free access to the purchaser's representative at any reasonable time when the
work is in progress. Inspection and acceptance of any equipments/items under this specification
by the Purchaser shall not relieve the supplier, of his obligation of furnishing equipment in
accordance with the specification and shall not prevent subsequent rejection, if the equipment/items
is found to be defective.
The supplier shall keep the purchaser informed in advance, about the manufacturing progamme,
so that arrangement can be made for inspection, without delay.
The purchaser reserves the right to insist for witnessing the acceptance/routine testing of
the bought out items.
1.8 DOCUMENTATION:
1.8.1 LIST OF DRAWINGS AND DOCUMENTS: The Bidder shall furnish two sets of following documents along
with his offer. The offer without documents shall be considered incomplete.
a) The sectional view drawing showing general constructional features of power cable with details of
materials / conductor / conductor screen / XLPE insulation / water swell able tape / HD Al.
armouring/HDPE sheath etc.
b) Literature for offered items.
c) Unpriced schedule of price bid (without prices)
d) Type test reports for the offered items in case the items have already been type tested for specified type
e) All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in AutoCAD format and
manuals in PDF format, for offered item shall be submitted. Also the hard copies as per specification
shall be submitted.
f) The bidder shall submit Quality Assurance Plan for manufacturing process and Field Quality Plan with
the technical bid.
g) All the points other than GTP, which are asked to confirm in technical specifications must be submitted
separately with the bid.
1.9 PACKING AND FORWARDING:
1.9.1 The cable shall be packed returnable steel drums suitable for vertical/horizontal transport as the case may be,
and suitable to withstand handling during transport and outdoor storage during transit. The supplier shall be
responsible for any damage to the items during transit, due to improper and inadequate packing. Wherever
necessary, proper arrangement for lifting shall be provided. Any item found short shall be replenished by
supplier without any extra cost.
1.9.2 Each consignment shall be accompanied by a detailed packing list containing the following information:
a) Name of the consignee
b) Details of consignment
d) Total weight of consignment
e) Handling and unpacking instructions
f) Bill of material indicating contents of package
1.10 TECHNICAL & GUARANTEED PARTICULARS: The Bidder shall furnish guaranteed technical
particulars as called for in appendix-I (Schedule-A) of this specification. Particulars, which are subject to
guarantee, shall be clearly marked. Offer not containing this information will not be considered.
1.11 GENERAL PARTICULARS:
a) The bidder is required to impart training in view of manufacture, assembly, erection, operation and
maintenance for offered item, at his works, to the person/s identified by GETCO, in the event of an order,
free of cost. The cost of logistics will be bear by GETCO.
b) Please note that the evaluation will be carried out on the strength of content of bid only. No further
correspondence will be made.
c) The bidder shall bring out all the technical deviation/s only at the specified annexure.
d) The bidder should indicate manufacturing capacity by submitting latest updated certificate of a Chartered
SPECIFICATION FOR CABLE TERMINATION ACCESSORIES
2.1.1 This section covers the scope of general technical requirement of the 66 kV cable associated end termination
kits, end termination connections and pre-commissioning tests to be undertaken by the Bidder.
2.2 CABLE JOINTING ACCESSORIES (KITS):
2.2.1 66 kV XLPE cable accessories shall be suitable for the specified size of the cable. The terminating kits shall
be suitable for termination of the cables for outdoor installation.
2.2.2 Cable accessories shall be heat shrinkable type OR Polymeric termination as defined in IEEE 48-1990.
2.2.3 The cable jointing accessories shall include the end terminating kit and any special tools and tackles, required
for making these joints.
2.2.4 i) Cable end termination accessories (kits) shall be suitable for tropical climatic conditions as specified as
below. The joint shall be compatible with sheath bonding system and method of earthing.
CLIMATIC CONDITIONS: The climatic conditions under which the cable shall operate satisfactorily
are as follows :
l) Maximum ambient temperature of air in shade 0C
m) Minimum ambient temperature of air in shade 0C
n) Maximum daily avenge ambient temperature 0C :
o) Maximum yearly average ambient temperature 0C
p) Maximum relative humidity % :
q) Average number of the thunder storm days per annum. : :
r) Average annual rainfall Cm :
s) Maximum wind pressure kg/m2 :
t) Altitudes not exceeding above MSL Meter :
u) Max. soil temp. at cable depth 0C :
v) Max. soil thermal resistivity ohm-cm :
ii) The particulars of requirement of electrical performance of termination shall be suitable for power cable
of below specification.
CABLE PARAMETERS 66 KV
i) Voltage grade (Uo/U) 38 / 66 KV
ii) No. of cores Single
iii) Size (mm2)
iv) Nominal system voltage 66KV
v) Highest system voltage 72.5KV
vi) System Frequency Hz
vii) Variation in frequency 5%
viii) Fault level individually for
v) Cu.screen 59.22KA / 1 Sec.
vi) Armour 31.5KA / 1 Sec.
31.5KA / 1 Sec.
ix) Maximum allowable temperature
c) Design continuous operation at rated full load current, 0C
the max. temp. of conductor shall not exceed
d) The conductor temperature after a short circuit for 0C
1.0 sec. shall not exceed.
x) Basic insulation level. 350KV
(1.2 / 50 Micro second wave)
xi) 1-min. power frequency withstand voltage (
xii) System earthing Solidly grounded
2.2.5 i) Cable termination kits shall be suitable for tropical climatic conditions as specified in
above. The joint shall be compatible with sheath bonding system and method of earthing.
The cable termination kits shall be suitable for 66 kV
(E) XLPE power cable suitable for total system.
ii) The particulars of requirement of electrical performance of termination shall be as
2.2.6 The end termination arrangement shall be of outdoor antifog type and shall be complete
with all accessories, including conductor fittings, insulating, sealing, consumable items,
filling materials, creepage extenders (skirts) and terminal studs etc. complete.
2.2.7 The kits must eliminate all disadvantages normally encountered in resin based termination
and jointing system i.e. shelf life limitations, health hazards, delay in curing.
2.2.8 These shall be weather resistant and should withstand the long-term weather effects either
due to rain-polluted atmosphere or by heavily industrial and saline polluted atmosphere.
Accelerated testing conducted by the Bidder or manufacturer on the kits as per IEC-112 /
VDE-0303 to confirm non-tracking properties of outer surface in detail shall be submitted
in their offer.
2.2.9 The kit shall be suitable for storage without deterioration at a temperature up to 50 OC
under normal condition of storage and should have adequate storage life preferably for
period not less than 8/10 years.
2.2.10 Suitable size of the kit shall be stated in case a particular size of cable kit does not confirm
to the size of cable.
2.2.11 a) The joints and termination shall have suitability to adopt the bonding system with SVL
at end (termination) and end point, solidly grounded.
b) The successful bidder shall have to submit technical details along with the connection
diagram, details of link boxes, SVL etc.
c) The connecting cable from end terminations to link boxes shall be laid in heavy duty
PVC / Polyethylene pipes at minimum depth of 1 meter from road level.
d) The link box shall be installed on structure OR pillar. The box shall be easily accessible
for maintenance purpose in whether proof masonry manhole boxes.
e) Suitable size of the kit shall be stated in case a particular size of cable kit does not
confirm to the size of cable.
f) The link boxes should be dust proof and weather proof.
2.2.12 The Bidder shall furnish the detailed Guaranteed technical Particulars of the accessories
like termination kits offered by them in the prescribed format. Any additional details, if
desired, shall also be submitted in the offer.
2.2.13Type Tests on cable accessories
The bidder shall submit the following type test in sequence for joints and termination
a) Partial discharge test at ambient temperature,
b) Heating cycle voltage test
c) Partial discharge test
- At ambient temperature and
- At high temperature.
The tests shall be carried out after the final cycle of (b) above or alternatively after
the impulse voltage test in (d) below.
d) Impulse voltage test followed by P.F. voltage test
e) Partial discharge tests if not previously carried out in (c) above. Test of outer
protection for buried joints.
(Technical Bidding Schedule)
(To be filled in and signed by the Bidder)
The bidder must fill up all the point of GTP for offered item/s. Instead of indicating
“refer drawing, or as per IS/IEC”, the exact value/s must be filled in.
GUARENTED TECHNICAL PARTICULARS;
1 X 630 sq mm 66 KV XLPE CABLE ACCESSORIES
SR NO DESCRIPTION To be filled by bidder
1. Manufacturer's name & works address
2. a. Size (mm & shape)
2. b. Type of termination kit.
3. Rated voltage. KV
4. Rated continuous current (Amp.)
5. Rated impulse withstand voltage (kV)
6. Impulse wave shape in micro-second
7. Power frequency withstand voltage
(a) Dry (kV rms)
(b) Wet (kV rms)
8. Impulse (kV peak)
9. Mounting details
(a) Sealing end / switchyard
10. Self life of the kit
11. Guarantee of termination kit
12. Test details
13. Curing period
14. Effects due to rain, polluted atmosphere and heavily saline
polluted atmosphere and suitability for tropical climatic
15. Net volume of kit length / breath / width and weight
16. Craft sensitivity & reliability
17. Time required to prepare a joint / termination
18. Time required for energisation after joint
19. Deterioration of component during storage
20. Flexibility / reopen ability, if any
21. Chemical reaction which may cause health hazards, if any
22. Special storage conditions, if any, up to Amb. Temp. of
Deg. C and period
23. Provision for free training programme, if any, to linemen
and jointers of GETCO.
24. Provision for track resistance for cable
25. Provision for stress relief for cable
26. Provision for discharge due to uneven surface of cable
27. Is there any additional support required for termination kit?
If so, give details.
28. Provision for sealing system, if any
29. Whether kit is suitable for offered 66 kV single core 630 Sq.
30. Connection details provided with kit for outdoor 66KV line
Signature of the Bidder :
Authorised common rubber
Stamp / seal of the bidder :
NOTE: THE BIDDER MAY USE SEPARATE SHEET FOR FILLING UP
ABOVE FORMAT FOR GIVING MORE DETAILS.
GUJARAT ENERGY TRANSMISSION
CORPORATION LTD.
Sardar Patel Vidyut Bhavan, Race Course,
TECHNICAL SPECIFICATIONS
66 KV 1C 630 SQ.MM. XLPE POWER
CABLE WITH ALUMINUM
CORRUGATED METALLIC SHEATH
UNDER GROUND LINE
GETCO/E /TS– PCBL025A R5 July.
TECHNICAL SPECIFICATIONS FOR 66 KV (CROSS LINKED POLYETHYLENE
INSULATED) POWER CABLE :
1.1.1 The scope under this section covers design, engineering, manufacture, testing, packing, supply of 66 KV,
630 Sq.mm, XLPE, insulated power cable for use with solidly grounded distribution systems.
The XLPE cable and its accessories shall be complete with all fittings and components
necessary for the satisfactory performance and ease of maintenance.
1.2 STANDARDS: Unless otherwise specified, the cables shall conform, in all respects, to IEC-502, IEC-
60840 and IS: 7098 (Part-III) / 1993 with latest amendment or latest edition for cross linked polyethylene
insulated Thermoplastic High Density Polyethylene sheathed cable for working voltage of 66 KV.
1.3 CLIMATIC CONDITIONS: The climatic conditions under which the cable shall operate
satisfactorily are as follows :
a) Maximum ambient temperature of air in shade 0C :
b) Minimum ambient temperature of air in shade 0C :
c) Maximum daily average ambient temperature
d) Maximum yearly average ambient temperature 0C
e) Maximum relative humidity % :
f) Average number of the thunder storm days per annum. :
g) Average annual rainfall Cm :
h) Maximum wind pressure kg/m2 :
i) Altitudes not exceeding above MSL Meter :
j) Max. soil temp. at cable depth 0C :
k) Max. soil thermal resistivity ohm-cm :
1.4 PRINCIPAL PARAMETERS:
1.4.1 66 KV (E) grade XLPE single core power cable, with H. D. aluminium conductor, shielded with extruded
semi-conducting layer, insulated with dry gas cured cross linked polyethylene (XLPE) insulation(super
cleaned), insulation screened with extruded semi-conducting layer followed by semi-conducting water
swellable tapes followed by copper woven semiconducting tape,
corrugated seam welded/seam less (extruded) Aluminium sheath with anticorrosive protective
coating [suitable for 31.5 KA for 1 second] and overall HDPE outer sheathed with extruded semi-
conductive layer OR Graphite coating on it, confirming to IEC-60502 for construction, IEC-60840
for Testing and in line with to IS : 7098 (Part-III) / 1993 or any latest amendments thereof. Outer
sheathing should be designed to afford high degree of mechanical protection and should also
be heat, oil, chemicals and weather resistant. Common acid. Alkalis and saline solution should
not have adverse effect on the Thermoplastic HDPE sheathing material used.
1.4.2 The cable should be suitable for laying in covered trenches and / or under ground for
1.4.3 CABLE PARAMETERS 66 KV
i) Voltage grade (Uo/U) KV 38 /
ii) No. of cores Single
iii) Size (mm2)
iv) Nominal system voltage KV
v) Highest system voltage KV
vi) System Frequency Hz
vii) Variation in frequency 5%
viii) Fault level individually for
i) Conductor 59.22 KA / 1 Sec.
ii) Aluminium sheath (for one second) 31.5 KA / 1 Sec.
ix) Maximum allowable temperature
a) Design continuous operation at rated full load current, 0C
the max. temp. of conductor shall not exceed
b) The conductor temperature after a short circuit for
1.0 sec. shall not exceed. 0C
x) Basic insulation level.
(1.2 / 50 Micro second wave)
xi) 1-min. power frequency withstand voltage ( 140 KV
xii) System earthing Solidly grounded
1.5 GENERAL TECHNICAL REQUIREMENTS:
1.5.1 CONDUCTOR: The cable conductor shall be made from stranded H.D. aluminium to form compact
circular shaped conductor having resistance within limits specified in IS: 8130 / 1984 and any amendment
thereof. The conductor shall confirm to IEC: 228 and the shape shall be compacted circular shaped.
Nominal diameter of individual strand & number of strands shall be selected such that calculated
conductor nominal cross section shall be 630 sq. mm.
1.5.2 CONDUCTOR SHIELD: The conductor having a semi-conducting screen shall ensure perfectly smooth
profile and avoid stress concentration. The conductor screen shall be extruded in the same operation as
the insulation; the semi-conducting polymer shall be cross-linked.
1.5.3 INSULATION: The XLPE insulation should be suitable for specified 66KV system voltage. The
manufacturing process shall ensure that insulations shall be free from voids. The insulation shall withstand
mechanical and thermal stresses under steady state and transient operating conditions. The extrusion
method should give very smooth interface between semi-conducting screen and insulation. The insulation
of the cable shall be of high standard quality, generally confirming to IEC-60840 and I.S. 7098 part-III /
1993 (latest edition).
1.5.4 INSULATION SHIELD: To confine electrical field to the insulation, non-magnetic semi-conducting
shield shall be put over the insulation. The insulation shield shall be extruded in the same operation as the
conductor shield and the insulation by triple extrusion process. The XLPE insulation shield should be
1.5.5 To prevent entry / propagation of longitudinal ingress of moisture, semiconducting woven / non-woven
water swellable tapes shall be provided. Further, one layer of copper woven semi-conducting tape should
be applied. Suitable layers of tapes shall be provided with overlap to achieve minimum thickness of
METALLIC SHEATH : The metallic sheath shall comprise of a corrugated seam welded /
seamless (extruded) aluminium sheath. The radial thickness of Aluminium sheath shall be
mm minimum for 630 sq. mm. cable. The Cross section Area of metallic sheath shall be
sq.mm minimum whose detailed calculation to be submitted by Bidder as per Cl 2.2.14. A
suitable anti-corrosive treatment should be given to outer surface of Aluminium sheath. It should
be of adequate thickness, consistent quality and free from all defects. Also, Aluminium sheath
should be suitable to carry 31.5 KA earth fault current for one second minimum. Detailed
calculation with support documents shall be submitted with technical bid. For seam welded
sheath, the welding shall be of high quality & ensure minimum strength as that of Aluminum with
no porosity. Necessary fillers and water swellable non woven binder tape shall be used above
metallic sheath to ensure overall round shape of cable.
1.5.6 OUTER SHEATH: Extruded HDPE type ST7 outer sheath confirming to IEC: 502/1983, shall be applied
over Aluminium Sheath with suitable additives to prevent attack by rodents and termites. The outer sheath
shall be coated with thin layer of extruded semiconducting material OR graphite throughout the length of
cable. Thickness of outer sheath shall be one step higher, than required as per IS:7098 i.e. not less than
3.6 mm. Nominal and 2.68 mm. Minimum.
Each cable length shall be provided with a pulling socket/eye which shall be fitted to pulling end
on conductor. The pulling socket/eye shall be able to take pulling tension as per recommended
for cable conductor size along with reasonable factor of safety. The pulling socket/eye shall be
fitted in such a fashion to avoid moisture/water ingress during storage/transit.
1.5.7 CONSTRUCTION:
1.5.7.1 All materials used in the manufacture of cable shall be new unused and of finest quality. All materials
should comply with the applicable provision of the tests of the specification. IS, IEC, Indian Electricity
Rules, Indian Electricity Act and any other applicable statutory provisions rules and regulations.
1.5.8 CURRENT RATING: The cable will have current ratings and derating factors as per relevant standard
1.5.8.1 The one-second short circuit current rating values each for conductor & Aluminium sheath shall be
furnished with detailed calculation along with support documents and shall be subject to the purchaser's
1.5.8.2 For calculating short circuit rating of Aluminium sheath, initial temperature of sheath shall be considered
not less than 80 °C & final temperature not more than 160 °C.
1.5.8.3 The current ratings shall be based on maximum conductor temperature of 90 deg. C with ambient site
condition specified for continuous operation at the rated current.
1.5.9 OPERATION:
1.5.9.1 Cables shall be capable of satisfactory operation under a power supply system frequency variation of 5%
voltage variation of 10 % and combined frequency voltage variation shall be +10 % & - 15%.
1.5.9.2 Cable shall be suitable for laying in ducts or buried under ground.
1.5.9.3 Cable shall have heat and moisture resistance properties. These shall be of type and design with proven
record on transmission network service.
1.5.10 LENGTHS: The cable shall be supplied in standard drum lengths as below:
Size of cable Standard Drum length
a) 66 KV, 1C x 630 sq.mm. 1000 meters 5% tolerance and
2 % overall tolerance in total quantity of cable.
1.5.11 INDENTIFICATION MARKING: Identification of cables shall be 'provided externally
at three meters’ intervals to identify as under.
i) 'Name of manufacture'
ii) ‘Per meter marking’
iii) 'Year of manufacture'
iv) 'Voltage grade' to be printed / embossed at the interval of one meter-length. The identification, by
printing or embossing shall be done only on the outer sheath. Name of the purchaser shall also be
TYPE TESTS: The cable & accessories offered shall be fully type tested as per the relevant
standards with latest / amended / up to date IS/IEC. In case the cable & accessories of the type
and design offered has already been type tested in a Govt. approved NABL approved laboratory,
the Bidder shall furnish two sets of type test Hard Copy/Color Scan reports along with the offer.
Type test reports shall not be older than TEN years and shall be valid as on the last date of
submission of bid. The purchaser reserves the right to demand repetition of some or all the type
tests in the presence of purchaser's representative. Furthermore, purchaser reserve right to
select the sample from Manuf. Works & recommend the NABL lab to carry out type tests in case
of non-submission / partial submission or type test reports of which validity is over.
Type Test reports for cable of construction other than specified in tender, will be considered for
evaluation purpose, but the bidder shall have to carry out all Type Tests at Govt. approved
NABL approved/ laboratory without affecting delivery schedule and at no extra cost to GETCO,
on required construction, for which necessary confirmation shall be submitted with technical bid.
1.6.1 Type Tests
a) Tests on conductor:
i) Resistance test
b) Physical test on insulation:
i) Test for thickness and dimensions of insulation
ii) Tensile strength and elongation at break
iii) Thermal ageing in air oven
iv) Hot set test
v) Shrinkage test
c) Resistivity test for semi-conducting layers
d) Test on Aluminium sheath
i) Thickness of Aluminium sheath
e) Physical tests for outer sheath:
i) Measurement of thickness
i) Carbon black content
ii) Tensile strength
iii) Elongation at break before and after aging
iv) Hot-deformation
f) i) Thermal ageing on complete cable sample
ii) Tensile strength and elongation at break for insulation and outer sheath
iii) Resistivity test for semi-conducting layer
g) Bending test followed by P.D. test
h) Dielectric power factor and capacitance measurement at ambient
i) Dielectric power factor measurement at elevated temperature
j) Load cycle test followed by P.D. test
k) Impulse withstand test (@350 kvp) followed by HV test
l) Insulation Resistance Test (at room temperature & elevated temperature)
Important Note:
In case of non-submission / partial submission or type test reports of which validity is over, the
bidder shall submit pending type test report/s from NABL accredited laboratory, in the event of
an order, before commencement of supply without affecting delivery schedule, free of cost to
GETCO. Confirmation for above shall be invariably submitted along with technical bid.
1.6.2 ACCEPTANCE AND ROUTINE TESTS:
1.6.2.1 All acceptance and routine tests as stipulated in the IEC-60840 and IS: 7098 (Part-III) / 1993 shall be
carried out by the supplier in presence of purchaser's representative.
Sample shall be selected from offered lot, for not less than 10% (Ten percent) of nos. of cable drums, for
conducting acceptance tests after considering the next highest whole numbers.
Minimum 5% of the drums offered subject to minimum two in any lot offered for inspection shall
be subjected to length verification & physical check of outer sheath & identification markings.
1.6.2.2 Acceptance Tests
a) Conductor resistance test
b) Test for dimensions of insulation
c) Hot set test for insulation
d) Void and contaminants test
e) Test for thickness of Aluminium sheath
f) Sheath Integrity Test for metallic sheath (Refer Annexure - A) (to perform as stage Inspection
before outer sheathing)
g) Mechanical strength of welded sheath (Refer Annexure - A) (to perform as stage Inspection before
outer sheathing)
h) Test for thickness of outer sheath
i) Partial discharge test
j) High voltage test (30 min. on full drum as well as 4Hrs. on sample)
k) Measurement of capacitance
l) Insulation Resistance Test (at room temperature & elevated temperature)
m) Conductor Weight KG/meter (for reference Only)
Note that tests mentioned at (f) & (g) above shall be offered & performed in presence of GETCO
inspector as stage inspection on 100% cable drums for seam weld metallic sheath & 25% cable
drums for seamless/extruded metallic sheath, after metallic sheath operation completion &
before doing outer sheathing or any associated activity like bitumen layer etc. The same shall
be included in Manufacturing Quality Plan to be submitted by bidder. However, note that GETCO
reserves right for reduction of sampling plan or waivel of the stage inspection tests.
1.6.2.3 Immediately after finalization of the programme of type/acceptance/routine testing, the supplier shall give
fifteen days advance intimation to the purchaser, to enable him to depute his representative for witnessing
1.7 INSPECTION:
The inspection may be carried out by the purchaser at any stage of manufacture. The successful
Bidder shall grant free access to the purchaser's representative at any reasonable time when
the work is in progress. Inspection and acceptance of any equipments/items under this
specification by the Purchaser shall not relieve the supplier, of his obligation of furnishing
equipment in accordance with the specification and shall not prevent subsequent rejection, if the
equipment/items is found to be defective.
The supplier shall keep the purchaser informed in advance, about the manufacturing program,
so that arrangement can be made for inspection, without delay.
The purchaser reserves the right to insist for witnessing the acceptance/routine testing of the bought
1.8 DOCUMENTATION:
1.8.1 LIST OF DRAWINGS AND DOCUMENTS: The Bidder shall furnish two sets of following
documents along with his offer. The offer without documents shall be considered incomplete.
a) The sectional view drawing showing general constructional features of power cable with details of
materials / conductor / conductor screen / XLPE insulation / water swell able tape / Aluminium sheath
/HDPE sheath etc. with offer dimensions.
b) Literature for offered items.
c) Unpriced schedule of price bid (without prices)
d) Type test reports for the offered items in case the items have already been type tested for specified
e) All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in AutoCAD format and
manuals in PDF format, for offered item shall be submitted. Also the hard copies as per specification shall
f) The bidder shall submit Quality Assurance Plan for manufacturing process and Field Quality Plan
with the technical bid.
g) All the points other than GTP, which are asked to confirm in technical specifications must be
submitted separately with the bid.
1.9 PACKING AND FORWARDING:
1.9.1 The cable shall be packed returnable steel drums suitable for vertical/horizontal transport as
the case may be, and suitable to withstand handling during transport and outdoor storage during transit.
The supplier shall be responsible for any damage to the items during transit, due to improper and
inadequate packing. Wherever necessary, proper arrangement for lifting shall be provided. Any item
found short shall be replenished by supplier without any extra cost.
1.9.2 Each consignment shall be accompanied by a detailed packing list containing the following information:
a) Name of the consignee
b) Details of consignment
d) Total weight of consignment
e) Handling and unpacking instructions
f) Bill of material indicating contents of package
1.10 TECHNICAL & GUARANTEED PARTICULARS: The Bidder shall furnish guaranteed technical
particulars as called for in appendix-I (Schedule-A) of this specification. Particulars, which are subject to
guarantee, shall be clearly marked. Offer not containing this information will not be considered.
1.11 GENERAL PARTICULARS:
a) The bidder is required to impart training in view of manufacture, assembly, erection, operation and
maintenance for offered item, at his works, to the person/s identified by GETCO, in the event of an order,
free of cost. The cost of logistics will be bear by GETCO.
b) Please note that the evaluation will be carried out on the strength of content of bid only. No further
correspondence will be made.
c) The bidder shall bring out all the technical deviation/s only at the specified annexure.
d) The bidder should indicate manufacturing capacity by submitting latest updated certificate of a Chartered
SPECIFICATION FOR CABLE TERMINATION ACCESSORIES
2.1.1 This section covers the scope of general technical requirement of the 66 kV
cable associated end termination kits, end termination connections and pre-
commissioning tests to be undertaken by the Bidder.
2.2 CABLE JOINTING ACCESSORIES (KITS):
2.2.1 66 kV XLPE cable accessories shall be suitable for the specified size of the cable. The
terminating kits shall be suitable for termination of the cables for outdoor installation.
2.2.2 Cable accessories shall be heat shrinkable type OR Polymeric termination as defined in
2.2.3 The cable jointing accessories shall include the end terminating kit and any special tools
and tackles, required for making these joints.
2.2.4 i) Cable end termination accessories (kits) shall be suitable for tropical climatic
conditions as specified as below. The joint shall be compatible with sheath bonding
system and method of earthing.
CLIMATIC CONDITIONS: The climatic conditions under which the cable shall
operate satisfactorily are as follows :
l) Maximum ambient temperature of air in shade
m) Minimum ambient temperature of air in shade 0C :
n) Maximum daily avenge ambient temperature
o) Maximum yearly average ambient temperature
p) Maximum relative humidity % :
q) Average number of the thunder storm days per annum. :
r) Average annual rainfall Cm :
s) Maximum wind pressure kg/m2 :
t) Altitudes not exceeding above MSL Meter :
u) Max. soil temp. at cable depth C :
v) Max. soil thermal resistivity ohm-cm :
ii) The particulars of requirement of electrical performance of termination shall
be suitable for power cable of below specification.
CABLE PARAMETERS 66 KV
i) Voltage grade (Uo/U) 38 / 66 KV
ii) No. of cores Single
iii) Size (mm2)
iv) Nominal system voltage 66KV
v) Highest system voltage 72.5KV
vi) System Frequency Hz
vii) Variation in frequency 5%
viii) Fault level individually for
i) Conductor ) KA 59.22KA / 1 Sec.
ii) Aluminium sheath ) for one second 31.5KA / 1 Sec.
ix) Maximum allowable temperature
c) Design continuous operation at rated full load 0C
current, the max. temp. of conductor shall not
d) The conductor temperature after a short
circuit for 1.0 sec. shall not exceed.
x) Basic insulation level. 350KV
(1.2 / 50 Micro second wave)
xi) 1-min. power frequency withstand voltage
xii) System earthing Solidly grounded
2.2.5 i) Cable termination kits shall be suitable for tropical climatic conditions as specified in above. The joint
shall be compatible with sheath bonding system and method of earthing. The cable termination kits shall
be suitable for 66 kV
(E) XLPE power cable suitable for total system.
ii) The particulars of requirement of electrical performance of termination shall be as above.
2.2.6 The end termination arrangement shall be of outdoor antifog type and shall be complete with all
accessories, including conductor fittings, insulating, sealing, consumable items, filling materials, creepage
extenders (skirts) and terminal studs etc. complete.
2.2.7 The kits must eliminate all disadvantages normally encountered in resin based termination and jointing
system i.e. shelf life limitations, health hazards, delay in curing.
2.2.8 These shall be weather resistant and should withstand the long-term weather effects either due to rain-
polluted atmosphere or by heavily industrial and saline polluted atmosphere. Accelerated testing
conducted by the Bidder or manufacturer on the kits as per IEC-112 / VDE-0303 to confirm non-tracking
properties of outer surface in detail shall be submitted in their offer.
2.2.9 The kit shall be suitable for storage without deterioration at a temperature up to 50 OC under normal
condition of storage and should have adequate storage life preferably for period not less than 8/10 years.
2.2.10 Suitable size of the kit shall be stated in case a particular size of cable kit does not confirm to the size of
2.2.11 a) The joints and termination shall have suitability to adopt the bonding system with SVL at end
(termination) and end point, solidly grounded.
b) The successful bidder shall have to submit technical details along with the connection diagram, details
of link boxes, SVL etc.
c) The connecting cable from end terminations to link boxes shall be laid in heavy duty PVC / Polyethylene
pipes at minimum depth of 1 meter from road level.
d) The link box shall be installed on structure OR pillar. The box shall be easily accessible for maintenance
purpose in whether proof masonry manhole boxes.
e) Suitable size of the kit shall be stated in case a particular size of cable kit does not confirm to the size of
f) The link boxes should be dust proof and weather proof.
2.2.12 The Bidder shall furnish the detailed Guaranteed technical Particulars of the accessories like termination
kits offered by them in the prescribed format. Any additional details, if desired, shall also be submitted in
2.2.13 Type Tests on cable accessories
The bidder shall submit the following type test in sequence for joints and termination as per IEC
a) Partial discharge test at ambient temperature,
b) Heating cycle voltage test
c) Partial discharge test
- At ambient temperature and
- At high temperature.
The tests shall be carried out after the final cycle of (b) above or alternatively after the
impulse voltage test in (d) below.
d) Impulse voltage test followed by P.F. voltage test
e) Partial discharge tests if not previously carried out in (c) above. Test of outer
protection for buried joints.
2.2.14 AREA OF CORRUGATED ALUMINIUM SHEATH
Area of Corrugated Aluminium Sheath
Area = ( Dt2 - D g2 ) * f
where Dt = Diameter over trough in mm
Dg = Diameter over gap below Aluminium Sheath in mm
f = Corrugation factor =
h = Height of Corrugation
p = Pitch of Corrugation
1. Sheath Integrity Test for Metallic sheath:
This test shall be offered & performed in presence of GETCO inspector as stage inspection on cable
drums after metallic sheath operation completion & before doing outer sheathing or any associated
activity like bitumen layer etc. Intention of this test is to ensure no crack, porosity, blow holes or poor
welding is left with metallic sheath to ensure its function of radial water barrier. This test is applicable
for both types, seam welded / seam less (extruded) metallic sheath.
The cable (core + metallic sheath) shall be sealed on one side with appropriate arrangement to
arrest any leakage from test accessory joints & to be provided with pressure gauge & valve to work
as outlet only. The other side of cable shall be sealed with appropriate arrangement to arrest any
leakage from test accessory joints & to be provided with pressure gauge & valve to be connected
with inlet for dry air or nitrogen gas. Keeping outlet valve closed the inlet valve shall be opened slowly
& suitably to allow inlet of dry air or nitrogen gas. Pressure of minimum 1 bar shall be achieved
(indicated in both pressure gauges) & maintained for 1/2 hr. period without any drop. The pressure
shall not drop.
In case of pressure drop observed in any drum of cable, that drum shall be considered as non-
compliance of requirement & shall not be included for further activity. The cable shall be properly
sealed & signed by GETCO inspector at both ends. Any corrective action in cable shall be done with
prior intimation & confirmation of GETCO only.
2. Mechanical strength of welded sheath:
This test shall be offered & performed in presence of GETCO inspector as stage inspection on cable
drums after metallic sheath operation completion & before doing outer sheathing or any associated
activity like bitumen layer etc. Intention of this test is to ensure high quality welding. This test is
applicable for seam welded metallic sheath only.
Ring of metallic sheath shall be cut & shall be straightened. The strip shall be cut in two pieces,
sample one to include welding line & sample two without welding line. Sample two (without welding
line) shall be subjected for tensile strength test & the value achieved shall be considered as
reference. Now sample one shall be subjected for tensile strength test & the value achieved shall be
not less than 90% of sample two (or reference value).
GUJARAT ENERGY TRANSMISSION CORPORATION
Sardar Patel Vidyut Bhavan, Race Course,
TECHNICAL SPECIFICATIONS
LAYING OF UNDER GROUND POWER CABLE
TRANSMISSION LINE
GETCO/E/TS–LUC058/R2. JULY-2018
TECHNICAL PARTICULARS FOR LAYING, TESTING AND COMMISSIONING
OF 66KV XLPE UNDERGROUND POWER CABLE
SPECIFICATION FOR LAYING OF CABLE
1.1. LAYING, JOINTING AND INSTALLATION (GENERAL):
1.1.1. It will be necessary for the successful Bidder to arrange technical supervision during installation of cable laying
and termination.
1.1.2. The successful Bidder shall arrange for the services of fully qualified and competent supervising Engineer /
Engineers and necessary minimum number of jointers, semi-skilled laborers, as he deems it absolutely necessary.
1.1.3. Provision of special tools / appliances required for conductor jointing and stripping / dressing and application of
XLPE insulation etc. shall be made by the successful Bidder.
1.1.4. The successful Bidder shall furnish all necessary information, including drawings, manuals and instructions
relating to both cable laying and jointing practice.
1.1.5. The associated civil works, which are necessary in laying / installation of power cable, though not specifically
mentioned, but shall be completely in the scope of successful Bidder.
1.1.6. The route map showing the proposed installation of power cable will be issued to the successful Bidder. Cables
are to be laid in single trench as per instruction of E.I.C.
1.1.7. Successful Bidder has to arrange at his own for first-aid, fire protection, electricity and water requirement at site.
He shall also arrange for sign GETCO, caution GETCO, safety & security personnel etc. on cable route.
1.1.8. The successful Bidder has to bear with any temporary interruption that may occur during actual erection work,
when the matter with other agency is involved.
1.1.9. No idling charges or cost over run for the entire project shall be entertained.
1.1.10. Approval for installation of the underground cable route from Electrical Inspector shall be arranged by
Purchaser. However, permission for commencement of work and permission for commissioning of cable
after completion of laying has to be arranged by the successful Bidder.
1.1.11. Successful Bidder shall arrange space for working office, workshop & store / yard for storing requisite materials
like kits, cables etc.
1.1.12. The Arbitration in the dispute shall be strictly as per standard commercial terms & conditions of the GETCO.
1.2. LAYING OF POWER CABLE:
1.2.1. The 66kv (E) XLPE cable shall be installed underground and normally buried directly in the ground complying
with all applicable standards and IS: 1255 & their amendments.
1.2.2 The sealing of power cable ends during the storage; execution & completion of jointing work shall be in the scope
of successful Bidder. In no circumstances, the cable ends shall be kept open. The amount due to damages done
because of water / moisture ingress OR penetration in the cable / conductors during execution shall be recovered
from successful Bidder. It shall be responsibility of successful Bidder to make them good OR replace free of cost
without affecting the completion schedules.
1.2.3 Three single core cables shall be laid in trefoil formation.
1.2.4 The power cable shall be laid generally at a depth of 1500 mm and can vary, if obstacles like power cable of other
rating / telephone cable / water pipe line etc, come in the way of installation. At least minimum Depth of
mm shall be maintained from nearest road level.
1.2.5 The cables shall be completely surrounded by a layer of having a low thermal resistivity (selected sand) sand
about 350 mm over & 150 mm below of the cable surface throughout width of the cable trench at no extra cost.
(River sand shall be allowed for surrounding layer)
1.2.6 The extra protection of pre-cast flat RCC slab with proportion 1:2:4 having size 600 (L) x 300 (B) x 50 (Thk) mm
shall be provided about 350 mm over the power cables for complete route of the cable.
The RCC slab shall be with proportion not less than 1:2:4 (M-150) and also shall have steel reinforced
of 6 / 8 mm dia. steel bar (4 Nos. of 300 mm side and 5 Nos. on 600 mm side) at adequate required
distance. The slab shall be given curing time of minimum 15 days.
1.2.7 Normally, the back filling shall consist of the materials earlier excavated, however, bigger stones or piece of rock
should be removed OR if required new soil has to be provided and used for back filling with no extra cost.
1.2.8 The cable drum must be handled correctly and with care during transport and laying of the power cables, in order
to avoid damage to the cables. Any damages done because of poor handing of the cables to the properties of
Seal & Signature of Bidder
corporation, private OR to anybody shall be responsibility of successful bidder & the GETCO reserves the right
to recover the amount due to such damages.
1.2.9 The minimum bending radius of the cable shall be 30xD where D is diameter of the cable.
1.2.10 The contractor has to keep allotted 66kv power cable, material supplied by him in safe custody and transport to
the respective sites and will be fully responsible for any damage to or loss of any or all allotted equipments or
materials supplied by him at any stage during transportation or erection or taking over of the sub station by the
GETCO. The contractor has to return empty cable drum as instructed by E.I.C. The route map for cable will be
issued free of cost to the contractor before commencement of work, however the changes made by Engineer in
charge (i.e. Ex. Engr. (Const.) shall be incorporated.
1.2.11 The Contractor has to open site store at sub station site or at place nearby the substation site and ensure for safe
custody of all the stored materials at his own cost.
1.2.12 The Contractor shall have total responsibility for the entire materials stored, loose, semi assembled and/or
erected by him at site in his custody. The Contractor shall make suitable security arrangements at his own cost
to ensure the protection of all materials, equipment and works from theft, fire pilferage and any other damages
and loss. It shall be the responsibility of the contractor to arrange for security till the works are finally taken over
1.2.13 Link box shall be rested/fixed on 230 mm thick brick masonry wall, which covers cable by all four sides, having
appropriate height as per requirement of site & instruction of engineer in charge, however height shall not less
than 500 mm above existing Ground level/Road Level.
1.3. CROSSINGS:
1.3.1 (a) Where road crossing comes in way of laying power cable, the power cable shall be laid through NP-4 RCC
Hume pipes. The required length of Hume pipe shall be arranged by the successful Bidder at no extra cost.
(b) The RCC Hume pipe inner dia-meter shall not be less than 400 mm.
(c) The RCC pipes to be laid shall have minimum depth in such a way that the back filling on top surface of the
pipe shall be at least 600mm in depth. The pipe joints shall be smooth so that cables are not damaged during
pulling & operation.
(d) During the crossing of utilities like water line, drainage lines, telephone lines, gas lines etc, sufficient care
shall be taken & protection shall be made available so that other utilities do not damage the cable mechanically
and / or electrically or do not effect the performance of the cable.
(e) NALA CROSSINGS / CULVERT CROSSINGS: The Nala crossings are to be made with separate fly-over
bridges of adequate sizes to carry all the cables in required formation. The bridges are to be made at the sufficient
distances from the edge of Nala considering the further expansions of roads. The strength shall be such that it
should not wash away with the flow of water during heavy rain.
1.4 IDENTIFICATION, MARKING AND WARNING:
1.4.1 The identification marker shall be of adequate size fabricated from 3 mm thick, 25 mm x 25 mm aluminium strip.
The marker shall be embossed with letter as stated below:
“GETCO - 66KV S/S” and “Phase R or Y or B” – as the case may be.
The marker shall be tightened with nylon thread along with each cable at interval of 3 meters in such a
way that it does not damage / penetrate the outer sheath of cable because of the dead weight of back
filled materials OR soil.
1.4.2 A pre-warning PVC yellow tape with size 150 mm (width) x 100 microns thick (HDDPE) / LLDPF shall also
be laid as per following clause of the specification. The warning tape shall also contain the "WARNING"
printed in black letters as under (In English as well as Gujarati):
"CAUTION: 66000 VOLTS GETCO CABLE"
1.4.3 A pre–warning tape as per above clause shall be laid below ground level in the earth about 400 / 550 mm deep
along the route of cable and in jointing bays.
1.4.4 The cable route marker is to be made from R.C.C. blocks duly embossed on all the side as under:
“GETCO 66 kV CABLE LINE”
The minimum size shall be 900(L) x 300(B) x 100(T) mm. It shall be at least embedded in ground up to
minimum 400 mm depth. The exposed portions shall be painted with non-washable paints. The interval
Seal & Signature of Bidder
should be minimum 30 meters between two markers. It should be put at bends, curves, road crossing,
etc. of cable route.
Name of cable route & Sr. no. of route marker shall also be painted with non-washable paints.
Warning board shall be made as per drawing & placed at major crossing points of cable route & at
minimum 90-meter interval, including following details: Name of route, “GETCO 66 kV cable” & mobile
no. of concern cable owner Substation.
1.5 TEST AFTER INSTALLATION:
1.5.1 Pre-commissioning tests on site, to be undertaken by the successful Bidder shall include the following:
a) Insulation Resistance of each cable drum length after laying and before jointing.
b) Tests for detection of damage to outer sheath, if any.
c) Serving insulation resistance after laying each cable length shall withstand a voltage of 10kv DC for one
minute between each reinforcement and external conducting surface; In addition, the serving insulation resistance
shall be measured and checked with the values obtained during routine factory tests.
d) On completion of the cable laying and jointing work, the complete installation shall be checked with a D.C.
voltage of 3 Uo applied for 15 minutes between each conductor and sheath.
e) Conductor resistance of each cable of each complete circuit.
f) Test for 5 min. with system voltage applied between the conductor and the screen.
g) Test for 24 hours with normal operating voltage of the system.
h) Continuity & Phase confirmation.
NOTE: The pre-commissioning test at (f) or (g) at site to be undertaken as an alternative to the test (d).
(1) The cable laying shall have to be done, as per actual site condition at the time of execution, and as per the
instruction of the engineer-in-charge.
(2) The structures for termination of the cable at tower end shall be arranged by the GETCO. Necessary
arrangement shall be made by the engineer-in-charge.
(3) The scope of work shall also include assistance in obtaining required permission / approval from various
statutory authorities i.e. Municipal Corporation, Gram Panchayat (if any), PWD, Electrical Inspector,
Telecom Department etc. Payment demanded by any statutory authority as a compensation shall be
reimbursed by GETCO on submission of documentary evidence i.e. Receipt of such payment made.
(4) The Un-priced schedule of the offered item shall also be submitted with technical Bid.
(5) The successful bidder has to complete the work within one Quarters after commencement period
(6) The end of cut pieces of cables left out during executions shall be sealed to prevent ingress of any moisture
in the cable before handing over to consignee.
(7) The consignee shall be Executive Engineer (const.), Gujarat Energy Transmission Corporation Limited,
(8) Detailed route and sectional view for laying cables is available and may be collected.
(9) The rate of laying of 66 KV Cable covers the cost of fixing of 3 phase earth box and laying of Co – axial
(10) Civil work for special crossings if any shall be considered in scope of bidder.
(11) Civil work for all nala crossings, road crossing etc. for all the above lines shall be considered in scope of
Signature of the Bidder:
Authorised common rubber
Stamp / seal of the bidder:
Seal & Signature of Bidder
Line materials will be issued from following Store Centers:
Store Centers for
Name of Line issue of line
1 Bi- Annual Rate Contract for restoration of various 66 kV Class Transmission Any store centre of
lines, damaged due to natural calamity / any other abnormality under various GETCO
transmission divisions of Jambuva Circle
Note: Generally all required materials will be issued from any store centre of GETCO. In case of non-availability
of some items, contractor shall have to collect from other store centers without extra cost to the GETCO.
Seal & Signature of Bidder
(Non Judicial Stamp Paper of Rs. 300/-)
KNOW ALL MEN BY THESE PRESENTS that we, Messer’s
Contractor” which expression shall, where the context so admits, include their heirs, executors, administrators and
legal representatives, successors and permitted assigns) are hereby held and firmly bind unto the Gujarat Energy
Transmission Corporation Ltd (hereinafter called “the GETCO” which expression shall, where the context so admits,
include its successors and assigns) to refund the full amount of materials supplied by the GETCO under the terms
________________ against any loss damage or deterioration of whatsoever nature occurs to said materials
supplied by the GETCO and which are in the custody of the contractor at their works site, on behalf of the GETCO,
at (name of line) _________________________________________________ , and / or if any of the said materials,
when inspected by any officer authorized by the GETCO in this behalf, is found to be damaged, lost, deteriorated
in quality or quantity, the contractor hereby agrees to bind himself to indemnity and at all times keep indemnified
the GETCO against all loss, damage and deterioration to the any material supplied by the GETCO during his custody
and shall pay in cash on demand from the GETCO within 30 days the market value of such materials which is lost,
damaged or deteriorated in full to the GETCO and shall also hereby authorize the GETCO to deduct the said sum
from any sum due to the contractor or any sum which may at any time become due to the contractor under the above
referred contract or any other contract entered into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and
preservation of the said materials against all risks, excluding war risks and against loss, damage and deterioration
of whatsoever nature in respect of the said materials while it remains in the custody and possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized by the GETCO
Now the conditions of the above written bond are such that the contractor shall pay the full amount forthwith to the
GETCO in the event of loss, damage or deterioration or whatsoever except due to circumstances arising out of war
in respect of the materials supplied by the GETCO and shall fully and effectually indemnify and keep indemnified to
the GETCO against such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorized by the GETCO
and produce at any time when demanded.
THE WITNESS WHERE OF: We the
(Signature of contractor)
hereto signed at ___________________
In the presence of
____________address ______________ (Signature)
_____________address ______________ (Signature)
Seal & Signature of Bidder
PROFORMA FOR CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at BARODA the_____________ day of ___________ in the Christian Year Two Thousand
Twenty four between M/s. _____________________________________ (address of office)___ (hereinafter
referred to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant to the contract
include its successors or permitted assigns) of the ONE PART and the Gujarat Energy Transmission Corporation
Ltd, having their Head office at Vidyut Bhavan, Race Course, Baroda 390 007 (hereinafter called “The GETCO”
which expression shall unless excluded by or repugnant to the context include its successors or assigns) of the other
WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors for
GETCO’s Order No. ______________________________________ _______________ hereinafter called “the
works” and more particularly described and enumerated or referred to in the specification, terms and conditions
prescribed in the order letter, covering letter and other letters and schedule of price which for the purpose of
identification have been signed by Shri ____________________________________ on behalf of the contractors
and by ---------------------------------- on behalf of the GETCO, a list whereof is made out in the Schedule hereunder
written and all of which said documents are deemed to form part of this contract and included in the expression “The
works” wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.
AND WHEREAS THE GETCO has accepted the tender of contractors for the construction of the said works for the
____________________________________________) upon the terms and subject to the conditions herein
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
1. The contractors shall do and perform all works and things in this contract mentioned and described or which
are implied therein or there from respectively or are reasonably necessary for the completion of the works
as mentioned and at the times, in the manner and subject to the terms and conditions and stipulations
contained in this contract, and in consideration of the due provision, executions, supply and completion of
the works agreed to by the contractor as aforesaid the Board doth hereby covenant with the contractor to
pay all the sums of moneys as and when they become due and payable to the contractors under the
provisions of the contract. Such payment to be made at such times and in such manner as is provided by
2. The conditions and covenants stipulated here-in-before in this contract are subject to and without prejudice
to the rights of the Board to enforce penalty for delays and / or any other rights whatsoever including the
right to reject and cancel on default or breach by the contractor of the conditions and the covenants as
stipulated in the general conditions, specifications, forms or tender schedule etc. attached with GETCO’s
The contract value, extent of supply & erection works, delivery dates, specifications and other relevant
matters may be altered by mutual agreement and if so altered shall not be deemed or construed to mean or
apply to affect or alter other terms and conditions of the contract and the general conditions and the contract
so altered or revised shall be and shall always be deemed to have been subject to and without prejudice to
said stipulation.
List of documents forming part of the contract:
1. GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated ____/____/2025
2. GETCO order No. Dtd. _____ / ______/
3. Contractor’s acceptance of order vide letter no. _______________.
4. Contractor’s Partnership Deed dtd. ________________.
5. Contractor’s Power of Attorney / Board Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties here to have set their hands and seals this day and month, year first above written.
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of M/s. __________________ (Signature)
Seal & Signature of Bidder
In the presence of (Full Name, Address and Signatures)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
for and on behalf of Gujarat Energy Transmission Corporation Ltd
Circle Office, Jambuva, BARODA - 390
In the presence of name, Full address and Signature:
Seal & Signature of Bidder
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we, _______________________________ by this SAFETY
CUM INDEMNITY BOND Executed on this _____________ Day of _________ 2025. We Having Registered
Office _______________________________(herein after called “THE CONTRACTOR” which expression shall
mean and includes my /our heirs, executors, administrators and legal representatives, successors and permitted
assigns) do hereby binds myself/ourselves and also our company/firms after having the power to bind by this
promise and undertaking in favour of the Gujarat Energy Transmission Corporation Limited (GETCO),
Vadodara a State Transmission Utility under The Electricity Act, 2003 having its registered office at Sardar
Patel Vidyut Bhavan, Race course, Vadodara.( hereinafter called as GETCO, which expression shall mean
and include its legal representative, administrators assigns) has agreed under the terms and conditions of
the contract no.______ dated_______made between _________________________________ and
________________________________for the contract of the
_________________________ interalia on production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time to the
Rupees___________________________________________________________only against any losses or
damages, costs, charges and expenses caused to or suffered by reason of the CONTRACTOR while Project,
R&M, O&M work including work carried out by outsourcing agency, failing to take proper care or not complying
the guidelines given hereunder as per Annexure-A and instructions which may be given from time to time during the
continuance of the contract and we further undertake to unconditionally pay the amount claimed by the
GETCO on demand and without demur to the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under order
having observing necessary formalities, the details of which is described in the order
whereas the said job/works will be /likely to be done in places covered under Employees’ State Insurance
Act,1948 (ESI) and /or the Workmen Compensation Act,1923 and /or other laws relating to the Labour
Management and Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under obligation to execute
this Safety cum Indemnity Bond before the commencement of actual execution of work.
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the guidelines as
per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether there has been
any breach of the guidelines as per Annexure-A of this bond and as to the extent of the loss, damages, costs,
charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged because of
the change in the constitution of the GETCO or for the extension of the time limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO from all
claims, actions, proceedings and risk, damage danger to any person whether belonging or not belonging to the.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation, damages any
proceedings in respect of any of its employee / workmen under the Workmen Compensation Act or any
other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order mentioned hereinabove
issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with guidelines as per Annexure-
A or terms and conditions / formalities within the meaning of Employees’ State Insurance Act,1948 (ESI)
or Workmen Compensation Act 1923 or any other laws relating to the Labour Welfare for the time being in force,
and also has not observed the safety norms in accordance with the law prevailing at the place of work/job
to the satisfaction of the GETCO, the GETCO shall have the right to stop the execution of work/job and the period
of such stoppage shall not be taken into account for the calculation of the total period of completion of work
for which the CONTRACTOR is responsible to complete the work/job and it will be deemed that discontinuance
was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any such
compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any other reason, the
GETCO shall have the right to recover the said amount from any amount receivable by GETCO or any
bank guarantee deposited or anything payable whether in connection with this contract \ or other contract by the
CONTRACTOR to the OBLIGEE.
Seal & Signature of Bidder
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of any guidelines
as per Annexure-A and terms and conditions mentioned in this Safety cum Indemnity Bond, GETCO shall have
right to terminate the contract of work issued to the CONTRACTOR .
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the compensation
and liability as per statutory requirement, contractor / agency is hereby agreed to pay the penalty amount
as given below:
Sr. no Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs. 5000/- + applicable taxes (if any)
2 Above 1 Lac to 10 Lacs Rs. 40,000/- + applicable taxes (if
3 10 Lacs to 100 Lacs Rs. 1,00,000/- + applicable taxes (if
4 More than 100 Lacs 1.0 % of contract value + applicable
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement of claims under this
Safety Cum Indemnity bond the courts in Gujarat State wherever job/work is performed or as per GETCO
norms shall have the jurisdiction to decide the rights & liabilities of the parties while adjudicating the matter
of claims under this Safety Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in Writing
on the CONTRACTOR’s application after the Contractor has discharged all his obligations under the order
mentioned hereinabove and submitted a “NO DEMAND CERTIFICATE” from the GETCO under the said order.
The Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and renewable thereof (Claim
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in addition
to And not by way of limitation or substitution for any other guarantee, indemnities Hereto before given to
the GETCO by the
CONTRACTOR and this Indemnity does not Revoke or limit such indemnities or guarantees. IN WITNESS
WHERE OF the Parties hereto have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal & Signature of Bidder
BANK GUARANTEE FOR SECURITY DEPOSIT/PERFORMANCE
NON JUDICIAL STAMP PAPER OF RS. 300/- (Stamp Paper Validity Six months)
Superintending Engineer BG. No.
Gujarat Energy Transmission Corporation Ltd Issue Date
Circle Office, Jambuva Expiry Date
Vadodara-390 014 Amount
BANK GUARANTEE FOR SECURITY DEPOSIT/PERFORMANCE
In consideration of the …………………….. [Insert name of the Supplier / Contractor / Agency, Address] who have
entered into a contract for works specified below :
L.O.I./L.O.A No._______________________dated_________with Gujarat Energy Transmission Corporation
Limited (herein after referred to as GETCO), We ………………………………. [Insert name and address of the bank
issuing the guarantee and address of the Registered office] (hereinafter referred to as “Guarantor Bank”) hereby
agrees unequivocally, irrevocably and unconditionally to pay to the GETCO at Circle Office, Jambuva forthwith on
demand in writing from the GETCO or any Officer authorized by it in this behalf, any amount up to and not exceeding
Rupees ………………………only [Insert the amount of the bank guarantee].
This Bank Guarantee shall be valid and binding on the Guarantor Bank up to ___________with a right to seek
encashment for a period up to 30 days from the said Date (Date of Expiry of BG) and shall in no event be terminable
by notice or any change in the constitution of the Bank or the term of the Agreement or by any other reasons
whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or variations or
alternations made, given, or agreed with or without our knowledge or consent, by or between parties to the respective
Our liability under this Guarantee is restricted to Rupees… (Rs. …………………………….. only). Our Guarantee
shall remain in force until ………………………………………. [Insert Date of Expiry of BG]. The GETCO shall be
entitled to invoke this Guarantee any time up to thirty (30) days of the last date of the validity of this Guarantee
i.e________ [Date of Expiry of BG + 30 days] by issuance of a written demand to invoke this guarantee.
The BANK GUARANTEE can also be presented at the ________________ [hereinafter referred to as Local Branch
at Vadodara] of the _________ (Issuing Bank of BG) for its Invocation.
The Guarantor Bank hereby expressly agrees that it shall not require any proof in addition to the written demand
from the GETCO, made in any format, raised at the above mentioned address or local branch at Vadodara of the
Guarantor Bank, in order to make the said payment to the GETCO at Vadodara. The Guarantor Bank shall make
payment hereunder on first demand without demur and without raising any restriction or conditions and
notwithstanding any objection by, …………………………… [Insert name of Contractor/Supplier/Agency] and/or any
The Guarantor Bank shall not require the GETCO to justify the invocation of this BANK GUARANTEE, nor shall the
Guarantor Bank have any recourse against the GETCO in respect of any payment made hereunder.
This BANK GUARANTEE shall be a primary obligation of the Guarantor Bank and accordingly the GETCO shall not
be obliged before enforcing this BANK GUARANTEE to take any action in any court or arbitral proceedings against
the _____( Name of party) to make any claim against or any demand on the _____________(
Name of party) or to give any notice to the ________( Name of party) or to enforce any security held by GETCO or
to exercise, levy or enforce any distress, diligence or other process against _____________( Name of party)
This BANK GUARANTEE shall be interpreted in accordance with the laws of India and the courts at Vadodara shall
have exclusive jurisdiction.
The Guarantor Bank represents that this BANK GUARANTEE has been established in such form and with such
content that it is fully enforceable in accordance with its terms as against the Guarantor Bank in the manner provided
This BANK GUARANTEE shall not be affected in any manner by reason of merger, amalgamation, restructuring,
liquidation, winding up, dissolution or any other change in the constitution of the Guarantor Bank.
The Guarantor Bank hereby agrees and acknowledges that the GETCO shall have a right to invoke this Bank
Guarantee either in part or in full, as it may deem fit.
Seal & Signature of Bidder
Any Demand made by GETCO on the Guarantor Bank or its Local Branch at Vadodara shall be conclusive and
binding not withstanding any difference between GETCO and _______[Name of Supplier/Contractor/Agency] or any
dispute pending before any Court, Tribunal, Arbitrator or any other Authority.
Notwithstanding anything contained hereinabove, our liability under this Guarantee is restricted to Rs.
………………….. (Rupees. ………………….. only) and it shall remain in force until ………………………[Insert date
of validity of BG], with an additional claim period of thirty (30) days of the last date of the validity of this Guarantee
i.e________ [Date of Expiry of BG + 30 days]. We are liable to pay the guaranteed amount or any part thereof under
this Bank Guarantee only if the GETCO serves upon us a written claim or demand.
In witness whereof the Bank, through its authorized officer, has set its hand and stamp on this …………….. day of
Name and Address.
Name and Address
Signature(s) of
Constituted Attorney with POA No. and
round seal of Bank
Signature of Two Bank Officials with their sign,
sign code nos. & round seal of Bank
Note: The banks shall be the Banks recognized/notified by the Finance Department, Government of Gujarat(GOG)
from time to time.
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. A/T no. and date to be written on every page, of Bank Guarantee & its Extension.
2. If B/G amount is more than Rs.50, 000/-, kindly take sign of two bank officer with their respective Employee
3. Valid Confirmation letter of the concerned Bank in an approved format should be attached with every
Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be beyond six
months, in any case.
5. Round seal and signature of two Bank officers should be affixed on every B/G paper.
Seal & Signature of Bidder
BANK GUARANTEE (Extension of Validity)
(To be executed on non-judicial stamp paper of Rs.300/-)
(Name and address of the Bank issuing the Bank
Guarantee extension.)
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Limited,
Transmission Circle office.
Jambuva, Vadodara - 390
EXTENSION OF BANK GUARANTEE NO.____________________ dtd.__________ of
The validity period of our subject Bank Guarantee issued in your favor on behalf of
M/s._________________________________________ is hereby extended from date__________ to
Notwithstanding anything mentioned herein before, our liability under this guarantee is restricted to an amount not
and it will remain in force till _____________________.( Date of validity / Expiry )
We are liable to pay the guarantee amount or any part thereof under this Bank Guarantee only if you serve upon us
a written claim or demand on or before dated ________________ ( Date of expiry of BG +30 Days claim period )
All other terms and conditions mentioned in the original Bank Guarantee will remain unaltered. This extension forms
an integral part of the above quoted original Bank Guarantee and may be kept thereto.
Date:___________ Round seal & signature of Two Bank Officers with
Seal & Signature of Bidder
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered in an
atmosphere of trust and respect between providers of goods and services and their users for the ultim ate
benefit of society a the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while
execution of works in indoor and outdoor systems of GETCO, the following guideline and preventive
measures are identified.
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and The method of work required T&P and
manpower should be discussed between manpower should be discussed between
GETCO supervisor, contractor’s supervisor GETCO supervisor, contractor’s supervisor
and gang leaders. and gang leaders.
Prior to execution of work a joint survey Prior to execution of work a joint survey
must be conducted by GETCO supervisor, must be conducted by GETCO supervisor,
and contractor’s supervisor for risk and contractor’s supervisor and DISCOM line
assessment. man in order to identify the following.
Clearly identify the work location, to a.HT/LT line or tap line crossing under
distinguish between the equipment that each span of line of the work.
is dead and other equipment / part that that
may be live. b. Isolation point of each line crossing.
Disconnect the equipment from supply. c.Each line crossing & isolation point
Protect against other live parts. under each span must be discussed and noted
Take special precautions when close to in maintenance register with sketch
the bare conductors/bus bar
Following safety guidelines are Contractor’s supervisor and GETCO
mandatory for all contractors operating Supervisor must ensure all isolations
in GETCO premises for Electrical, non- physically with adequate earthing
electrical & civil works. technically prior to give clearance to gang
1) The contractors must provide advance leader for taking up job.
planning of work to concerned in-charge
of substation in writing. While execution of stringing work, the
2. Before starting any work whether switch identified line crossing must be isolated / de-
yard, “permit to allow to work” must be taken energized and written clearance should . be
from control room in-charge. obtained from concerned DISCOM supervisor.
3. Utilizing Electrical / non-electrical .
equipments, safety rules must be The isolation of Tap line must be physically seen
implemented. and verified by Contractor and GETCO
4. If the work is to be carried out on Sunday
or public holiday, the necessary permission At D.O. fuse junction contractors person
must be taken in advance, requesting in should be posted to ensure that no person
writing. restore D.O. supply while work is under
5. Unwanted person including children of
labours will not be allowed at working site/ in Contractor’s supervisor must ensure that
the switchyard and in the concern officer take LCP for EHV line and
prohibited area. power line crossing.
6. Any electrical work or electrical
connections to equipment for any other
work must be carried out by certified
electrician/wiremen with adequate size of
wire through MCB as per I.E. Rule.
Seal & Signature of Bidder
- Live penal area / bus bar must be
isolated and sealed / bifurcated with
red colour tape for visible warning.
- Display Board must hang on LCP
- Transformer must be switched off
whenever and wherever contractor
and line workers are not satisfied
with isolation, earthing or any
equipment performance of GETCO, it
will be pointed out and work shall
begin only after resolution.
Contractor shall not take up job in
absence of GETCO authorized
person. All wire temporary
connection & material whenever
erection activity has any connection
and disconnection work of bus bar,
All workers / labour of contractor & supervisors All workers / labour of contractor &
must use personal protective equipment supervisors must use personal protective
(PPE) during the work like gloves, safety belt, equipment (PPE) during the work like
Safety shoes, Helmet, earthing rods, etc, duly , gloves, safety belt, Safety shoes, Helmet,
approved by GETCO. earthing rods, Live line detector etc, duly
. approved by GETCO.
The local earthing must be done at the place The local earthing must be done at the place
of work before execution of any work. of work before execution of any work.
11 kV breaker in panel must be switched off Circuit breaker opening is not an isolation
and racked out only after ensuring no voltage and isolator on either side must be opened.
in breaker and without door opening. No work during rains and cloudy weather
Transmission line activities.
1) Used of Voltage detector to ensure
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of
Local earthing of electrical equipments like
filter M/c, welding machine, testing kits etc.
Crane shall only be used for material
handling and erection. Working platform
shall only be used for work in switchyard.
Seal & Signature of Bidder
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
The Superintending .Engineer (TR)
Gujarat Energy Transmission Corporation Ltd,
Circle Office,Jambuva
We hereby acknowledge, agree and accept your A/T under reference above with terms and conditions mentioned
Designation ___________________
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S EXPERIENCE
A List of Similar jobs executed by the Contractor &Name with address of a Person whom reference can be made,
by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr. Description Value Constructi Actual Date Client Persons Principal
No of Work Of Work on Constructio Of to Features
Executed Period n Completion whom
Rs. as per Period Referenc
Contract for the e
Completion may be
of the work made
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand , as on the date of the Submission of this tender [Tenderers shall
submit the information in the Format detailed here under]
Sr. Name of Work in hand Work Tender for Remarks
Tender Cost of Anticipated Estimated Date Stipulated
Cost Remaining Date of Cost when Date or
work Completion decis period
Contractor’s Representative legible signature: ______________________
Seal of the company Date & place: _______________________________________________
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
No. &Details Experience
of position & details of
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Capacity Numbers Make Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE TENDER.
[Tenderers shall submit in the Format detailed here under]
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding in
representative of company.
visited the site.
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration Class – with valid up to
3 Partnership deed/Proprietor (Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, Statement of last three
6 Latest Solvency certificate. Rs. Lacs issued by Bank, branch
7 GST Registration No.
9 Experience certificate – As per tender
Qualification Requirement
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of opening
of the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case may be],
along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in tender mentioned under
reference along with the General/ Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender specifications (except the deviations
shown in Annexure of Technical Deviations.
3. Further, I / We also agree that additional conditions / deviations, if any, found in the tender terms &
conditions (except reference indicated under Annexure iv this tender document), our offer shall be out
rightly rejected without assigning any reason thereof.
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE GIVEN
FLAG MARKING FOR IDENTIFICATION.
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
(Strike off whichever is not applicable)
This is to declare that Mr/Ms. __________________________________, employee of GETCO at
_______________________(designation & name). OR
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Gujarat Energy Development Agency at any of its offices or its parent Department i.e. Energy
& Petrochemicals Dept., Govt. of Gujarat.
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified below in this
sheet. If there are no deviations offered, it should be clearly mentioned on this page.
Deviation offered to Chapter No, Clause No. of the Deviation offered
tender document
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical Bid- JTC-26-27-n-01.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .