Executive Engineer, Anand Irrigation Division Anand.
Constructing Compound Wall of Kathana section colony at Kathana under the jurisdiction of Bhadran Irrigation Sub Division, Borsad
353376
10 of 2026-2027
Open
Miscellaneous Works
Works
Anand
13 documents required · 11 mandatory · 2 optional
₹1,500
Executive Engineer Anand Irrigation Division Anand
₹28,000
8 Oct 2026
8 Oct 2026
8 Oct 2026
22 Oct 2026
8 Oct 2026
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft &
hard murrum etc. in dry condition including
depositing the excavated stuff in uniform layers
1 in banks or as and where directed etc. complete 250.00 Cum 107.80
for lead upto 500 m and all lift.(BY MACHINERY)
Including dewatering.
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and
crushed aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks
centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete Without Dewatering and excluding 158.00 Cum 3935.00
cost of steel reinforcement.
(A) For Foundation concrete / General purpose
(c) C. C. Nominal Mix, M-15 and MSA-20 mm
Providing and laying burnt brick masonary for
super structure with ordinary portland cement
mortar 1:5 proportion including providing
scaffolding racking out joints curing etc.
complete for all leads and lifts.(Conventional
Providing cement plaster in thickness and
proportion as under including , smooth finishing,
4 curing, scaffolding etc.complete for all leads and 1400.00 Sq. m. 193.20
lifts. Cement Mortar 1:૩ Proportion.(b)12 mm
Providing & Placing in position reinforcement
bars including cutting, bending, welding joints
5 where necessary, hooking etc. complete as per 68.7837 Qtl 7194.00
drawing for all lead and lifts. (b) TMT
Wall painting (two coats) with plastic emulsion
paint of approved brand and manufacture on
undecorated wall surface to give an given an
even shade including throughly brushing the
surface free from mortar dropings and other
foreign matter and sand pappered smooth and
Extra over item above for every subsequent coat
of wall painting with plastic emulsion paint of
approved brand.
Providing and fixing 110 mm diameter p.v.c
7 pipe(6 Kgf/sqcm) water spout with necessary 49.00 Rmt 369.20
iron gratting as per design
New / Repairing of steel gate including
providing basic steel material; M.S. Shaft plate,
angles, channels etc. incl. fabrication
transporting to site & erection and painting etc.
complete. providing & fixing new main Gate at
8 Kathana seetion mahi Colony with 50 mm* 380.00 Kg 127.20
50mm with 10 mm dia steel road every 75 mm
we Champ , fixtures, oil paint incluaing
redoxide in two coat & as per direeted by
Engineer incharge
Providing and fixing 1 mt Hight concertina coil
fencing with punched tape concertina coil
mm dia 10 mt openable length having 50 no
rounds per 6 mt length, upto 1mt height of Top
of wall with new angle iron (50mm x50mm
x5mm )requird shaped As per Directed
Engeenier in charge. placed 2.4mt or 3.00mt
apart and with 4 horizontal R.B.T. reinforced
9 barbed wire(3 mm) , stud tied with G.I. staples 294.00 Rmt 554.38
and G.I. clips to retain horizontal, including
necessary bolts or G.I.barbed wire tied to angle
iron, all complete as per direction of Engineer-in-
charge, with reinforced barbed tape
(R.B.T.)/Spring core (2.5 mm thick) and weight
43.478 gm/meter at compound wall
Rs. Twenty Seven lacs Eighty thousand Three Hundred Ninety One & Thirty Five Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should be written in
Estimated amount Put to tender Estimated amount Put to tender
Deduct …………………….% Below Add ……………. % above
In Words In Words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC
10/2017 Cement Consumption /16/CDate:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
4 there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate i.e. 5483.37/MT of original item at the rate of input rate mentioned in all the tender.
Signature of contractor
Deputy Executive Engineer Divisional Accountant
Bhadran Irrigation Sub Division Anand Irrigation Division
Borsad Anand
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice-10 of 2026-27 Online.pdf
1 Front Page (4).pdf
2 Certificate (5).pdf
3.Notice Inviting online Tender (1).pdf
4.SBD-Document.pdf
pol.pdf
Standard Techanical Specification of MIC.pdf
price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .