| 1 | L1₹7.3 LAccepted-AOC | ₹7.3 L | L1 | Accepted-AOC L1, LOWEST |
| 2 | L2₹7.7 L+₹37,559.13 (5.14%)Rejected-AOC KERALA | PATHANAMTHITTA | KERALA | 685533 | ₹7.7 L+₹37,559.13 (5.14%) | L2 | Rejected-AOC Higher rate and hence the tender is Not admitted |
| 3 | L3₹7.7 L+₹38,810.93 (5.32%)Rejected-Finance | ₹7.7 L+₹38,810.93 (5.32%) | L3 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | VAEGHESE P M L2 | SAJAN B L3 | JOSEPH M J L1 |
|---|---|---|---|---|---|---|
| 1.00road concrete | ||||||
| 1.00 | OD370950/2025-2026:Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm
deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil | 455 | per sqm | 33.82 ₹15,388.1 | 35 ₹15,925 | 32.15 ₹14,628.25 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 68.25 | cum | 8,798.66 ₹6,00,508.55 | 8,800 ₹6,00,600 | 8,368.28 ₹5,71,135.11 Lowest |
| 1.00 | OD371465/2025-2026:Supplying and fixing name board with engraving letters as per
direction of Engineer in charge | 1 | each | 2,783 ₹2,783 | 2,800 ₹2,800 | 2,646 ₹2,646 Lowest |
| 2.00Retaining wall | ||||||
| 2.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 8.6 | cum | 866.48 ₹7,451.73 | 870 ₹7,482 | 824.1 ₹7,087.26 Lowest |
| 2.00 | OD371427/2025-2026:DRY RUBBLE MASONRY with hard stone,including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 24.08 | cum | 5,688.32 ₹1,36,974.75 | 5,700 ₹1,37,256 | 5,410 ₹1,30,272.8 Lowest |
| 2.00 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 0.54 | cum | 8,451.8 ₹4,547.07 | 9,000 ₹4,842 | 8,038.38 ₹4,324.65 Lowest |
Tender Value
₹8.3 L
EMD Value
₹20,860
Closing Date
7 Aug 2026, 6:00 pmClosed
Block Development Officer Ranni Block
Ranni (PO), Pathanathitta PIN 689672 Phone 04735 227478
MLASDF 2026-26 ANNAN PODIYANPADI ROAD IN CHITTAR GP
2026_CRD_863184_3
RNIBP/A2/01/2026
Open Tender
Civil Works - Roads
Item Rate
120 days
CHITTAR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,840
Yes
₹20,860
Yes
12 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1road concrete | |||||
| 1.001 | OD370950/2025-2026:Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm
deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil | - | per sqm | - | - |
| 1.002 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | - | cum | - | - |
| 1.003 | OD371465/2025-2026:Supplying and fixing name board with engraving letters as per
direction of Engineer in charge | - | each | - | - |
| 2Retaining wall | |||||
| 2.001 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 1 | cum | - | - |
| 2.002 | OD371427/2025-2026:DRY RUBBLE MASONRY with hard stone,including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 1 | cum | - | - |
| 2.003 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1460201.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.24 MB
Tendernotice_3.pdf
PDF • 0.24 MB
ANNANPODIPAG.pdf
Tender Documents • 0.25 MB
ANNANPODISBD.pdf
Tender Documents • 0.96 MB
ANNANPODIAFFI.pdf
Tender Documents • 0.23 MB
ANNANPODIFOT.pdf
Tender Documents • 0.24 MB
BOQ_1460201.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .