Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
25 Nov 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
Empanelment of Contractor for Annual Rate Contract for Medical Gas Pipe Line System Across the State of Gujarat.
362152
2026-27/90/05
Open
Civil Works
Works
Gandhinagar
1 document required · 1 mandatory
₹2,400
PIU-General Fund A/c 11-114
₹1 L
4 Nov 2026
4 Nov 2026
4 Nov 2026
25 Nov 2026
4 Nov 2026
120 days
Name of work : Empanelment of Contractor for Annual Rate Contract for Medical Gas Pipe Line System Across the State of
Sr.No Discription Unit Taken Rate
Repairing and functional testing of Area Valve Service Unit (AVSU), including cleaning, valve operation, leakage checking and minor consumables as per
direction of Engineer In Charge.
2 Repairing and functional testing of Master/Area Medical Gas Alarm Panel, including sensors, visual/audible alarm and indication system. Each
3 Servicing of automatic medical gas manifold/changeover system including regulators, pressure switches, non-return valves and functional testing. Each
4 Servicing of medical gas manifold including headers, isolation valves, flexible connections, regulators, gauges and associated accessories. Set
5 Servicing of Medical Air Compressor Plant including compressor, filters, dryer, receiver,oil, drains, pressure switches and associated controls. Job
6 Servicing of Medical Vacuum Plant including vacuum pump, receiver, oil,vacuum switch, gauges, filters, drains and associated controls. Job
7 Emergency breakdown maintenance of MGPS including fault identification, emergency attendance, isolation, minor repair and restoration of gas supply. Visit
8 Complete MGPS validation/testing including pressure, leakage, cross-connection, gas identification and terminal outlet testing with report. Job
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
9 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION
MEDICAL GRADE COPPER PIPE : 12 MM OD X 1 MM THICK.
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
10 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION.
MEDICAL GRADE COPPER PIPE : 15 MM OD X 0.9 MM THICK.
Sr.No Discription Unit Taken Rate
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
11 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION.
MEDICAL GRADE COPPER PIPE : 22 MM OD X 0.9 MM THICK.
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
12 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION.
MEDICAL GRADE COPPER PIPE : 28 MM OD X 0.9 MM THICK.
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
13 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION.
MEDICAL GRADE COPPER PIPE : 42 MM OD X 1.2 MM THICK.
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
14 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION.
MEDICAL GRADE COPPER PIPE : 54 MM OD X 1.2 MM THICK.
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
15 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION.
MEDICAL GRADE COPPER PIPE : 76 MM OD X 1.5 MM THICK.
SUPPLYING, LAYING, TESTING AND COMMISSIONING OF COPPER PIPE AS PER STANDARD BS : EN 13348 : 2008/ ASTM B819 STANDARDS, SOLID
DRAWN, SEAMLESS, DEOXIDEZED, NON - ARSENICAL, HALF HARD ( HARD CAN BE ACCEPTED ONLY FOR SIZES 54 MM OR MORE ), TEMPERED
16 AND DEGREASED COPPER PIPE CONFIRMING TO THE STANDARD. ALL COPPER PIPES SHOULD BE DEGREASED & DELIVERED CAPPED AT RMT
BOTH ENDS OF REQUIRED SIZES, COMPLIANT AS PER TECHNICAL SPECIFICATION.
MEDICAL GRADE COPPER PIPE : 108 MM OD X 1.5 MM THICK.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS OUTLET POINTS FOR MEDICAL AIR 7 OUTLET WITH PROBE AS PER
17 TECHNICAL SPECIFICATION. EACH
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS OUTLET POINTS FOR Oxygen OUTLET WITH PROBE AS PER TECHNICAL
18 SPECIFICATION. EACH
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
Sr.No Discription Unit Taken Rate
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS OUTLET POINTS FOR NITROUS OXIDE OUTLET WITH PROBE AS PER
19 TECHNICAL SPECIFICATION. EACH
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS OUTLET POINTS FOR VACCUM OUTLET WITH PROBE AS PER TECHNICAL
20 SPECIFICATION. EACH
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS OUTLET POINTS FOR MEDICAL AIR 4 OUTLET WITH PROBE AS PER
21 TECHNICAL SPECIFICATION. EACH
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS OUTLET POINTS FOR AGSS OUTLET WITH PROBE AS PER TECHNICAL
22 SPECIFICATION. EACH
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS OUTLET POINTS FOR CO2 OUTLET WITH PROBE AS PER TECHNICAL
23 SPECIFICATION. EACH
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AREA VALVE BOXES AS PER SPECIFICATION.
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
VALVE BOX - 2 GAS SERVICES
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AREA VALVE BOXES AS PER SPECIFICATION.
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
VALVE BOX - 3 GAS SERVICES
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AREA VALVE BOXES AS PER SPECIFICATION.
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
VALVE BOX - 4 GAS SERVICES
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AREA VALVE BOXES AS PER SPECIFICATION.
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
VALVE BOX - 5 GAS SERVICES
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AREA VALVE BOXES AS PER SPECIFICATION.
NOTE : THE QUANTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY.
VALVE BOX - 6 GAS SERVICES
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF MEDICAL GAS ALARM PANEL AS PER TECHNICAL SPECIFICATION.
29 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
A. MEDICAL GAS ALARM PANEL FOR 2 SERVICES
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF MEDICAL GAS ALARM PANEL AS PER TECHNICAL SPECIFICATION.
30 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
B. MEDICAL GAS ALARM PANEL FOR 3 SERVICES
Sr.No Discription Unit Taken Rate
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF MEDICAL GAS ALARM PANEL AS PER TECHNICAL SPECIFICATION.
31 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
C. MEDICAL GAS ALARM PANEL FOR 4 SERVICES
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF MEDICAL GAS ALARM PANEL AS PER TECHNICAL SPECIFICATION.
32 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
D. MEDICAL GAS ALARM PANEL FOR 5 SERVICES
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF MEDICAL GAS ALARM PANEL AS PER TECHNICAL SPECIFICATION.
33 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
E. MEDICAL GAS ALARM PANEL FOR 6 SERVICES
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF MEDICAL GAS ALARM PANEL AS PER TECHNICAL SPECIFICATION.
34 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
F. MASTER ALARM PANEL
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
35 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
A. 15 MM BALL VALVE
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
36 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
B. 22 MM BALL VALVE
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
37 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
C. 28 MM BALL VALVE
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
38 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
D. 35 MM BALL VALVE
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
39 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
E. 42 MM BALL VALVE
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
40 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
F. 54 MM BALL VALVE
Sr.No Discription Unit Taken Rate
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
41 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
G. 76 MM BALL VALVE
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF LINE ISOLATION VALVES AS PER TECHNICAL SPECIFICATION.
42 NOTE : THE QUQNTITIES TO BE WORKED OUT AS PER THE SITE AND INDICATED ACCORDINGLY. EACH
H. 108 MM BALL VALVE
BED HEAD HORIZONTAL / VERTICAL AS PER SPECIFICATION COMPRISING OF RAIL SYSTEM TO MOUNT, MADE OF ALLUMINIUM EXTRUSIONS,
WITH PROVISION OF LOW AN MEDIUM VOLTAGE SUPPLIES, GAS OUTLETS, ELECTRICAL SOCKETS, TELEPHONE SOCKETS ETC COMPLETE
NOTE : THE QUANTITIES OF HORIZONTAL AND VERTICAL PANELS SHOULD BE WORKED OUT SEPARATELY.
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF MEDICAL GAS HOSE ASSEMBLIES AS PER STANDARD FOLLOWED AS PER
44 TECHNICAL SPECIFICATION. RMT
NOTE : THE QUANTITY FOR OXYGEN, N2O, COMPRESSED AIR, VACCUM ETC TO BE WORKED OUT AS PER DESIGN / SITE REQUIREMENTS.
DISCONNECT PIPELINE WITH TESTING AND COMMISSIONING FOR CONTINEOUS 15MM,22MM,28MM,42MM, 54 MM, 76 MM, 108 MM WITH TESTING
AS PER TECHNICAL SPECIFICATION.
46 PAINTING CHARGES OXYGEN,NITRUS,AIR VACCUM PIPELINE AS PER TECHNICAL SPECIFICATION. RMT
SUPPLY INSTALLATION TESTING AND COMMISSIONING MATCHING PROBE/ADOPTER FULLY COMPLY AND MEET WITH HTM 02-01/ NFPA
C/EN/DIN/ ISO 7396-1 FRONT LOADING TYPE AS PER TECHNICAL SPECIFICATION.
48 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING INDIGENOUS POINT BRACKET 4 BAR AS PER TECHNICAL SPECIFICATION. EACH
49 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING INDIGENOUS POINT BRACKET 7 BAR AS PER TECHNICAL SPECIFICATION. EACH
SUPPLY INSTALLATION TESTING AND COMMISSIONING PIN ADAPTOR FULLY COMPLY AND MEET WITH HTM 02-01/ NFPA 99 C/EN/DIN/ ISO 7396-
1 FRONT LOADING TYPE AS PER TECHNICAL SPECIFICATION.
SUPPLY INSTALLATION TESTING AND COMMISSIONING SINGLE PROBE FULLY COMPLY AND MEET WITH HTM 02-01/ NFPA 99 C/EN/DIN/ ISO
7396-1 FRONT LOADING TYPE AS PER TECHNICAL SPECIFICATION.
SUPPLY INSTALLATION TESTING AND COMMISSIONING DOUBLE PROBE FULLY COMPLY AND MEET WITH HTM 02-01/ NFPA 99 C/EN/DIN/ ISO
7396-1 FRONT LOADING TYPE AS PER TECHNICAL SPECIFICATION.
Sr.No Discription Unit Taken Rate
53 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEW IMPORTED POINT AS PER TECHNICAL SPECIFICATION . EACH
54 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEW PARKODEX POINT AS PER TECHNICAL SPECIFICATION. EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING WARD VACCUM UNIT BACTERIA FILTER SWITCH TYPE LOCKING SYSTEM
THEATER TROLLY(VACCUM) AS PER TECHNICAL SPECIFICATION.
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING WARD VACCUM UNIT BACTERIA FILTER SWITCH TYPE LOCKING SYSTEM 1000 AS
PER TECHNICAL SPECIFICATION.
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING WARD VACCUM UNIT BACTERIA FILTER SWITCH TYPE LOCKING SYSTEM
PEDATRIC AS PER TECHNICAL SPECIFICATION .
58 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING L.P TUBE MEDICAL GRADE AS PER TECHNICAL SPECIFICATION . RMT
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING THEATRE SUCTION UNIT : AS PER TENDER TECHNICAL SPECIFICATIONS HTM 02-01
59 DIN, ISO-7396-1 ,NFPA -99 LATEST EDITION ETC. COMPLETE AS PER DRAWINGS AND DESIGN SUPPLIED BY ARCHITECT AND INSTRUCTION EACH
GIVEN BY AUTHORITY AND E.I.C.
60 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING H.P TUBE MEDICAL GRADE AS PER TECHNICAL SPECIFICATION . RMT
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING CONTACT GUAGE MINIMUM OXYGEN & NITROUS 0 TO 250{KG/CM2} AS PER
TECHNICAL SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN TAIL PIPE WITH CAP NUT AND CYLINDER NUT PIPE(B.S.P THREADING) AS
PER TECHNICAL SPECIFICATION.
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NITROUS TAIL PIPE WITH CAP NUT AND CYLINDER NUT PIPE(B.S.P THREADING) AS
PER TECHNICAL SPECIFICATION.
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF METAL B.P.C FLOW METER 7396-1:2007(0 TO 15KG) SHOULD FULLY COMPLY AND
MEET WITH BIS/EUROPEAN CE CERTIFIED AS PER TECHNICAL SPECIFICATION.
Sr.No Discription Unit Taken Rate
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF HUMIDIFIER BOTTLE (42BAR 02LTR/MIN (0 TO 15KG) SHOULD FULLY COMPLY
AND MEET WITH BIS/EUROPEAN CE CERTIFIED AS PER TECHNICAL SPECIFICATION
66 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING HIGH FLOW PRESSURE REGULATOR AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING TAILORIZE CONNECTION WITH COPPER FITTING TWO SIDE CONNECTION AS PER
TECHNICAL SPECIFICATION
68 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING PISTON 36 REGULATOR 10KG AS PER TECHNICAL SPECIFICATION EACH
69 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING SILVER ROD FOR WELDING 100GM AS PER TECHNICAL SPECIFICATION. EACH
70 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING AIR GUN PNEUMATIC SYSTEM WITH 7 BAR AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING A TYPE EMPTY CYLINDER FLUSH TYPE 612 LTRS WITH DRUG LICENSE & ISO AS PER
TECHNICAL SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING A TYPE OXYGEN CYLINDER WITH VALVE 612 LTRS WITH DRUG LICENCE & ISO AS
PER TECHNICAL SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING B TYPE OXYGEN EMPTY CYLINDER WITH VALVE 1320 LTRS WITH DRUG LICENSE &
ISO AS PER TECHNICAL SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NITROUS EMPTY CYLINDER WITH FLUSH TYPE VALVE 1851 LTRS WITH DRUG
LICENCE & ISO AS PER TECHNICAL SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING A TYPE & N2O FLUSH TYPE KEY / CYLINDER KEY AS PER TECHNICAL SPECIFICATION
76 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING B TYPE / NITROUS CYLINDER KEY AS PER TECHNICAL SPECIFICATION . EACH
Sr.No Discription Unit Taken Rate
77 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN BULK CYLINDERS NITROUS KEY AS PER TECHNICAL SPECIFICATION . EACH
78 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NITROUS BULK CYLINDER NITROUS KEY AS PER TECHNICAL SPECIFICATION . EACH
SUPPLY INSTALLATION TESTING ANDCOMMISSIONING OF BED HEAD HORIZONTAL (WITHOUT OUTLETS) SHOULD COMPLY AND MEET WITH
HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396- 1 STANDARD AND AS PER TECHNICAL SPECIFICATION.
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN EMPTY CYLINDER B TYPE VALVE ATTACHMENT TYPE WITH FLOW METER
PROVISION AS PER TECHNICAL SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN EMPTY CYLINDER A TYPE VALVE ATTACHMENT ANASTHESIA TROLLY AS
PER TECHNICAL SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING F.A VALVE WITH FLOW METER HUMIDIFIER BOTTLE (WARD) AS PER TECHNICAL
SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NON RETURN CAP TYPE N.R.V OXYGEN , AIR ,NITROUS AS PER TECHNICAL
SPECIFICATION .
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING HIIGH PRESSURE CYLINDER PISTON REGULATOR WITHOUT DIAPHRAM AS PER
TECHNICAL SPECIFICATION .
INSTALLATION TESTING AND COMMISSIONING OLD COPPER PIPE 15MM WITH MATERIAL LABOUR CHARGES INSTALLATION AS PER
TECHNICAL SPECIFICATION .
TESTING AND COMMISSIONING ISOLATION VALVE RE-FITTING 15,22,28,35,42 MM WITH MATERIAL LABOUR CHARGE AS PER TECHNICAL
SPECIFICATION .
87 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN TUBING AS PER TECHNICAL SPECIFICATION EACH
88 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NON RETURN VALVE AS PER TECHNICAL SPECIFICATION EACH
Sr.No Discription Unit Taken Rate
89 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN/NITRUS TAIL PIPE AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING TELLER HIGH PRSSURE 12MM COPPER PIPE WITH FITTING AS PER TECHNICAL
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING F.A VALVE WITH OXYGEN REGULATOR, GAUGE FOR CYLINDER AS PER TECHNICAL
92 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN JUMBO CYLINDER AS PER TECHNICAL SPECIFICATION EACH
93 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NITRUS JUMBO CYLINDER AS PER TECHNICAL SPECIFICATION EACH
94 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING CO2 JUMBO CYLINDER AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING REGULATOR WITH FLOW METER AND HUMIDIFIER BOTTLE AS PER TECHNICAL
96 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING AMBULANCE READING SENSOR AS PER TECHNICAL SPECIFICATION EACH
97 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING AMBULANCE TUBING FOR SS COTED AS PER TECHNICAL SPECIFICATION EACH
98 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER BAND 56MM AS PER TECHNICAL SPECIFICATION EACH
99 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER BAND 42MM AS PER TECHNICAL SPECIFICATION EACH
100 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER BAND 28MM AS PER TECHNICAL SPECIFICATION EACH
101 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER BAND 12MM AS PER TECHNICAL SPECIFICATION EACH
Sr.No Discription Unit Taken Rate
102 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER TEE 56MM AS PER TECHNICAL SPECIFICATION EACH
103 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER TEE 42MM AS PER TECHNICAL SPECIFICATION EACH
104 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER TEE 28MM AS PER TECHNICAL SPECIFICATION EACH
105 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER TEE 12MM AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN CHANGEOVER SKID 3 HIGH FLOW REGULATOR ON OFF LOCKING VALVE
NEW SUPPLY AS PER TECHNICAL SPECIFICATION
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN CHANGEOVER SKID 5 HIGH FLOW REGULATOR ON OFF LOCKING VALVE
NEW SUPPLY AS PER TECHNICAL SPECIFICATION
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN CHANGEOVER SKID 4 HIGH FLOW REGULATOR ON OFF LOCKING VALVE
NEW SUPPLY AS PER TECHNICAL SPECIFICATION
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN CHANGEOVER SKID 3 HIGH FLOW REGULATOR ON OFF LOCKING VALVE
REPAIRING WITH MATERIAL AS PER TECHNICAL SPECIFICATION
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN CHANGEOVER SKID 5 HIGH FLOW REGULATOR ON OFF LOCKING VALVE
REPAIRING WITH MATERIAL AS PER TECHNICAL SPECIFICATION
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OXYGEN CHANGEOVER SKID 4 HIGH FLOW REGULATOR ON OFF LOCKING VALVE
REPAIRING WITH MATERIAL AS PER TECHNICAL SPECIFICATION
112 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER BAND ISO&CE90012015 108MM AS PER TECHNICAL SPECIFICATION EACH
113 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER REDUCER108X35MM AS PER TECHNICAL SPECIFICATION EACH
Sr.No Discription Unit Taken Rate
114 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER COUPLER 108MM AS PER TECHNICAL SPECIFICATION EACH
115 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER REDUCER 35X28MM AS PER TECHNICAL SPECIFICATION EACH
116 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER REDUCER 35X52MM AS PER TECHNICAL SPECIFICATION EACH
117 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER REDUCER35X35MM AS PER TECHNICAL SPECIFICATION EACH
118 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER REDUCERR35X15MM AS PER TECHNICAL SPECIFICATION EACH
119 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER BAND ISO&CE90012015 35MM AS PER TECHNICAL SPECIFICATION EACH
120 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER COUPLER 42MM AS PER TECHNICAL SPECIFICATION EACH
121 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER BAND ISO&CE90012015 42MM AS PER TECHNICAL SPECIFICATION EACH
122 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING COPPER REDUCER 42MM AS PER TECHNICAL SPECIFICATION EACH
123 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEUNETALBPC FLOWMETER HUMIDIFIER BOTTLE AS PER TECHNICAL SPECIFICATION EACH
124 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEUNETAL HUMIDIFIER BOTTLE AS PER TECHNICAL SPECIFICATION EACH
125 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING IMPORTED ADAPTOR AS PER TECHNICAL SPECIFICATION EACH
126 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING IMPORTED VACCUM CONTROL PANEL AS PER TECHNICAL SPECIFICATION EACH
Sr.No Discription Unit Taken Rate
127 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING CONTROL PANEL ELECTRIC CONNECTION AS PER TECHNICAL SPECIFICATION EACH
128 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING LIQUID HIGH PRESSURE REGULATOR VANAJ AS PER TECHNICAL SPECIFICATION EACH
129 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING SKIT HIGH FLOW REGULATOR AS PER TECHNICAL SPECIFICATION EACH
130 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING TAILOR HIGH PRESSURE 20MT CONNECTION PIPE AS PER TECHNICAL SPECIFICATION EACH
131 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING DIGITAL ALARAM FOR LIQUID PLANT AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING HIGH PRESSURE REGULATOR WITH FLOWMETER(AMBULANCE) AS PER TECHNICAL
133 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEW VACCUM CONTROL PANEL MOTHERBOARD AS PER TECHNICAL SPECIFICATION EACH
134 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEW AIR CONTROL PANEL SENSOR AS PER TECHNICAL SPECIFICATION EACH
135 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEW AIR CONTROL PANEL MOTHERBOARD AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEW IMPORTED OXYGEN CONTROL PANEL ALRAM SENSOR AS PER TECHNICAL
137 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING NEW DRYER CONTROL PANEL SENSOR AS PER TECHNICAL SPECIFICATION EACH
138 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING DRYER MOTHERBOARD AS PER TECHNICAL SPECIFICATION EACH
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING AIR COMPRESSOR 20HP DRYER CONTROL PANEL CMC (1UNIT) AS PER TECHNICAL
Sr.No Discription Unit Taken Rate
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING VACCUM COMPRESSOR 20HP CONTROL PANEL CMC (1UNIT) AS PER TECHNICAL
141 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING ON/OFF CUT OFF VALVE 108MM AS PER TECHNICAL SPECIFICATION EACH
142 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING IMPORTED VACCUM PLANT OIL AS PER TECHNICAL SPECIFICATION 1 ltr
143 SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING IMPORTED AIR PLANT OIL AS PER TECHNICAL SPECIFICATION 1 ltr
OPERATION AND COMPREHENSIVE MAINTENANCE OF THE COMPLETE MEDICAL GAS PIPELINE SYSTEM AS PER TERMS AND CONDITIONS OF
COMPREHENSIVE MAINTENANCE DESCRIBED IN THE TENDER AS PER FOLLOWING.(MGPS ALL GAS OUTLET POINTS UP TO 50 POINTS )
THE COMPREHENSIVE MAINTENANCE OF MGPS INSTALLATIONS INCLUDES COMPLETE MGPS INSTALLATIONS, LABOUR, SPARES, ALL
CONSUMABLES ETC. AS REQUIRED INCLUDING THE FOLLOWING.
A ) ALL MGPS EQUIPMENT MENTIONED IN THE TENDER.
B ) PLASTIC AND GLASS PARTS AGAINST ANY MANUFACTURING DEFECTS.
C ) ALL KIND OF SENSORS.
D ) ALL KIND OF COILS, PROBES AND TRANSDUCERS.
E ) PRINTERS AND IMAGERS INCLUDING LASER AND THERMAL PRINTERS WITH ALL PARTS.
F ) ALL KINDS OF PAINTING, CIVIL, HVAC AND ELECTRICAL WORKS IN MGPS PLANT AREAS
G ) PREVENTIVE MAINTENANCE INCLUDING TESTING & CALIBRATION AS PER TECHNICAL / SERVICE / OPERATIONAL MANUAL OF THE
H ) MGPS INSTALLATION INSIDE THE MGPS PLANT ROOM / YARDS.
I ) ANY OTHER WORKS REQUIRED FOR FULLY OPERATION OF MEDICAL GAS PIPE SYSTEM.
FOR 1 ( ONE ) YEAR
OPERATION AND COMPREHENSIVE MAINTENANCE OF THE COMPLETE MEDICAL GAS PIPELINE SYSTEM AS PER TERMS AND CONDITIONS OF
COMPREHENSIVE MAINTENANCE DESCRIBED IN THE TENDER AS PER FOLLOWING.(MGPS ALL GAS OUTLET POINTS FROM 51 TO 250 POINTS )
THE COMPREHENSIVE MAINTENANCE OF MGPS INSTALLATIONS INCLUDES COMPLETE MGPS INSTALLATIONS, LABOUR, SPARES, ALL
CONSUMABLES ETC. AS REQUIRED INCLUDING THE FOLLOWING.
A ) ALL MGPS EQUIPMENT MENTIONED IN THE TENDER.
B ) PLASTIC AND GLASS PARTS AGAINST ANY MANUFACTURING DEFECTS.
C ) ALL KIND OF SENSORS.
D ) ALL KIND OF COILS, PROBES AND TRANSDUCERS.
E ) PRINTERS AND IMAGERS INCLUDING LASER AND THERMAL PRINTERS WITH ALL PARTS.
F ) ALL KINDS OF PAINTING, CIVIL, HVAC AND ELECTRICAL WORKS IN MGPS PLANT AREAS
G ) PREVENTIVE MAINTENANCE INCLUDING TESTING & CALIBRATION AS PER TECHNICAL / SERVICE / OPERATIONAL MANUAL OF THE
H ) MGPS INSTALLATION INSIDE THE MGPS PLANT ROOM / YARDS.
I ) ANY OTHER WORKS REQUIRED FOR FULLY OPERATION OF MEDICAL GAS PIPE SYSTEM.
FOR 1 ( ONE ) YEAR
Sr.No Discription Unit Taken Rate
OPERATION AND COMPREHENSIVE MAINTENANCE OF THE COMPLETE MEDICAL GAS PIPELINE SYSTEM AS PER TERMS AND CONDITIONS OF
COMPREHENSIVE MAINTENANCE DESCRIBED IN THE TENDER AS PER FOLLOWING.(MGPS ALL GAS OUTLET POINTS ABOVE 250 POINTS )
THE COMPREHENSIVE MAINTENANCE OF MGPS INSTALLATIONS INCLUDES COMPLETE MGPS INSTALLATIONS, LABOUR, SPARES, ALL
CONSUMABLES ETC. AS REQUIRED INCLUDING THE FOLLOWING.
A ) ALL MGPS EQUIPMENT MENTIONED IN THE TENDER.
B ) PLASTIC AND GLASS PARTS AGAINST ANY MANUFACTURING DEFECTS.
C ) ALL KIND OF SENSORS.
D ) ALL KIND OF COILS, PROBES AND TRANSDUCERS.
E ) PRINTERS AND IMAGERS INCLUDING LASER AND THERMAL PRINTERS WITH ALL PARTS.
F ) ALL KINDS OF PAINTING, CIVIL, HVAC AND ELECTRICAL WORKS IN MGPS PLANT AREAS
G ) PREVENTIVE MAINTENANCE INCLUDING TESTING & CALIBRATION AS PER TECHNICAL / SERVICE / OPERATIONAL MANUAL OF THE
H ) MGPS INSTALLATION INSIDE THE MGPS PLANT ROOM / YARDS.
I ) ANY OTHER WORKS REQUIRED FOR FULLY OPERATION OF MEDICAL GAS PIPE SYSTEM.
FOR 1 ( ONE ) YEAR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20-Special Conditions-27-05-2026.pdf
MGPS BOQ Empanelment R1.pdf
MGPS Item Specifications.pdf
SBD_Empanelment_MGPS 26-27.pdf
Tender Details-90-05.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .