| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.3 LAdmitted-Finance | +9.00% | ₹20.3 L | L1 | Admitted-Finance |
Tender Value
₹22.0 L
EMD Value
₹44,000
Closing Date
26 Jun 2026, 11:00 amClosed
DGM(CE)
Civil Department Cochin Shipyard Limited Cochin
Construction of shed for storage of used copper slag at port side of Repair Dock
2026_CSL_279942_1
Construction of roof for used copper slag storage area at port side of Repair Dock
Open Tender
Civil Works
Percentage
30 days
Cochin
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹44,000
22 Jul 2026
5 Jun 2026
29 Jun 2026
5 Jun 2026
26 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing coment concrete work manually/ by mechanical means and stacking of steel bars if any and disposal of unserviceable material as per direction of Engineer - in-charge. | 8 | m3 | 2,547 | ₹20,376 |
| 2 | Earthwork excavation by mechanical means (Hydraulic excavator)/manual means in in all kinds of soil and in any plan dimension, including dressing of sides and ramming of bottoms for all lift, including getting out the excavated soil and disposal of surplus excavated soil within 5km (Outside CSL-in Cheriakadavantra) as per the direction of Engineer-in-Charge. | 29 | m3 | 299 | ₹8,671 |
| 3 | Back filling the available excavated earth (excluding rock) in trenches, sides of foundations etc. in layers consolidating each deposited layer by ramming and watering as per the direction of Engineer-in-Charge | 27 | m3 | 200 | ₹5,400 |
| 4 | Providing and laying in position plain cement concrete 1:3:6 (1 cement: 3 coarse sand:6 20mm nominal size coarse aggregate) including mixing, laying, compacting, all labour charges, cost and conveyance, handling, unloading, storing of all materials including cost of cement,cost of steel form work etc. complete as directed by the Engineer-in-Charge. | 6 | m3 | 9,604 | ₹57,624 |
| 5 | Supplying and laying TMT rebars (550 D) of preferred brands for R.C.C work including cost and conveyance of all materials, labour, straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 0.5 | Tonne | 1,05,927 | ₹52,963.5 |
| 6 | Providing and laying R.C.C 1:1½:3 using 20mm nominal size aggregate upto plinth level including cost and conveyance of all materials, labour for mixing, laying, consolidating, curing, cost of cement, cost of steel formwork, hire charges for tools and plants, other incidentals etc.complete but excluding cost and fabrication charge of reinforcement. | 7 | m3 | 12,122 | ₹84,854 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
TD.pdf
Tender Documents • 1.07 MB
GCC.pdf
Tender Documents • 1.22 MB
BOQ_326703.xls
BOQ • 0.34 MB
Corrigendum-1.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .