| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹34.0 L+₹4.2 L (14.0%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹37.8 L+₹8.0 L (26.7%)Rejected-Finance | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹37.8 L+₹8.0 L (26.8%)Rejected-Finance | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹38.2 L+₹8.4 L (28.2%)Rejected-Finance 0000 UNNAMED ROAD GAJIYA KANTIT VINDHYACHAL MIRZAPUR UTTAR PRADESH 231307 | MIRZAPUR | UTTAR PRADESH | 231307 | L5 | Rejected-Finance Not Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
22 Apr 2020, 6:00 pmClosed
GE KAPURTHALA
GE KAPURTHALA
Outsourcing services of water supply installations, sewage installations and DG set installation at Old Mil Stn Kapurthala and Complaint Cell at New Mil Stn Kapurthala and MAND under GE Kapurthala
2020_MES_336864_1
GE KPT-84/2019-20
Open Tender
Miscellaneous Services
Item Rate
335 days
KAPURTHALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE KAPURTHALA
₹98,000
Yes
13 Jun 2020
31 Mar 2020
24 Apr 2020
31 Mar 2020
22 Apr 2020
10 Apr 2020
Amount
Outsourcing Services for operation , maintainance and documentations of water supply installations at UPPER AREA PUMP HOUSE at Old Mil Stn Kapurthala round the clock for 03 Shifts Per Day (Each shift of eight hours each) including sunday/holiday, with one operator of appropriate category of industrial person for each pump house to operate Submersible pump set / Turbine pump set / Centrifugal pump set / Chlorine plant / Bleaching dozer / DG Set / water supply distribution sluice valves as per direction given time to time by the Engineer in charge / Pump Panel installed in Pump House to work as per daily orders given and complete all as specified and directed by the Engineer in Charge.
Outsourcing Services for operation , maintainance and documentations of water supply installations at ZOZILA PUMP HOUSE at Old Mil Stn Kapurthala round the clock for 03 Shifts Per Day (Each shift of eight hours each) including sunday/holiday, with one operator of appropriate category of industrial person for each pump house to operate Submersible pump set / Turbine pump set / Centrifugal pump set / Chlorine plant / Bleaching dozer / DG Set / water supply distribution sluice valves as per direction given time to time by the Engineer in charge / Pump Panel installed in Pump House to work as per daily orders given and complete all as specified and directed by the Engineer in Charge.
Outsourcing Services for operation , maintainance and documentations of water supply installations at LOWER AREA PUMP HOUSE at Old Mil Stn Kapurthala round the clock for 03 Shifts Per Day (Each shift of eight hours each) including sunday/holiday, with one operator of appropriate category of industrial person for each pump house to operate Submersible pump set / Turbine pump set / Centrifugal pump set / Chlorine plant / Bleaching dozer / DG Set / water supply distribution sluice valves as per direction given time to time by the Engineer in charge / Pump Panel installed in Pump House to work as per daily orders given and complete all as specified and directed by the Engineer in Charge.
Outsourcing Services for operation , maintainance and documentations of water supply installations at MAND PUMP HOUSE AT at Mil Stn Mand area under GE kapurthala round the clock for 03 Shifts Per Day (Each shift of eight hours each) including sunday/holiday, with one operator of appropriate category of industrial person for each pump house to operate Submersible pump set / Turbine pump set / Centrifugal pump set / Chlorine plant / Bleaching dozer / DG Set / water supply distribution sluice valves as per direction given time to time by the Engineer in charge / Pump Panel installed in Pump House to work as per daily orders given and complete all as specified and directed by the Engineer in Charge.
Outsourcing Services for operation , maintainance and documentations of DG Set 100 KVA Near 861 Officers Mess at New mil stn Kapurtala under GE Kapurthala round the clock for 03 Shifts Per Day (Each shift of eight hours each) including sunday/holiday, with one operator of appropriate category of industrial person to operate DG Set including periodical maint & up keep of installations for keeping them in perfect working conditions all as directed by Engineer- in-Charge. The DG Set shall be run on failure of PSPCL supply .
Outsourcing of complaint cell/Main receving station at New Mil Stn Kapurthala with one electrician and one assistant to attend HT/LT fault and 'No light' complaints in New Mil Stn Kapurthala area as directed and all as per day to day task assigned by concern JE & Engineer-in-Charge in two shifts ( Shift No-1 :- 9.00 Hrs To 05.00 Hrs and Shift No-2 :- 22.00 Hrs To 06.00 Hrs) including sunday and holiday.NOTE :- The min qualification for the person deployed as Electrician shall of be technical qualification ITI pass in appropriate field trade and assistant having two year experience in the appropriate field trade.
Supply only calcium hypochlorite calcium based granular suitable for drinking water treatment; 65% chlorine content, first quality in 45 Kg plastic drum packing, complete all as specified and as directed by Engineer-in-Charge. Make : Shree Rayalaseema Hi-strength Hpyo Ltd (Brand Name Aquafit) or equivalent make approved by Engineer-in-Chief's Branch. Note : (i) Calcium hypo chorite shall be ordered by the Engineer-in-Charge on requirement bases i.e fortnightly or monthly, but not in one go. (ii) Test Certificate of Manufacturer shall be provided by the contractor on procurement of material alongwith purchase vouchers. (iii) Before putting the claim for payment, contractor shall produce purchase voucher of original manufacturer or authorises dealer and test certificates. Department will take on charge the disinfectant and attach receipt voucher with the RAR/Final Bill. The same disinfectant shall be issued to the contractor on requirement basis, without any extra cost to the Department and issue voucher shall be kept on record for payment purpose.
Note for all the items 1 to 8 of Sch 'A' here in before :- (i) Minimum qualification/experiences for operator shall be ITI pass in appropriatefield and for helper minimum 2 years experiance in same field. Contractor shall submit necessary documetns for the same before commencement of work for each manpower employed by him to Engineer-in-charge. (ii) Contractor shall submit names of operators and helpers to be deployed at the work alongwith qualification and experience to the Engineer-in- Charge for verification. (iii) Subsequently action for police verification of antecedents of persons to be deployed shall be taken by the contractor and contractor shall submit the same to the Engineer-in-Charge within 7 days from the date of commencement of work. (iv) Obtaining security passes and police verification will be respnsiblity of contractor for manpower employed by him. (v) Contractor shall provide all tools and safety equipemtns required for day to day works without any extra cost.
(vi) Weekly off will be given to all manpower employed by contractor as per exisiting rules. Provision of reliver for each manpower employed by contractor shall deemed to include in item rate quoted. (vii) Two or more installations have been clubbed under one item keeping in view the vicinity/ nearness and within precinct. Unit rates qouted by the Contractor shll be deemed to include this aspect also. (viii) Cleaning of MRS/Sub Station and surrounding area will be responsibilites of manpower employed by cotnractor and rate quoted for items shall deemed to include this provision. (ix) Necessary logbook/logsheet and attendence register will be maintained by Contractor, JE E/M and Engineer-in-charge. (xi) In case contractor fails to deploy appropriate staff for any shift, penalty @ Rs 1000/- shift shall be recovered from the contractor.
DUGGAL CONSTRUCTION CO
TRIVENI CONSTRUCTIONS
R K ENTERPRISES
J K AND COMPANY
M/S BALWINDER SINGH
sunrise engineers and contractors
Arneja Builders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .