| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC AT DANDASAI WARD NO 11 CHAKRADHARPUR | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹4,636.25 (0.04%)Rejected-Finance MANOHARPUR | MANOHARPUR | ₹1.2 Cr+₹4,636.25 (0.04%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical THUMKA MOHALLA WARD NO 10 GALI NO 01 CHAKRADHARPUR DIOT WEST SINGHBHUM | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical SACHCHAK JAMSHEDPUR | JAMSHEDPUR | EAST SINGHBHUM | JHARKHAND | - | - | Rejected-Technical Non Responsive |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
14 Mar 2026, 5:00 pmClosed
Executive Engineer RDSD Chaibasa
Office of the Executive Engineer RDSD Chaibasa
Construction of PCC road Vill Bhujusai Pradhan toli Panchayat Hatnatotang under Block Chakradharpur
2026_RDSPL_110908_1
RDD/SD/CHAIBASA/13/25-26_Gr-03
Open Tender
Civil Works
Percentage
180 days
Chakradharpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.3 L
17 Jul 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
14 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201 SOR Item No. 2.02 | - | Ha | 19,760.3 | - |
| 2 | Compacing Original ground Supporing Subgrade (Loosening of the ground upto a level of 500 mm below the Subgrade level, watered graded and compected in layers tomeet requirement of tables 300.2 for subgread construction as per Technical Specification
S.O.R. Item No. 3.20 Case I | - | M3 | 52.6 | - |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with 1000M Lead as per Technical Specification Clause 303.1
S.O.R. Item No. 3.18 | 1,384.5 | M3 | 131.3 | ₹1,81,784.85 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
With Grading-I Material
S.O.R. Item No. 4.01 B (i)GSB Grading -l | 594.75 | M3 | 1,437.6 | ₹8,55,012.6 |
| 5 | Cement Concret Pavment (Construction of PCC M 20 in road construction using batching plant transit mixer and manual placing as per drawig and technical specification . Expansion joint @ 15.0M SOR ITEM NO 12.08 CASE(ii) ( B) P.C.C- M20 | 793 | M3 | 4,153.5 | ₹32,93,725.5 |
| 6 | Earth work in excavation in Foundation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50m including all lift,leveling ramming the foundation | 331.35 | M3 | 151.82 | ₹50,305.56 |
| 7 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) 5.1.10 | 36.45 | M3 | 589.51 | ₹21,487.64 |
| 8 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. 5.6.3 | 362.45 | M3 | 330.34 | ₹1,19,731.73 |
| 9 | Providing and laying in position specified grade of reinforcement cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -all work up to plinth level: (1:1.5:3) (1 cement : 1.5 coarse sand (zone III ) : 3 graded stone aggregate 20 mm nominal size ). 5.3.9.1 | 220.9 | M3 | 5,218 | ₹11,52,656.2 |
| 10 | Centering and shuttering including strutting , propping etc. and removal of form for foundation , footing , bases of columns, etc for mass concrete. 5.3.17 | 1,812.27 | M2 | 194.5 | ₹3,52,486.52 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
Tender.pdf
Tender Documents • 1.43 MB
BOQ_149886.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .