Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC 508 1ST FLOOR DR MUKHERJEE NAGAR DELHI 110009 | NORTH | DELHI | 110009 | 1 | Accepted-AOC L1 bidder | |
| 2 | 2₹9.2 L+₹16,389 (1.81%)Rejected-Finance A 20 COMMERCIAL COMPLEX DR MUKHERJEE NAGAR KINGSWAY CAMP DELHI 110009 | NORTH | DELHI | 110009 | 2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical 1018 DR MUKHARJEE NAGAR DELHI 09 | - | Rejected-Technical Technical bid NOT accepted by competent authority |
Tender Value
₹9.2 L
EMD Value
₹18,350
Closing Date
27 May 2022, 2:00 pmClosed
Ex. Engineer (Elect)/CSPZ
OFFICE OF THE EX. ENGINEER (ELECT)-I UNDER GROUND CAR PARKING ASAF ALI ROAD, DELHI-110002
Provision of Temporary Lighting Arrangement and D.G. set for Haj Pilgrims Camp, Opp. Haj Manjil, Turkman Gate Under City S.P.Zone. W. No.88
2022_NDMC_117095_1
05/MWEEE-I/2022-23/TC
Open Tender
Electrical Works
Item Rate
20 days
CSPZ
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹18,350
14 Jul 2022
26 May 2022
27 May 2022
26 May 2022
27 May 2022
26 May 2022
Amount
Hire charges I/c erection & dismantling of following sizes alum. conductor single core cable on wooden cleats for 20 days including maintenance: 2 x 10 to 16 sqmm for 1st day
2 x 10 to 16 sqmm for next 10 days
2 x 10 to 16 sqmm for next 9 days
4 x 16 to 4 x 35 sqmm for 1st day
4x16 to 4x35sqmm for next 10 days
4x16 to 4x35sqmm for next 9 days
Hire charges I/c erection & dismantling of steel tubular pole for 6 mtr. length duly painted with white paint for 20 days: For 1st day
For next 10 days
For next 9 days
Hire charges I/c erection & dismantling of 60watt LED flood light fitting including maintenance for 20 days. For 1st day
For next 10 days
For next 9 days
Hire charges I/c erection & dismantling of 90 LED flood light fitting including maintenance for 20 days. For 1st day
For next 10 days
For next 9 days
Hire charges i/c erection & dismantling of distribution board complete with 200 Amp TP&N main switch, indicator 3 nos., temporary earthing as required including CTC meter space as required for 20 days.
Hire charges I/c erection & dismantling of 15 LED watt lamp with holder lighting in ground including maintenance for 20 days. For 1st day
For next 10 days
For next 9 days
Hire charges I/c erection & dismantling plug socket with 2 Nos. switches and socket 15 amp. Indicator lamps on wooden board including maintenance for 20 days. For 1st day
For next 10 days
For next 9 days
Hire, dismantling & commissioning, operation & dismantling of 62 KVA canopy type (sound proof) DG set without diesel with changeover switch for 20 days etc. as required.(A) For Ist days
For next 19 days
Charges for consumption of diesel oil for 62 KVA DG set as per actual consumption at site (for sound proof DG set) for 20 days.
ARPIT ELECTRIC CO.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .