Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC | ₹12.6 L | L1 | Accepted-AOC Agreement No 07/EE/2026-27 |
| 2 | L2₹13.0 L+₹33,731.26 (2.67%)Rejected-Finance VILLAGE GONNAN GARH DISTRICT AMROHA UTTAR PRADESH | AMROHA | UTTAR PRADESH | ₹13.0 L+₹33,731.26 (2.67%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S SHIV KUMAR CONTRACTOR L2 | JAGDESH PRASAD L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil for structure including all lead and lift as per site requirement and proper disposal of excavated earth as directed by engg in charge. | 446.44 | Cum. | 65 ₹29,018.6 Lowest | 65 ₹29,018.6 Lowest |
| 2.00 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 79.61 | Cum. | 245 ₹19,504.45 Lowest | 245 ₹19,504.45 Lowest |
| 3.00 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 22.83 | Sqm. | 5,988 ₹1,36,706.04 Lowest | 5,988 ₹1,36,706.04 Lowest |
| 4.00 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 196.11 | Sqm. | 5,350 ₹10,49,199.2 | 5,178 ₹10,15,467.94 Lowest |
| 5.00 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 5.76 | MT | 6,467 ₹37,249.92 Lowest | 6,467 ₹37,249.92 Lowest |
| 6.00 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 226 | Cum. | 105 ₹23,730 Lowest | 105 ₹23,730 Lowest |
Tender Value
₹13.3 L
EMD Value
₹26,500
Closing Date
6 Jun 2026, 4:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 08 CONSTRUCTION OF LATHER MINOR FROM KM 0.073 TO KM 0.186 OF MGC STAGE-II
2026_UPIDC_1151892_13
01/EE2026-27
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹26,500
18 Jul 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil for structure including all lead and lift as per site requirement and proper disposal of excavated earth as directed by engg in charge. | 446.44 | Cum. | - | - |
| 2 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 79.61 | Cum. | - | - |
| 3 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 22.83 | Sqm. | - | - |
| 4 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 0.8 | Sqm. | - | - |
| 5 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 5.76 | MT | - | - |
| 6 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 226 | Cum. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
lot08.pdf
Tender Documents • 2.99 MB
BOQ_2166050.xls
BOQ • 0.27 MB
Corrigendum.pdf
Additional Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .