Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC 3 165 1A KAMARAJ NAGAR KANGAYAMPALAYAM SULUR COIMBATORE TAMIL NADU 641 401 | COIMBATORE | COIMBATORE | TAMIL NADU | 641401 | ₹14.9 L | L1 | Accepted-AOC Lowest Offer |
| 2 | L2₹15.0 LRejected-Finance | ₹15.0 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹20.3 LRejected-Finance | ₹20.3 L | L3 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | Vishnu Infrastructures L1 | Bharathi Construction L2 | KUMARAN KUDIL CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | EARTH WORK EXCAVATION AND DISPOSE OFF UNWANTED EARTH WITHIN THE PLANT PREMISES, UNLOADING, SPREADING, LEVELLING TO A LEAD OF 2KM WITH NECESSARY DE WATERING ARRANGEMENT ETC., | 40 | CUM | 90.6 ₹3,624 | 250 ₹10,000 | 265 ₹10,600 |
| 2.00 | PROVIDING AND LAYING OF "WET MIX" MACADAM BASE COURSE OF 100 MM THICK COMPACTED THICKNESS WITH STONE AGGREGATE AND GRANULAR POWDER OF QUALITY SIZE WITH MORTAR AND COMPACTION WITH VIBRATING ROLLER OF 80 TO 100 KN STATIC WEIGHT WITH SLOPE, GRADIENT AND SAFETY AS PER INSTRUCTION OF ENGINEER INCHARGE. | 40 | CUM | 2,752 ₹1.1 L | 2,500 ₹1 L | 2,675 ₹1.1 L |
| 3.00 | PROVIDING AND LAYING TACK COAT OVER WBM/WMM SURFACE (TREATED WITH PRIMER) USING 2.50KG OF BITUMEN EMULSION (RS1) PER 10 SQM AFTER THOROUGH CLEANING THE EXISTING SURFACE FOR PREPARATORY TO ANOTHER BITUMINOUS CONSTRUCTION OVER IT INCLUDING COST OF MATERIAL, LABOUR CHARGES, RENTALS FOR MACHINERY, FUEL AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE AS DIRECTED BY ENGINEER INCHARGE. | 360 | SQM | 19.79 ₹7,124.40 | 80 ₹28,800 | 85 ₹30,600 |
| 4.00 | BITUMINOUS MACADAM OF 50 MM THICKNESS WHICH WORK SHALL CONSIST OF CONSTRUCTION, IN A SINGLE COURSE, OF COMPACTED CRUSHED AGGREGATES PREMIXED WITH BITUMINOUS BINDER 60/70 GRADE AT THE RATE OF 3.5 PERCENT BY WEIGHT OF THE TOTAL MIX, TO SEVE AS BASE / BINDER COURSE, IN ACCORDANCE WITH THE REQUIREMENT OF THE SPECIFICATIONS AND IN CONFORMITY WITH THE DRAWING OR AS DIRECTED BY THE ENGINEER USING CENTRAL MIXING PLANT (CMP) AND PAVER FINISHER. | 18 | CUM | 11,222 ₹2.0 L | 12,560 ₹2.3 L | 13,440 ₹2.4 L |
| 5.00 | PROVIDING AND LAYING TACK COAT OVER EXISTING BT SURFACES USING 2 KG OF BITUMEN EMULSION (RS1) PER 10 SQM AFTER THOROUGH CLEANING THE EXISTING SURFACE FOR PREPARATORY TO ANOTHER BITUMINOUS CONSTRUCTION OVER IT INCLUDING COST OF MATERIALS, LABOUR CHARGES, RENTALS OF MACHINERY, FUEL AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE AS DIRECTED BY ENGINEER INCHARGE. | 3,000 | SQM | 28 ₹84,000 | 50 ₹1.5 L | 53 ₹1.6 L |
| 6.00 | PROVIDING AND LAYING BITUMINOUS CONCRETE TO 30MM COMPACTED THICKNESS USING 0.13CUM OF 19.00-9.50MM, 0.17CUM OF 9.50- 2.36MM AND 0.26CUM OF 2.36 AND BELOW WITH 50.30KGS OF VG40 BITUMEN FOR PREMIXING PER 10SQM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO CMP SITE, HEATING THE BITUMEN AND AGGREGATE TO REQUIRED TEMPERATURE AND MIXING THEM IN REQUIRED TEMPERATURE IN CENTRAL HOT MIX PLANT20- 30 TON CAPACITY, CONVEYING THE MIX BY TIPPER TRUCKS TO PAVER SITE, SPREADING THE MIX TO UNIFORM THICKNESS OF 40MM WITH MECHANICAL PAVER TO THE SPECIFIED GRADES AND CROSS SECTIONS AND CONSOLIDATED BY 8-10 TONE VIBRATORY ROLLER TO THE REQUIRED DENSITY ETC., INCLUDING LABOUR FOR ATTENDING TOP OVER TO SITE ETC., INCLUDING HIRE CHARGE SAND FUEL CHARGES FOR 20- 30T CMP WITH BITUMEN BOILER, TIPPER TRUCKS, PAVER FINISHER, VIBRATORY ROLLER AND ALL OTHER TOOLS AND PLANT REQUIRED, INCLUDING FUEL AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE AS PER SPECIFICATION USING CMP AS DIRECTED BY ENGINEER INCHARGE. | 90 | CUM | 11,517 ₹10.4 L | 13,900 ₹12.5 L | 14,800 ₹13.3 L |
| 7.00 | PROVIDING AND LAYING OF HOT APPLIED THERMOPLASTIC COMPOUND 2.5MM THICK INCLUDING REFELECTORISING GLASS BEADS @250 GMS PER SQM AREA, THICKNESS OF 2.5MM IS EXCLUSIVE OF SURFACE APPLIED GLASS BEADS AS PER IRC 35. THE FINISHED SURFACE TO BE LEVEL, UNIFORM AND FREE FROM STREAKS AND HOLES ETC., COMPLETE AS PER MORT&H SPECIFICATION NO.803 AS DIRECTED BY ENGINEER IN CHARGE. | 100 | SQM | 50 ₹5,000 | 850 ₹85,000 | 906 ₹90,600 |
| 8.00 | HIRING OF JCB BACK HOE EXCAVATOR/LOADER WITH OPERATOR FOR ALL TYPES OF CIVIL WORKS. | 20 | HR | 1,400 ₹28,000 | 1,200 ₹24,000 | 1,272 ₹25,440 |
| 9.00 | PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL AND STRUCTURAL WORKS – HELPER FOR MASON / PLUMBER / CARPENTER / FITTER / WELDER, ETC., | 25 | MD | 1,200 ₹30,000 | 1,100 ₹27,500 | 1,166 ₹29,150 |
| Sl.NoBidder Name | ||||||
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
13 Dec 2025, 3:00 pmClosed
General Manager (Projects and Energy)
PMD Office, TNPL Unit I, Kagithapuram.
Renewal of Bituminous road (265mtr length) around DIP godown and Mill wide patch work Phase I at TNPL Unit I
2025_TNPL_629135_1
TNPL/PMD/CIV/UNIT I/252613006256
Open Tender
Civil Works
30 days
TNPL Unit I, Kagithapuram, Karur District
As per Invitation for Bids of Bid Document
5 documents required · 5 mandatory
₹0
₹42,000
2 Jan 2026
5 Dec 2025
15 Dec 2025
5 Dec 2025
13 Dec 2025
5 Dec 2025
Amount
EARTH WORK EXCAVATION AND DISPOSE OFF UNWANTED EARTH WITHIN THE PLANT PREMISES, UNLOADING, SPREADING, LEVELLING TO A LEAD OF 2KM WITH NECESSARY DE WATERING ARRANGEMENT ETC.,
PROVIDING AND LAYING OF "WET MIX" MACADAM BASE COURSE OF 100 MM THICK COMPACTED THICKNESS WITH STONE AGGREGATE AND GRANULAR POWDER OF QUALITY SIZE WITH MORTAR AND COMPACTION WITH VIBRATING ROLLER OF 80 TO 100 KN STATIC WEIGHT WITH SLOPE, GRADIENT AND SAFETY AS PER INSTRUCTION OF ENGINEER INCHARGE.
PROVIDING AND LAYING TACK COAT OVER WBM/WMM SURFACE (TREATED WITH PRIMER) USING 2.50KG OF BITUMEN EMULSION (RS1) PER 10 SQM AFTER THOROUGH CLEANING THE EXISTING SURFACE FOR PREPARATORY TO ANOTHER BITUMINOUS CONSTRUCTION OVER IT INCLUDING COST OF MATERIAL, LABOUR CHARGES, RENTALS FOR MACHINERY, FUEL AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE AS DIRECTED BY ENGINEER INCHARGE.
BITUMINOUS MACADAM OF 50 MM THICKNESS WHICH WORK SHALL CONSIST OF CONSTRUCTION, IN A SINGLE COURSE, OF COMPACTED CRUSHED AGGREGATES PREMIXED WITH BITUMINOUS BINDER 60/70 GRADE AT THE RATE OF 3.5 PERCENT BY WEIGHT OF THE TOTAL MIX, TO SEVE AS BASE / BINDER COURSE, IN ACCORDANCE WITH THE REQUIREMENT OF THE SPECIFICATIONS AND IN CONFORMITY WITH THE DRAWING OR AS DIRECTED BY THE ENGINEER USING CENTRAL MIXING PLANT (CMP) AND PAVER FINISHER.
PROVIDING AND LAYING TACK COAT OVER EXISTING BT SURFACES USING 2 KG OF BITUMEN EMULSION (RS1) PER 10 SQM AFTER THOROUGH CLEANING THE EXISTING SURFACE FOR PREPARATORY TO ANOTHER BITUMINOUS CONSTRUCTION OVER IT INCLUDING COST OF MATERIALS, LABOUR CHARGES, RENTALS OF MACHINERY, FUEL AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE AS DIRECTED BY ENGINEER INCHARGE.
PROVIDING AND LAYING BITUMINOUS CONCRETE TO 30MM COMPACTED THICKNESS USING 0.13CUM OF 19.00-9.50MM, 0.17CUM OF 9.50- 2.36MM AND 0.26CUM OF 2.36 AND BELOW WITH 50.30KGS OF VG40 BITUMEN FOR PREMIXING PER 10SQM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO CMP SITE, HEATING THE BITUMEN AND AGGREGATE TO REQUIRED TEMPERATURE AND MIXING THEM IN REQUIRED TEMPERATURE IN CENTRAL HOT MIX PLANT20- 30 TON CAPACITY, CONVEYING THE MIX BY TIPPER TRUCKS TO PAVER SITE, SPREADING THE MIX TO UNIFORM THICKNESS OF 40MM WITH MECHANICAL PAVER TO THE SPECIFIED GRADES AND CROSS SECTIONS AND CONSOLIDATED BY 8-10 TONE VIBRATORY ROLLER TO THE REQUIRED DENSITY ETC., INCLUDING LABOUR FOR ATTENDING TOP OVER TO SITE ETC., INCLUDING HIRE CHARGE SAND FUEL CHARGES FOR 20- 30T CMP WITH BITUMEN BOILER, TIPPER TRUCKS, PAVER FINISHER, VIBRATORY ROLLER AND ALL OTHER TOOLS AND PLANT REQUIRED, INCLUDING FUEL AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE AS PER SPECIFICATION USING CMP AS DIRECTED BY ENGINEER INCHARGE.
PROVIDING AND LAYING OF HOT APPLIED THERMOPLASTIC COMPOUND 2.5MM THICK INCLUDING REFELECTORISING GLASS BEADS @250 GMS PER SQM AREA, THICKNESS OF 2.5MM IS EXCLUSIVE OF SURFACE APPLIED GLASS BEADS AS PER IRC 35. THE FINISHED SURFACE TO BE LEVEL, UNIFORM AND FREE FROM STREAKS AND HOLES ETC., COMPLETE AS PER MORT&H SPECIFICATION NO.803 AS DIRECTED BY ENGINEER IN CHARGE.
HIRING OF JCB BACK HOE EXCAVATOR/LOADER WITH OPERATOR FOR ALL TYPES OF CIVIL WORKS.
PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL AND STRUCTURAL WORKS – HELPER FOR MASON / PLUMBER / CARPENTER / FITTER / WELDER, ETC.,
Bidder Name
Amount in Words
Vishnu Infrastructures (BID ID -1532998)
KUMARAN KUDIL CONSTRUCTIONS (BID ID -1532547)
Bharathi Construction (BID ID -1531476)
Bharathi Construction (BID ID -1531476)
KUMARAN KUDIL CONSTRUCTIONS (BID ID -1532547)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BidDocument_252613006256.pdf
Tender Documents • 5.74 MB
BOQ_752321.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid