| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.5 LAdmitted-Fee/PreQual/Technical/Finance AT MALKERA KATRAS DIST DHANBAD | KATRAS | DHANBAD | JHARKHAND | -0.03% | ₹34.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹34.6 L+₹1,036.67 (0.03%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹34.6 L+₹1,036.67 (0.03%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹34.6 L
EMD Value
₹70,000
Closing Date
16 Sept 2026, 5:00 pmClosed
Exe Eng R D Spl Div, Dhanbad
Exe Eng R D Spl Div, Dhanbad
Construction of Drain and PCC Road At Maheshpur Upar Basti Under Maheshpur 2 Panchayat, Block Baghmara, Dist Dhanbad
2026_RDSPL_118378_1
30/2026-27/RDSD/EE/Dhanbad/2nd Call/Gr. 01
Open Tender
Civil Works
Percentage
180 days
Baghmara
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹70,000
18 Sept 2026
8 Sept 2026
18 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 20.7 | m3 | 131.3 | ₹2,717.91 |
| 2 | Granular Sub-Base with Graded Material (Table:- 400-1)Plant Mix MethodConstruction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.Rate per cum for grading-I Material | 13.73 | m3 | 1,579.7 | ₹21,681.38 |
| 3 | Cement Concrete PavementConstruction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 132.54 | m3 | 5,360.4 | ₹7,10,477.47 |
| 4 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately | 53 | m3 | 442.6 | ₹23,457.8 |
| 5 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | 273.38 | m3 | 316.2 | ₹86,441.18 |
| 6 | Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed , placed in foundation and compacted by vibration including curing for 14 days | 30.38 | m3 | 3,376.1 | ₹1,02,549.04 |
| 7 | Plain/reinforced cement concrete in Substructure complete as per drawing and technical specificationsRCC Grade M20 | 160.99 | m3 | 4,499.7 | ₹7,24,397.7 |
| 8 | Supplying ,fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specification | 9.82 | mt | 87,394.8 | ₹8,57,867.36 |
| 9 | DI Pipe providing and supplying ISI mark centrifugally cat (spun ) Ductile Iron pipes K-9 &K-10 Classificaton | 30 | M | 1,846.1 | ₹55,383 |
| 10 | Carriage of Materials Cement- | 115.85 | mt | 549.1 | ₹63,613.24 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
SBD30Gr01.pdf
Tender Documents • 3.77 MB
BOQ_160078.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .