Dy.Minicipal Commissioner - West Zone
Renovation of Mini Sports Complex Ground Area Near Municipal School No.17 at GST Bhawan Cross Road in Navrangpura ward at west zone.
268263
7/25-26 (T.N.124)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹2,400
Yes
Municipal Commissioner, Ahmedabad
₹81,680
Yes
22 Jan 2026
22 Jan 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
1. Name of Work : Renovation of Mini Sports Complex Ground Area Near
Municipal School No.17 at GST Bhawan Cross Road in
Navrangpura ward at west zone.
2. Tender Estimated Cost : Rs:-
: 1% of the Tender Cost in the form of Rs. 81,680.00 (D.D. / Pay
3. Earnest Money
- Order / Local Micr Check/B.G.)
4 Tender Fee Rs : Demand Draft of Rs.2400.00
5 S.D. : 5 % of tender amount
6. Time-Limit : 12 months
7. Validity Period : 120 Days
(a) Eligibility Criteria Register “D” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or
8. (i) Last Date of Submission of :
(ii) Mode of Sending : a) In Sealed cover in duplicate copies by Registered Post A.D,
or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to :
a) Name of work, Tender Notice No. & Tender No.
be made on sealed cover
b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in : The Price bid shall be submitted online only.
Schedule of Quantities and
Rates It shall not be submitted Physically.
9. Date of Opening : Dt.30-01-2026, 15:00 PM
10 Place of Submission & : Submission of EMD. Tender fee and other Documents during office
Opening of Tender hours: On date.30-01-2026 &12:00 pm West Zone, 2nd Floor, A.M.
Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
11 Penalty Due to Delay of work (1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs) but not more then 10% of bill
Defect Liability : As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound to
start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and through letter / E-
mail shall be considered legal and binding for the same. Failure of
comply to start the works in 48 hours of intimation as above by
Time permitted to start parts
contractor the contractor shall be levied penalty of (1) Rs.1000/- per
day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for
tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above 30 Lakhs). Three
times failures by contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in writing /
binding within 15 days of last notice of penalty.
• The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract
fine of Rs. 5,000/- for each incident.
Safety Failure to erect safety signage or trying to carry out he
works without proper precautions/safety measures as
equired will attract a fine of Rs. 5,000/- for each incident.
The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards
Defect &Liability Period the expenses, if any, Incurred by him in rectification, removal or re-
14 execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the
certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period
shall be 12 months from the certified date of completion which
should include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
Compensation for Delay 10% of Remaining work (As per Circular)
Whenever a work is allotted by Engineering staff, whether minor
or major of part thereof of any amount, the contractor shall be
bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
Time permitted to start parts intimation as above by contractor the contractor shall be levied
16 of work penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part Of
Addendum/Corrigendum
17 Tender And The Same As to be Attached Along With The Tender
EPF Act As per Acoount Department circular no-37 Date:09/08/2018
GST will be paid extra by AMC/Authority at prevailing rate to the
Signature of contractor
Add. City Engg.(West Zone)
Name : Ahmedabad Municipal Corporation
Company's Seal :Date :
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-WEST ZONE
Name of The Work:- Renovation of Mini Sports Complex Ground Area Near Municipal School
No.17 at GST Bhawan Cross Road in Navrangpura ward at west zone.
Description of Item Unit Qty Rate Amount
Excavation for foundation upto 1.5 m depth including sorting
1 out and stacking of useful materials and disposing off the Cu.M
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead.(A) Loose 75.00 222.72
Filling available excavated earth (excluding rock) in trenches.
plinth, sides of foundations etc. in layers not exceeding 20 cm.
in depth consolidating each disposited layer by ramming and 150.00 129.90
Carring out plinth treatment to post construction / existing
structure by spraying chemical solution for termite control
treatment including labour and material consistment with I.S.I
specification. Using Chlordene and Chiorpurfiles 20 EC. As Per
4 6131_paret-II Consentration Weight one percent is Sqmt
recommended i.e one litre 20 EC chemical emulsion
with 19 liter give 1 % concrentration inclusive of one litre
chemical emulsion appication at the rate of 5 Litre chemical /
Sqm of surface is recommended as per I.S
Filling in plinth with sand under floors including watering,
ramming, consolidating and dressing etc. complete. 75.00 455.63
Providing & laying cement concrete 1:2:4 (1 cement:
coarse sand: 4 graded stone aggrt. 20 mm. nominal size)
and curing etc complete including cost of form work in 75.00 4,322.33
Foundation and plinth.
Providing and laying in position Ready Mixed Concrete
M-30 Grade controlled concrete reinforced cement
concrete work For Foundation Footings (Individual,
Combined, Strip and raft) using cement content and
required admixtures in recommended proportions as per
IS : 9103, as per approved design mix manufactured in
fully automatic batching plant and transported to site of
work in transit mixer having continuous agitated mixer
manufactured as per mix design of specified grade for
7 reinforced cement concrete work including pumping of Cu.M
RMC from transit mixer to site of laying, excl. the cost of
reinforcement but including the cost of centering,
shuttering, finishing and cost of admixtures in
recommended proportion as per IS 9103 to accelerate /
retard setting of concrete, improve workability without
impairing strength and durability as per direction of
Engineer In charge. Minimum Cement Content as per
latest IS 456 shall be maintained (Cment Level 475 kg.).
Without Fly ash.
Providing and laying in position Ready Mixed Concrete
M-30 Grade controlled concrete Reinforced Cement
Concrete work For Plinth Beam at various Level as shown
shown in the drawing , using cement content as per
approved design mix manufactured in fully automatice
batching plant and transported to site of work in transit
mixer having continous agitated mixer manufactured as
per mix design of specified grade for reinforced cement
concrete work and Crystalizing admixture for waterproof
concrete made from hydrophilic components added to a
concrete mix, reduce the permeability of hardened
8 concrete as approved by the Engineerincharge including Cu.M
pumping of RMC from transit mixer to site of laying, excl.
the cost of reinforcement but including the cost of
centering, shuttering, using regular shuttering plates,
plywood, Steel Adjustable Props,Cuplock system, planks,
props, spans, runners approved by Structural designer,
vibrating, fair finishing and cost of admixtures in
recommended proportion as per IS 9103 to accelerate /
retard setting of concrete, improve workability without
impairing strength and durability as per direction of
Engineer In charge. Rates are hacking the surface for
plastering / masonary. Minimum Cement Content as per
latest IS 456 shall be maintained (Cment Level 475 kg.).
Without Fly ash.
Providing and laying in position Ready Mixed Concrete
M-30 Grade Control concrete Reinforced Exposed
Cement Concrete work For Beams, various levels as
shown in the drawing , using cement content as per
approved design mix manufactured in fully automatice
batching plant and transported to site of work in transit
mixer having continous agitated mixer manufactured as
per mix design of specified grade for reinforced cement
concrete work and Crystalizing admixture for waterproof
concrete made from hydrophilic components added to a
concrete mix, reduce the permeability of hardened
concrete as approved by the Engineerincharge including
pumping of RMC from transit mixer to site of laying, excl. 50.00 7,403.25
cost of reinforcement but including the cost of centering,
shuttering using plywood shuttering plates, , Steel
Adjustable Props,Cuplock system, planks, props, spans,
runners approved by Structural designer, vibrating, fair
finishing and cost of admixtures in recommended
proportion as per IS 9103 to accelerate / retard setting of
concrete, improve workability without impairing strength
and durability as per direction of Engineer In charge.
Minimum Cement Content as per latest IS 456 shall be
maintained (Cment Level 475 kg.). Without Fly ash RCC
Floor Beam for Ground Floor
Providing and laying in position Ready Mixed Concrete
M-30 Grade Control concrete Reinforced Exposed
Cement Concrete work For Slab, Landing at various
levels as shown in the drawing , using cement content as
per approved design mix manufactured in fully
automatice batching plant and transported to site of
work in transit mixer having continous agitated mixer
manufactured as per mix design of specified grade for
reinforced cement concrete work and Crystalizing
admixture for waterproof concrete made from
hydrophilic components added to a concrete mix, reduce
the permeability of hardened concrete as approved by
the Engineerincharge including pumping of RMC from
transit mixer to site of laying, excl. cost of reinforcement 25.00 6,688.85
but including the cost of centering, shuttering using
plywood shuttering plates, , Steel Adjustable
Props,Cuplock system, planks, props, spans, runners
approved by Structural designer, vibrating, fair finishing
and cost of admixtures in recommended proportion as
per IS 9103 to accelerate / retard setting of concrete,
improve workability without impairing strength and
durability as per direction of Engineer In charge.
Minimum Cement Content as per latest IS 456 shall be
maintained (Cment Level 475 kg.). Without Fly ash Slabs,
Landings, Shelves, Balconies and cantilever for floor Slab,
U. G. Tank,S.T.P etc. for Ground Floor.
Providing TMT Bar FE 500D reinforcement for R.C.C.
11 work including bending, binding and placing in position Kg
complete upto floor two level
Brick Masonry , Plaster and Paint Work
Brickwork using common burnt clay building bricks having
crushing strength not less than 35 Kg./Sq.Cm. in foundation
and plinth in cement Mortar 1:6 (1-Cement : 6-finesand) (B) 184.00 3,981.21
Conventional For Ground floor
Half brick masonry in common burnt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in
Cement mortar 1:4 (1- Cement : 4 -coarse sand ) (B) 80.00
Conventional Ground floor
Providing 15mm thick Cement Plaster in single coat on AAC
Blocks/brick/concrete wall for interior plastering at various
floor level as below, finished even and smooth in Cement 180.00
mortar 1:4 (1-cement :4-sand) Ground floor
20mm thick sand faced exterior cement plaster on walls upto
height 10 metres above ground level consisting of 12mm thick
backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick 200.00
finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall
16 surface to give an even shade including throughly brushing the Sqmt
surface free from mortar droppings and other foreign matter
and sand papered smooth. (work for all floors)
Applying two coats of Birla or Asian acrylic lapy ( putty) &
two coats of primer of approved brand and manufacture on
17 new wall surface to give an even shade including thoroughly Sqmt
brushing the surface foreign matter and sand papered
smooth.(work for all floors)
Providing Throating of Plaster Drip and Moulding to R.C.C
18 Chajja or Cantilever Slab as directed by Engineer Incharge for Rmt
all floors, height and level
Providing cement vata (10 cm x 10 cm size ) quartar round in
19 cement mortar 1:1 including neat cement finishing watering Rmt
etc. complete. For all floors, height amd level
Flooring and Water Proofing Work
Providing & laying 18mm thick mirror finished granite of
approved size, light shade (lighter shade like desert yellow,
adhunik grey, morkarsar green, etc) and quality, selected and
sorted for uniform color in floor and other areas as required
20 sizes and shapes given in design. Average 20 mm thick 1:6 Sqmt
cement mortar bedding for flooring with grey cement slurry
for joints. The rate includes rounding, champhering, rubbing
and mirror polishing of edges. The work shall be carried out
after approval of architect and engineer-in-charge.
Providing and laying polished Kota stone slab flooring over
20mm (Average) thick base of cement mortar 1:6 (1-cement :
6-coarse sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand)
laid over and jointed with grey cement slurry mixed with 75.00 956.03
pigment to match the shade of slab including rubbing and
polishing etc. complete. (A) 25mm thick (work for all floors)
Providing and laying polished kota stone slab 20mm thick in
risers of steps,skirting Dedo and pillars laid on 10mm thick
cement mortar 1:3 (1-Cement : 3 coarse sand) and jointed
with gray cement slury mixed with pigment to match the 30.00 1,078.88
shade of slab including rubbing and polishing etc. complete.
(work for all floors)
Providing and laying wired finish screed (1 Cement : 5 Coarse
Sand : 10 Graded Stone Aggregate 20mm down size) in
required thick as per drawing /instruction by the
Architect/Engineer In Charge as bedding for flooring laid to
achieve propoer slope or 0-0 levelled surface and curing 56.25 2,492.51
complete excluding cost of formwork at any type of surface all
floors all levels all heights etc. complete as directed by EIC.
(work for all floors)
Providing and laying white/coloured glazed or ceramic tiles
to 10 mm thick and 300x450mm size in skirting, risers of steps
and dedo on 10mm thick cement plaster 1:3 (1-cement :3- 75.00 960.47
coarse sand) and jointed with white cement slurry) .
Providing and laying water proofing treatment in sunken
portion of WCs, bathroom, Swimming Pool Area, etc., by
applying cement slurry mixed with water proofing cement
compound consisting of applying :
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with
water proofing cement compound @ 0.253 kg/ sqm. This layer
will be allowed to air cure for 4 hours.
(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed 75.00 503.88
with water proofing cement
compound @ 0.126 kg/sqm. This layer will be allowed to air
cure for 4 hours followed with
water curing for 48 hours. The rate includes preparation of
surface, treatment and sealing of all joints, corners, junctions
of pipes and masonry with polymer mixed slurry.
Providing proprietary Acrylic Polymer modified cementations
water proofing, System to horizontal roof and part of parapet
(300 mm height rounding off junction and extending them
upto 15 cm along the wall) by providing and laying 12mm to
20mm broken pieces of glazed tiles to be laid on Cement
Morar (1 :3) to plain or slope tempered to bring chaina 100.00 1,059.62
mosaic tile work over Av. 50mm thick CC 1:2:4 flooring and
grouting with white cement slurry with matching pigment
including clearing with water and oxalic acid etc. complete.
(plan area to be measured) with 10 years guarantee
Door & Vent Work
Providing and fixing 30mm thick factory made moulded door
shutter wood free consisting of frame made out of M.S. tubes
of 19 gauge thickness and size of 25mm x 25mm for stiles, top
and bottom rails, M.S. frame shall have a coat of steel
primers. The inner panel shall consist of 25mm thick High
Density EPS conforming to IS 4671-1984 bonded with 2mm
thick termite proof, water proof and fire resistant moulded
PVC sheet with 2,4,6 raised panel design in different plain and
/or prelim colours after routing the moulded design on one
27 side and 2mm plain and/or prelim PVC sheet on other side of sqmt
the EPS. The edges of panel to be sealed with lipping of 10mm
wide PVC sheet batton (made by sticking 2 PVC rigid foam
sheets of 5mm thickness using PVC solvent cement) and stiles
25mm (5mm x 5) thick and 30mm width PVC sheet fitted
along M.S. tube for lock provision and for lock height 5mm
thick PVC sheet of size 150mm x 100mm fixed with upper and
lower face of inner side of EPS panel etc. complete as per
direction of Engineer in charge manufacture’s specification
Providing, fixing, Commissioning and Transport of 10mm
Toughend (Tempered Glass) Glass in window alluminium
frame shutter up to all floor as per instruction of engineer in 10.00 621.40
Providing, fabricating, assembling, hoisting/ erecting and
fixing in position at any heights/ any levels/ all floors/ all
shapes & sizes with all leads & lifts using MS Rolled Steel
Sections, Hollow sections, Tubular Sections, MS Plates,
Chequered Plates, MS Pipes, Perforated Sheet, Flats, Bright
Bars, Angles, MS Sheet, Girder, Beam. threaded J bolts, insert
plate, support plate etc as per drawing. all confirming to latest
relevant IS codes for the work of steel structures like
staircases, railings, handrail, jali, gates, grills, bracings,
platforms, brackets, monkey ladder, cattle trap, grill door,
29 pipe rack, rungs, false ceiling frame work, framing for facade, Kg
Roof canopy, fencing posts, M.S. Screen & fencing jali frame
work etc. including straightening, cutting, bending, bolting
and welding the members all as per structural drawings and as
per detailed specifications (for materials & workmanship)
including necessary scaffolding/ staging etc. complete in the
situations described hereinafter and comprising of : i) Profile
Cutting of components to required length/ width and
shape/profile; ii) Smooth grinding/ machining of edges/
faces/ all welding joints; iii) Necessary welding (electric arc
welding) for required weld lengths and sizes.
Providing corrugated G.I. sheet of class-3 roofing fixed with
glavanished iron J or L Hooks, Bolts and nuts 8mm diameter
30 with bitumen and G.I. limpet washer or G.I. limpet washer. Sqmt
filled with white lead complete excluding the cost of purlins,
Rafters and Trusses.(1) 0.80 mm thick sheet.
Painting three coats paint (1 coat of primer and 2 coats of
enamel paint)and priming coat on new steel and other metal
surface with enamel paint, brushing, interior to give an even
shade including cleaning the surface an even shade including 179.00 121.28
cleaning the surface of all dirt, dust and other foraging
matter.(work for all floors)
Site Development Work
Outdoor Flooring
SUPPLING AND LAYING OF DURABOLT™ ACRYLIC SPORTS
FLOORING (8 LAYERS):
Supply and installation of European origin ITF certified
layers acrylic system with thickness up to 3mm. The
flooring should be certified by International Tennis
Federation (ITF) and should have application as first layer
of primer (% 100 acrylic latex based emulsion to improve
bond of acrylic court system to the asphalt surface
having consumption ratio of 0.014kg/sqft), second layer
of acrylic Resurfacer (Filling and smoothing asphalt or
concrete surfaces in preparation for Acryflex T tennis
court system. And also fills the surface chips, voids and
conceals repairs while providing a smooth surface for
color coating. It should have a consumption ratio of
0.046kg/sqft), Third, Fourth & Fifth layer of Unirubber
liquid cushion layers at a consumption ratio of 0.10 kgs 1,300.00 1,929.40
per sqft all together, Sixth & Seventh layer of Precoat
(Quartz filled % 100 acrylic latex based textured tennis
topcoat with consumption ratio of 0.078 kg/sqft) and
Eighth layer of Topcoat (100% acrylic latex polymer &
colour coat for the finished surface to protect from UV. It
should have consumption ratio of 0.023 kg/sft). On top
of these 8 layers, the line marking should be done with
Overline paint (% 100 acrylic latex based high hiding line
paints. It should have consumption ratio of 4 kg/court).
The acrylic resurfacer must have silica sand infill to be
embedded into it with consumption ratio of
kg/sqft. The product must be
approved/licensed/preferred by the respective
International Sports Federation & used at the
Indian/International Championships recognized by the
respective Regional /International Sports Federation.
Make: As approved by architect.
Supplying, Installing approved Outdoor Basket Pole made
from 180mm x 180mm Square
Pipe with 3.20m Extentable arragement . imported quality
Acrylic Board having 180cm x 105cm size & shall be 20mm
thick system shall be Adjustable Height for
Juniors/Men/Womwn including Net (any color) , Post Made of
80mm x 80mm and 100mm x 100mm MS pipe comprises
special internal ratchet system .The ratchet enables perfect
tension control of the net. Net should be with branded Net as
33 requires for Volleyball Court and as Approved by Regulatory Set
Authority. The rate inclusive of Epoxy Paints of Poles, all
labours, Grouting materials etc to complete for use. Color of
Net and Post as per the Approved Drawings. Heigh of pole
shall be as per international stanadard. The work to be
completed as per Technical Specification. Rate also includes all
necessary accessories, Base plates and Anchor fastner etc to
complete the Work as per Technical Specification and
International Standard.
Make: As approved by architect.
Providing and laying cement concrete flooring 1:2:4 (1-
cement : - coarse sand :- gradede stone aggregate 20 mm
nominal size) laid in one layer and finished with a floating coat 1,750.00 182.70
of neat cement (B) 40 thick
Providing and fixing pre-cast Rubber Dye / steel Dye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and as
per approved design Confirming to IS 15658 : 2006 including 100.00 680.10
35 mm Sand layer for levelling and filling the joint with sand in
proper line and level as per guidlines of IRC : SP 63-2018 etc.
Providing and fixing pre cast concrete kerb stone of gray
cement based concrete block 30 cm. length, 30 cm. height
36 cm. thick of M-250 grade concrete as per approved design and Rmt
including excavation for fixing in proper line and level filling
the joint with C.M. 1:3 etc complete.
Manufacturing, supplying and fixing retro reflective sign
boards made up of 2 mm thick aluminium sheet, face to be
fully covered with high intensity encapsulated type heat
activated retro reflective sheeting conforming to type - IV of
ASTM-D 4956-01 in blue and silver white or other colour
combination including subject matter, message (bi-lingual),
symbols and borders etc. as per IRC ; 67:2001, pasted on
substrate by an adhesive backing which shall be activated by
applying heat and pressure conforming to class -2 of ASTM-D-
4956-01 and fixing the same with suitable sized aluminium
alloy rivets @ 20 cm c/c to back support frame of M.S. angle
iron of size 25x25x3 mm along with theft resistant measures,
mounted and fixed with 2 Nos. M.S. angles of size 35x35x5
mm to a vertical post made up to M.S. Tee section ISMT
50x50x6 mm welded with base plate of size 100x100x5 mm at 1.00 6,976.13
the bottom end and including making holes in pipes, angles
flats, providing & fixing M.S. message plate of required size,
steel work to be painted with two or more coats of synthetic
enamel paint of required shade and of approved brand &
manufacture over priming coat of zinc chromate yellow
primer (vertical MS-Tee support to be painted in black and
white colours).Backside of aluminium sheet to be painted with
two or more coats of epoxy paint over and including
appropriate priming coat including all leads and lifts etc.
complete as per drawing , specification and direction of
Engineer-in-charge. (I) Mandatory/ Regulatory sign boards of
900 mm diametre with
support length of 3750 mm
Box cutting the road surface to proper slope and camber for
making a base for road work including rolling with vibratory
roller of 8 to 10 tone capacity with plain or pad foot drum or
38 pneuamatic tyred roller of adequate capacity capable of Cu.M
acheiving required compaction in required camber, dry and
wet etc. rolling comlplete as directed removing the excavated
stuff and depositing on road side etc. complete, as directed up
Providing and laying Granular Sub-Base material having P.I.
not more than 6 of well graded B.T. material, mixed in a
mechanical mix plant at OMC, including spreading and
consolidation by 8-10 tonne power roller to required camber
and grade including cost of water and hire charges of 77.63 325.56
machinery including T&P with all lead (Compacted thickness
to be measured) as per MoRTH specification table 400-1, 400-
Providing, laying, spreading and compacting Wet Mix
Macadam (as per table 400 - 10 and 400 - 11) of well graded
stone aggregate to specification including premixing the
Material with water at OMC in mechanical mix plant as per
approved design mix, carriage of mixed material by Tipper to
40 site, laying in uniform layers with motor grade/Front end Cu.M
Loader/paver finisher, in sub base/base course on a well
prepared under base and compacting with vibratory roller to
achieve the desired density including lighting, guarding,
barricating and maintenance of diversion etc. (MoRTH
specification : Clause 406) by mechanical means
Providing and laying design mix cement concrete of M-
30 grade, in roads/ taxi tracks/ runways, using cement
content as per design mix, using coarse sand and graded
stone aggregate of 40 mm nominal size in appropriate
proportions as per approved & specified design criteria,
providing dowel bars with sleeve/ tie bars wherever
required, laying at site, spreading and compacting
mechanically by using needle and surface vibrators,
levelling to required slope/ camber, finishing with
required texture, including steel form work with sturdy 50.63 9,110.00
M.S. channel sections, curing, making provision for
contraction/ expansion, construction & longitudinal
joints (10 mm wide x 50 mm deep) by groove cutting
machine, providing and filling joints with approved joint
filler and sealants, complete all as per direction of
Engineer-in-charge (Item of joint fillers, sealants, dowel
bars with sleeve/ tie bars to be paid separately). Cement
concrete prepared with batch mixing machine
Providing and fixing pre-moulded joint filler in expansion
joints of RCC roads / CC pavements after making the joints
dust free with high pressure air jet cleaners, all complete as
per direction of the Engineer-in-Charge. (Pre-moulded joint
fillers shall be made of bitumen hot sealing compound 1,687.50
impregnated fibre board having impregnation more than 35%,
conforming to IS:1838 for fibre board and IS: 1834 for hot
sealing bitumen compound grade A.)
Providing and filling in position rubberized bitumen hot
sealing compound for sealing of expansion joints in roads /
pavements all complete as per direction of the Engineer-in- 16.88
Providing TMT Bar FE 500D reinforcement for R.C.C.
44 work including bending, binding and placing in position Kg
complete upto floor two level
DISTRIBUTION BOARDS
Providing and erecting Sheet Steel powder coated MCB
distribution board - flush / surface mounted fitted with
busbar, neutral link, earth bar and DIN rail, Conforms to
IS 8623-1 & 3, IEC 61439-1 & 3 without MCB to house
45 appropriate nos. of MCBs.(The DBs should be used of Ea.
same company of MCB to be used) suitable for
(A) single phase incoming and horizontal single phase
(b) sheet steel double door (IP-43)
INTERNAL POINT WIRING
Point wiring for Light / Bell with 2-1.5 sq.mm & earth
wire of 1.5 sq.mm (Green) both are of ISI marked 1.1 KV
grade FRLS PVC insulated multi strand copper wires up to
10 mtr length , in below type of pipe erected with 6A
Modular type switch / bell push & accessories and earth
continuity of following type, erected on PVC /
Metallic/Wooden box, single mounting base frame 20.00
covered with textured/metallic/white front plate
modules erected on / in wall / ceiling as per pipe
erected, with necessary Lamp holder/ceiling rose /
H.D.Connector as directed.
(f) with medium class Rigid PVC pipe and accessories
erected concealed in wall/ceiling complete - Cat. III
Point wiring for on board Looped Plug with 6A Modular
type switch & 5 pin socket erected on PVC /
Metallic/Wooden box, single mounting base frame
47 covered with textured / metallic/white front plate PT
modules erected on / in wall / ceiling with following
type accessories
Providing and erecting Mains with 1.1 KV grade FRLS PVC
insulated ISI marked stranded Copper conductor wire in
following type of pipe to be erected concealed in
48 /flushed on wall/ceiling, with 1.5 sq. mm copper mtr.
conductor FRLS PVC insulated stranded wire of green
colour for earth continuity of following size
(A) with medium class Rigid PVC pipe and accessories
(a) 2 wire 1.5 sq. mm
Providing and erecting Mains with 1.1 KV grade FRLS PVC
insulated ISI marked stranded Copper conductor wire in
following type of pipe to be erected concealed in
/flushed on wall/ceiling, with 1.5 sq. mm copper
conductor FRLS PVC insulated stranded wire of green 50.00
colour for earth continuity of following size
(A) with medium class Rigid PVC pipe and accessories
(b) 2 wire 2.5 sq. mm
Providing and erecting ISI mark Medium class RIGID PVC
PIPES of following size complete to be erected on/in wall
50 or ceiling erected with necessary PVC fittings & Junction mtr.
boxes fixed with adhesive solution & Clamps with
following dia of pipes, in approved manner as directed.
Supplying and erecting LED indoor fittings with LEDs of
wattage 0.2 Watt to 0.5 Watt assembled on single
MCPCB, with housing used as a heat sink shall be made
of thick sheet Steel conforming to IS: 513/CRCA/
aluminium die cast powder coated and high U.V. &
corrosion resistance with diffuser with company
mark/name 160V to 270V, Power Factor more than 0.95,
51 CCT 3000 K to 6500K, Ea.
Luminaire efficacy> 85 lumens/watt ,LED
LED driver efficiency > 85 %
( fitting required LM-79 & LM-80 Certificates)(NOTE:
Below description have shown ranges of Wattage
capacity of LED fittings.The Engineer incharge may select
any wattage capacity between the ranges shown.)vv
(A) Tube Light with integral/ non-integral driver
(iii) 20 Watts, Surge - 2KV,IP-20, conventional 4 feet Cat-
Supplying & erecting in earthpit of minimum bore dia.
225mm size approved make Safe Earthing Electrode
consisting Pipe-in-Pipe Technology as per IS 3043-1987
made of corrosion free hot dipped G.I.Pipes having
Outer pipe dia of 80 mm having 80-200 Micron
galvanising, Inner pipe dia of 40 mm having 200-250
Micron galvanising, connection terminal dia of 14 mm
with constant ohmic value surrounded by highly
conductive compound with high charge dissipation
52 suitable for following type of applications with chamber Ea.
and heavy duty cover.(approved make OEM has to
submit test certificate including value of earth resistane
of installation.
[C] For Electrical Installation covering Transformer
Neutrals, Lightning arrester Earthing, A.C.Plant &
Sensitive Computer System(like Automation,
SCADA)i.e. independent Earthing located in other than
normal soil i.e. Soft Rock, Marshy Soil etc..
-Length of Pipe : 3 Mtrs.
-Back filling Compound :2 nos Bags of 25 Kg.
Supplying & erecting single phase approved make
industrial exhaust fan suitable for medium duty ring
53 mounted low noise operation suitable for medium duty Ea.
having following dia size and maximum speed in RPM
[A] 305 mm dia 900 RPM Cat.II
Providing & laying. R.C.C. Hume pipe for cable to be laid
90 cm. below ground across the road crossing or on floor
54 with necessary material in an approved manner and mtr.
making the ground as per original.
Providing & erecting weather proof, dust & vermin proof,
floor mounted front operated indoor type cubical panel
board necessary IP-42 and above protection as per
approval from engineer incharge made from 14 SWG
thick CRC M.S. sheet for outer body & doors, 16 SWG
thick CRC M.S.sheet for internal partitions with necessary
accesories , supporting angles/ flats channel including
cutting, bending, drilling, welding, riveting with internal
partitions & cable alley as per requirements & instruction
of engineer-in-charge with erection of supplied switch
gears, BUSBARS, suitable size of inter connecting PVC
copper wire / copper-aluminium strips, rubber
grommets, rib, bakelite control fuses/MCB for measuring
instruments, earth bus & earth bolts, foundation flange -
bolts-base Plates, sufficient nos. of hinged doors, handles 1.00 16,230.00
with locking arrangement and rubber gasket,heavy duty
end terminal connection,danger notice board,necessary
ventilation,earthing strip complete. The Panel shall be
painted with epoxy powder coating. (The rates excludes
the cost of switchgears, bus bars, inter connecting mains
& Copper Aluminium strips, meters, Fuses etc. The
dimension shall be measured excluding base beams) The
panel shall be supplied with following approved
manufacturers with following size.
(C) The standard companies switch gear shall be used
and only manufacturers as per IEC 61439 (TTA) for
beneficial use.
(i) with 350mm depth
Supplying stand first AID box with antiseptic cream,
medicine for use on wounds due burn, crepe bandage,
gauge bandage, medicated ready to use bandage (Band- 1.00
aid) adhesive tape for medicinal user, Scissors, anti-
septic solution (Savlon or similar) etc. (All above contents
shall be of standard makes)
Supplying FIRE bucket round bottom of 9 litres capacity
made out of 24 gauge G.I. sheet with extra handle at
57 bottom duly painted white inside and Red out side with Ea.
FIRE mark, filled with dry-sand and kept on existing
stand provided or hung on wall hook.
Supplying and erecting floor mounting stand for keeping
four nos. of FIRE buckets comprising 1500 mm in length,
900 mm height frame made out of 30mm X30 mm X
mm angle iron with cross supports for legs, welded with 1.00
4 hooks and duly painted with one coat of red lead and
two coats of approved enamelled silver paint.
Supplying & erecting D.C.P. type fire extinguisher for
following capacity cartridge type with gun metal cap
gram CO2 gas cartridge, powder and brackets confirming
59 to IS 2171 1985 and complete erected with necessary Ea.
clamps made from 50 x 6 mm M S Flat with nuts and
bolts grouted in wall complete.
[A] For 5 Kg Capacity
Providing and fixing concealed center point to wall ceiling &
floor CPVC (SDR 13.5) PIPE having National Sanitation
60 Foundation (NSF) seal for potable water of following dia. RMT
nominal bore tube fittings and clamps including making good
the wall, ceiling and floor etc. complete.
Providing and fixing concealed center point to wall ceiling &
floor CPVC (SDR 13.5) PIPE having National Sanitation
Foundation (NSF) seal for potable water of following dia.
nominal bore tube fittings and clamps including making good 30.00 202.97
the wall, ceiling and floor etc. complete.
Providing and fixing concealed center point to wall ceiling &
floor CPVC (SDR 13.5) PIPE having National Sanitation
Foundation (NSF) seal for potable water of following dia.
nominal bore tube fittings and clamps including making good 25.00 247.25
the wall, ceiling and floor etc. complete.
63 Providing and fixing Gun metal check or non-return fullway Nos.
wheel valve. (C) 25mm dia. 2.00 416.47
Providing & fixing water storage cooler of approved
make and brand with SS body Complete in respects-
230V Single Phase. minimum flow rate of 40 ltrs. Per 1.00 62,814.00
hour and storage capacity 80 ltrs.
Constructing Manhole with R.C.C. top slab in 1:2:4 mix
(1-cement :2-coarse sand : 4-graded stone aggregate
20mm nominal size) foundation concrete 1:3:6 mix (1-
cement : 3- coarse sand :6-Brick bats 40 + 50mm size)
inside plastering 15mm thick with Cement Mortar 1:5 (1-
Cement : 5-coarse sand) finished with a floating coat of
neat cement and making channels in cement concrete
1:2:4 mix (1-Cement :2-Coarse sand :4-stone aggregate
65 20mm nominal size) finished smooth complete including EACH
curing and festing (i) Inside size 900mm x 1200mm and
1.5M. deep including C.I. cover with frame size 560mm
diameter total weight of cover and frame to
be not less than 128 kgs. (Wt. of cover 64 Kg. andWt. of
frame 64 Kg.)(A) With 230mm thick walls of brick msonry
using brick having crushing strength not less than 35Kg. /
Sq.cm. in Cement Mortar 1:5 (1- Cement: 5-Coarse sand)
(3) C type depth 2.25 Metre for 150mm diameter sewer.
Constructing brick masonry chamber for underground
C.I. Inspection chamber and bends with bricks having
crushing strength not less than 35Kg/ Cm2 in C.M. 1:5
C.I. cover with frame (Light duty) 455mm x 610mm
intenal dimensions total weight of cover with frame to
be not less than 38Kg. (Wt. of cover 23 Kg.) and Wt. of
66 frame 15Kg. ) (R.C.C. top slabe with 1:2:4 mix (1-cement EACH
:2- coarse sand :4-graded stone aggregate 20mm size)
foundation concrete 1:5:10 inside plaster 15mm thick
with cement mortar 1:3 finished smooth with a floating
coat of neat cement on walls and bed concrete etc.
complete.(iii) Inside dimensions 600mm x 850 mm and
450mm deep for pipe lines with three or more inlets.
Providing and fixing 600mm x 450mm bevelled edge
mirrror of superior glass mounted on 6mm thick A.C.
sheet or plywood sheet and fixing to wooden pluge with 2.00
C.P. brass screws and washers.
SANITARY AND CP FIXTURES
68 Providing and fixing chromium plated, bottle trap with EACH
necessary couplings of approved quality for wash basin.
Providing and fixing C.P. brass angle valve for basin mixer
and geyser points of approved quality conforming to
15mm nominal bore
Providing and fixing 100mm sand cast iron grating for
gully, floor or Nahni trap. 4.00
Providing and fixing pillar tap, capstan head, screw down
71 high pressure with screws, shanks and back nuts. (i) EACH
Providing and fixing screw down bib taps of following
72 size.(B) Brass chromium plated screws down Bib Tap. (i) EACH
Providing and fixing brass screw down stop tap.(A)
Providing and fixing PTMT angle stop cock 15 mm
nominal bore. Weighing not less than 85 gms. 8.00
Providing and fixing washbasin with single hole for pillar
tap with C.I. or M.S. brackets painted white including
75 sutting holes and making good the same but excluding EACH
fittings.(A) Vitreous China:(ii) Flat Back washbasin
mm x v 400mm size. (i) In white colour.
Providing and fixing stone slab table rubbed, edges
rounded and polished of size 75x50cm deep and 1.8cm
thick fixed in Urinal partitions by cutting a chase of
appropriate width with chase cutter and embedding the
76 stone in the chase with epoxy grout or with cement SQM
concrete 1:2:4 (1cement: 2coarse sand: 4graded stone
aggregate 6mm nominal size) as per direction of
Engineer-in-charge and finished smooth. Granite Stone
of approved shade.
Providing and fixing Urinal or approved quality including
conecting the Urinal with waste pipe , pressmatic type
tap etc. complete.(A) White earthenware flat back or 3.00 1,026.01
corner type size 430mm x 260mm x 350mm.
Providing and fixing wsh down water closet (European
type, W.C. Pan) with integral P or S trap including jointing
the trap with soil pipe in Cement Mortar 1:1 (1-Cement : 3.00 1,290.80
1-fine sand) (Seal and cover to be measured and paid for
separately)(A) vitreous China Pattern :(i) in white colour
Providing and fixing 12.5 Litres low level flushing cistern
with a pair, of C.I. or Mild brackets, complete with
fittings such as lead valve less syphon, 15mm nom.nal
size brass ball valve with polythene float, C.P brass
handle unions and couplings for connections, with inlet,
outlet and overflow pipes, 40mm dia. porcelain 3.00 2,321.21
enamelled flush bend including cutting holes in walls and
making good the same connecting the flush bend with
cistern and closet (overflow pipe to be measured and
paid for separately)(A) Vitreous China (I) In white colour
Providing and fixing chromium plated brass Metropole of
80 approved quality including fixing in pipe line etc. EACH
complete.(ii) 25mm dia.
81 Providing and fixing toilet paper holder.(A) C.P.Brass EACH
82 Health Fauset Heavy duty with hook with fitting EACH
Providing and fixing PVC SWR Nahni trap IS 14735 for
drain - 100 mm diameter with jali of the following
83 nominal diameter of self cleansing design with C.I scread EACH
down or hinged grating including the cost of cutting and
making good the walls.
Providing and fixing soundproof Multilayer Polyproplene
piping system as per EN 1451-Part 1-6 with 3 layer pipe
made of PP + PP-MD + PP and one layer fittings in PP
MD, push-fit type,Halogen and Calcium free, having high
impact resistance as per DIN EN ISO 291:2008-08 , Ring
stiffness SN6 6KN/m2 as per ISO 9969, offering sound
levels of 19 dBA as per EN 14366 at a flow rate of 4 l/s,
water tightness as per EN 1451-1 minimum of 0.5 bar for
15 minutes, density of pipe = 1.15gms/cm3, elongation =
0.09mm/mn/K and E modulus 2300-3000 as per ISO
along with factory fitted EPDM lip ring, Fire Behavior 75.00 1,092.00
Classification according to EN 13501-1:2009 & classified
D-s2-d2 (EN 13501-1), meets the requirements of EN
4102-2 with Fire Classification B2, Smoke Development
Category Q1 & Drip Formation category TR1. Inclusive of
all necessary specials like bends, tees,clean out plug,
offsets, junctions, door piece, cop, cleanouts etc., laid
under the slabs/ Walls with suitable clamps, Pedestals
and specials curing etc., complete . Fabricated GI bracket
of suitable size to be provided for pipes,Galvanised
rubber sleeved clamps/ u bolts, brackets, passivated
fasteners & legend boards shall be included in the price
(suspended plumbing , plumbing Shaft & basement) All
types of Fittings, Bends and pipes rate should be
inclusive in item rate.
Providing erecting and fixing double coated ISI water tank of
85 required capacity each with all necessary fittings and Litre
connection etc. complete on terrace
The Rates are Exclusive of G.S.T. Prevaling G.S.T Will be paid Seperatly.
Contractor’s Quoted Rate: -
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl.City Engineer ( West Zone )
As per account department(A.M.C.) circular no. 56, Dt.19/09/2016 Bank
guarantee of said work must be of Ahmedabad city branch, which mentioned
(A) Guarantee issued by following bankswill be accepted as SD/EMD on
permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the
period up to March 31,
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(2) RBL Bank (The Ratnakar Bank Ltd.)
(3) IndusInd Bank.
(4) Karur Vysya Bank.
(6) FEDERAL Bank.
(7) SOUTH INDIAN Bank.
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Mehsana Urban Co-Operative Bank Ltd.
(4) Nutan Nagarik Sahakari Bank Ltd.
(5) Saurashtra Gramin Bank.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SPECIAL CONDITION OF CONTRACT
1.0 The Contractor shall have to maintain all required registers for quality control, material
management and progress of the work as per the AMC's prevailing circulars and as directed by
engineer- in-charge on daily basis.
1.1 Contractor has to manage proper storage of all the materials.
1.2 Contractor has to use good shuttering material for the project.
1.3 Contractor has to take all risk policy & workman compensation policies of the project & should
be effective up to handing over the possession. Incase of any Incident i.e. fatal accident that
occurs at site, complete responsibility will be of the Contractor.
1.4 Contractor is responsible for all liasioning for seeking all the permission required during the
1.5 Municipal Commissioner reserves the rights to reduce / increase the scope of work up to any
extent without assigning reason thereof and the contractor has to execute the BOQ items at his
1.6 All rates quoted by the contractor to be inclusive of all applicable taxes (GST).
1.7 The Contractor shall make his own arrangements for the engagement of all staff and labour,
local or other, and for their payment, housing, feeding, transport and other facilities according
to prevailing labour laws.
1.8 AMC may at its discretion no coplains/no work for a period, single or multiple works at any
given time. once the work is given by SMS, Phonecalls, Whatsapp, Letter; the contractor has
to attend the work within 24 hours. Failure of the same shall invite penalty of 10,000/- per
occurance. Repeated failure of more than 3 times, the contractor shall be blacklisted. No
further claim shall be entertained and the work shall be carried out of current market rate
and supervision charges of 27% at the risk and cost of contractor after the due date of
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall
only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard
shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the material
and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or
materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (five percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE & STAMP ADDL.CITY ENGINEER
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Monthafter the order to start the works. Progress of work
should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the
traffic. He shall be responsible for any damage to public. If any incident happen, during the
execution of work. In case of dispute for unseen or overlooked items the decision of the Dy. City
Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work
and at the time of completion of work and hand over the site with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this
risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him.
No claim for extra rate for subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the
Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer
on his own during the period. If any tenderer withdraw or makes any modifications or addition in
the terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the
work the penalty of Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate
bills payable to the contractor. Contractor has to make his own arrangement for procurement of
steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in
form of demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the Employer”) invites
sealed Tender document from reputed and qualified bidders for the construction of Works
detailed in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No. value of works (Rs.) Period
1 Renovation of Mini Sports Rs. 81,67,814.55 Rs.81,680.00 12 Months
Complex Ground Area Near
Municipal School No.17 at GST
Bhawan Cross Road in
Navrangpura ward at west zone.
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 2400.00 in the form of Demand
Draft / Pay Order from any Nationalised Bank in favour of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works
in the above Table payable at Ahmedabad and drawn in favour of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to be
specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd Floor,Dr.
Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad Municipal
Corporation, 2nd Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013. in the presence of bidders or their
representatives who choose to attend. In the event of the specified date of bid
submission/opening being declared a holiday for the Employer, the bids shall be received
/opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender
fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/
Speed Post/ Hand Delivery in duplicate. The Bid envelopes shall be marked as follows:-
➢ Tender Document
➢ Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received
for the package (except those received late) containing the sealed Tender volume and other
enclosures then announce the names of bidders in the presence of bidders or their representatives
who choose to attend on the date and time mentioned in the NIT In the event of specified date of
bid opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer
at the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and
validity of EMD furnished with each bid, is valid registration and such other details, as the Employer
may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the Employer
as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the
bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified in
the bid documents and is substantially responsive to the requirement of the bidding documents
and provides any clarification for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria
then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid
Price, provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify
the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving
letter of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished
by him in his bid. Such request by the Employer and the response by bidder shall be in writing or by
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter
its premises and lands for the purpose of such inspection, but only upon the express condition
that the bidder, its personnel and agents, will release and indemnify the Employer and its
personnel and agents from and against all liability in respect thereof and will be responsible for
death or personal injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
➢ The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
➢ All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly
as Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful
bidder shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E.
Circular.in the form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5%
(five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the balance
period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. &
As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding
GST) etc. on material procurement or any other component for the works from any source shall be
borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall
be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any
other state Govt. or institutions. Copy of registration should be attached with tender document.
Tenderer who was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department
with the correction slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2
liquidated damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the
Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as
reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific
mention for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall
not absolve the contractor from the responsibility of replacing defective materials brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such materials being rejected by the Engineer
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect
before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from
the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works & all precautionary measures during execution shall have to be
kept in sufficient numbers and in good working condition at the site of the work. All excavated trench
shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor shall be considered only if the contractor provided satisfactory evidence that
such special mode of construction and completion of work to the required strength and quality.
Acceptance of the same by the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the course of exaction or
completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor
Mineral Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian
Standard) shall be taken to engrave the safety of men, materials and machinery on the work and also of
the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of
actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be
executed & as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor.
The contract agreement shall have to be executed between AMC & the agency to which work is
awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order
shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution .Within 15 days contractor has to submit SD and after reciveing SD work order
shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand
draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to
sign contract paper with AMC. The contractor shall be fined 4% of interest per year for delay in
submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or
His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification
and the Engineer -in-charge shall make such corrections and interpretations as necessary to fulfill the
intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will
be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the
rates keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking, washing,
sanitation and cleaning down. The contractor will be responsible for all the costs where applicable of
connection, meter installation, water consumed, water required for testing purposes, disconnection
and the laying, maintenances and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor must
make his own arrangements with the Corporation and Electricity Supply Authorities and with other
contractors to connect and to take a supply from such services, paying all costs in connection
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of
the work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the
work. No compensation shall be paid for idle labor staff, machineries and for use of diesel operating
sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance
certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance
32. The contractor shall get the electrical works executed through the authorized Government approved
licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total
amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be
rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No any
claim to that effect shall be entertained. The Municipal Commissioner also reserves the right to reject
any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special
reason (like site is not available and due to unavoidable circumstances arise), after evaluation of
situation the actual date of starting of work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done
by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of work should
be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and
instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may
be brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of work.
In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final.
The contractor shall have to give site clean of all rubbish during the work and at the time of completion
of work and hand over the site with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart
daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor
shall have to prepare through of bigger size and mix the mortar in the required proportion. In
on case he shall be allowed to mix the mortar either on floor or any finished surfaces. The
contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item
is not available in SOR than based on current market rates. In case of extra item decision of Add. City
Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraw or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of
start shall be recovered separately from the immediate bills payable to the contractor. Contractor has
to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
v) Conditional tender shall not be accepted.
vi) All tenders are to be submitted in duplicate without which the tenders are liable to be
vii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
viii) Condition of Form - B1 Standard Specification of material & code of practice will be applicable.
Form B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of
Gujarat booklets of Building Works & and Road Works Specifications published by Gujarat
Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
(ENGINEERING DEPARTMENT-WEST ZONE)
Construction of Mini Sports Complex A Navrangpura, Ahmedabad.
TENDER DOCUMENT
Technical Specification for Civil Work
Municipal Commissioner
Ahmedabad Municipal Corporation.
Sardar Patel Bhavan, Danapith,
GENERAL SPECIFICATION
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Name of Work: Renovation of Mini Sports Complex Ground Area Near Municipal School
No.17 at GST Bhawan Cross Road in Navrangpura ward at west zone.
TECHNICAL SPECIFICATIONS CIVIL WORK
Excavation for foundation up to 1.5 M. depth including sorting out and stacking of un useful
materials and disposing off the excavated stuff up to any lead and lift. (Executed with Mechanised
Efforts Machinery) Excavated earth / Stuff to be stacked, refilled with good earth to the foundation &
Plinth and surplus earth disposed at non objectionable place to be found by the Contractor. No extra
payment will be made for shoring, strutting, stabilising and dewatering. Loose or soft soil
Excavation for foundation / for cable trench, plumbing and other ancillary work for all kind of soils for
depth from 0 M. to 1.5 M. including sorting out and stacking of useful materials and Carting away and
Disposing off the Excavated Stuff (Unsuitable or Surplus), serviceable material, unserviceable material /
debris by demolition and breaking RCC members, masonry structure, pipelines, debris etc. For all lift
and lead outside premises. Any kind of measures require for soil stabilization during excavation will be
solely responsibility of contractor including design and execution. Contractor to quote excavation item
rates considering above measures and No extra payment will be made for Royalty fees for excavated
and carting away earth. Selected Excavated earth / Stuff of required quantity in back filling is to be
stacked and surplus earth disposed at non objectionable place to be found by the Contractor.
(Executed with Mechanised Efforts Machinery)
Excavation for foundation in all kind of soil including sorting out and stacking of useful materials and
disposing of the excavated stuff for all lead, including dewatering and excavating debris excluding
backfilling the trenches/ foundation etc. complete, as directed. No extra payment will be made for
shoring, strutting, stabilizing and dewatering. Depth up to 1.5 meter. The depth of the foundation shall
be as per the item description.
Mode of Measurement & Payment:
Rate shall be paid for a unit of one cum.
Excavation for foundation up to 1.5 M. depth including sorting out and stacking of un useful
materials and disposing off the excavated stuff up to any lead and lift. (Executed with Mechanised
Efforts Machinery) Excavated earth / Stuff to be stacked, refilled with good earth to the foundation &
Plinth and surplus earth disposed at non objectionable place to be found by the Contractor. No extra
payment will be made for shoring, strutting, stabilising and dewatering. Loose or soft soil
Relevant Specification of Item No: 01 should be followed but for foundation up to 1.5 to 3.0 M. depth
Mode of Measurement and Payment:
The measurement of excavation in trenches for foundation shall be made according to the sections of
trenches shown on the drawing or as per sections given by the Architect and Engineer-in-charge. No
payment shall be made for surplus excavation made in excess of above requirements or due to
stepping and sloping back as found necessary, on account of conditions of soil and requirements of
safety. The rate shall include for clearing the site, surface dressing, making layout of the building, fixing
permanent grid points with MS iron posts, embedded in C.C. 1:2:4, placed sufficiently away from the
building and establishing bench marks etc. The rates shall include for necessary shoring, timbering and
strutting for protection of sides of the excavated trenches and pits, pumping out rain or surface water
at any stage of construction so as to keep the trenches/pits dry, to the satisfaction of the
Architect/Engineer-in-charge. The rate shall include levelling and ramming the bottoms of excavations
to receive concrete, etc. including trimming to slope wherever necessary etc. complete. The rate shall
be for a unit of one m3.
Filling with excavated earth in trenches, plinth, sides of foundation, inside the plot of low level Area
in layers of 20cm. thickness including breaking clods, dressing with all lead and lift, Royalty fees,
transporting to site, spreading, grading to required slopes and including watering, rolling and
consolidation of in layers at O. M. C. to require dry density filling the depression which occur during
the process using power rollers 8T to 10T etc. complete.
Filling, in foundation trenches and plinths, with murrum or selected soil obtained from outside
(Contractor's earth) in layers of 20 cm. thickness, including watering to optimum moisture content,
ramming and compacting using mechanical vibrator including Royalty fees, transportation, loading,
unloading, screening, passes etc. all complete as directed by the Engineer-in-charge (Consolidated
measurements of fill shall be paid under this item). Murrum or selected earth brought from outside
shall be clean, of good binding quality and of approved quality obtained from approved pots/quarries
of disintegrated rocks which contain silicones materials and natural mixture of clay of calcareous origin.
The size of murrum shall not be more than 20 mm. and shall be approved by the Engineer-in-charge,
The relevant specifications of item no. 4.12 of General Technical Specification book for Building Works
shall be followed except that the murrum or selected soil brought from outside shall be filled in in
inside the plot of low level Area in 20 cm. layers, including consolidating, ramming well, watering,
dressing etc., complete.
Filling with available selected/ approved and stacked excavated earth (excluding rock and black cotton
soil) in inside the plot of low level Area etc., in layers not exceeding 20 cm. in depth, including breaking
the clods, watering to optimum moisture content, ramming and compacting by mechanical means of
suitable type of vibrator, including freight, transportation, loading, unloading, screening, passes etc. all
complete as instruction & directions of the Engineer-in-charge (Consolidated measurements of fill shall
be paid for under this item). The rates shall include for all leads and lifts including transporting using
mechanical / manual means within the campus area. The earth to be used for filling shall be free from
salts, organic or other foreign matter. All clods of earth shall be broken to a size not bigger than 50 mm.
filled with earth in layers not exceeding 20 cm. Each layer shall be adequately watered, rammed well
and consolidated before the succeeding layer is laid. The earth shall be rammed with mechanical
rammer / mechanical rollers of different capacity as per site condition. When filling reaches finished
level, the surface shall be flooded with water for at least 24 hours and allowed to dry and then rammed
and consolidated. The finished level of filling shall be kept to shape and gradient, intended to receive
any floor finish. In case of large heavy duty flooring like factory flooring, the consolidation may be done
by power rollers, where so specified or as directed. The extent of consolidation required shall also be as
specified or as directed. The excavated stuff of the selected type only shall be allowed to be used for
filling the trenches and plinths. Under no circumstances, black cotton soil shall be used for filling the
plinths. The soil used for backfilling shall have optimum moisture content (OMC). The compaction shall
be carried out to achieve Proctor density of 95%. The procedure for OMC and proctor density shall be
carried out as per relevant IS codes. The samples for test shall be as per the relevant IS codes. As soon
as the filling work in inside the plot of low level Area has been completed and measured,
Mode of Measurements and Payment:
The relevant specifications of item no. 4.12 of General Technical Specification book for Building Works
shall be followed. The rate includes cost of collecting and carting murrum or selected earth of approved
quality with all lead, lift and labour required for filling in inside the plot of low level Area. The rate shall
be for a unit of one m3. Only consolidated measurements of the fill shall be measured and paid for
under this item.
Carring out plinth treatment to post construction / existing structure by spraying chemical solution
for termite control treatment including labour and material consistment with I.S.I specification. Using
Chlordene and Chiorpurfiles 20 EC. As Per6131_part-III Consentration Weight one percent is
recommended i.e one litre 20 EC chemical emulsion with 19 liter give 1 % concrentration inclusive of
one litre chemical emulsion appication at the rate of 5 Litre chemical / Sqm of surface is
recommended as per I.S
Site Preparation
• Prior to commencement of post-construction anti-termite treatment, the plinth area, wall
junctions, and surrounding floor surfaces shall be thoroughly cleaned and made free from
debris, dust, loose soil, wood pieces, roots, vegetation, and obstructions.
• Any cracks, construction joints, expansion joints, or gaps at wall–floor junctions shall be clearly
identified before treatment.
• Treatment shall not be carried out during rainfall or when the moisture content of soil is
excessively high or when sub-soil water level is above the level of treatment.
• If termite galleries, tunnels, or mounds are observed within or around the plinth area, these
shall be broken and treated directly by pouring chemical emulsion into the holes prior to
general spraying.
Treatment of Plinth Area (Post-Construction)
• Post-construction chemical treatment shall be carried out by drilling holes of 12 mm diameter
at intervals of 150 mm c/c along the external and internal plinth wall junctions, expansion
joints, and cracks wherever required.
• The depth of drilling shall be 50 mm to 75 mm, ensuring penetration up to the soil below the
floor or along the plinth wall base.
• Chemical emulsion shall be injected uniformly into the drilled holes and sprayed over the plinth
surface and wall-floor junctions at a rate of 5 litres per Sqm of surface area, as recommended
in IS 6313 (Part-III).
• Special attention shall be given to critical areas such as:
❖ Junction of wall and floor
❖ Expansion joints
❖ Cracks and crevices
❖ External plinth perimeter
• After treatment, drilled holes shall be sealed properly using cement mortar to restore surface
Chemical & Application Details
• The chemical used for post-construction anti-termite plinth treatment shall be Chlordane /
Chlorpyrifos 20 EC, conforming to IS 6313 (Part-III).
• The recommended concentration shall be 1% by weight, prepared by diluting:
❖ 1 litre of 20 EC chemical emulsion with 19 litres of clean water to obtain 1%
• The prepared emulsion shall be applied uniformly using suitable sprayers / injection pumps
ensuring complete penetration and coverage.
• Application rate shall be 5 litres of chemical emulsion per Sqm of treated surface, as per IS
recommendations.
Health, Safety & Environment (HSE)
• All works shall be executed strictly in accordance with MSDS (Material Safety Data Sheet)
requirements to prevent accidents or health hazards.
• Concentrated chemicals shall not be used directly; only diluted emulsion as specified shall be
• Direct contact of chemical with skin, eyes, or mouth shall be strictly avoided.
iv. Mandatory safety measures:
❖ Wash hands thoroughly with soap after application
❖ Use protective mask, hand gloves, goggles, and safety shoes
❖ All personnel engaged shall wear appropriate PPE
❖ Equipment and spraying devices shall be checked as per HSE norms before use
Relevant / Reference Documents
i. The following standards shall be referred to, either in whole or in part:
• IS 6313 (Part-III): Code of practice for anti-termite measures in buildings (Post-Construction)
• All materials used for post-construction anti-termite treatment shall conform to IS 6313 (Part-
• Approved chemicals:
• Chlordane / Chlorpyrifos 20 EC
Water used for dilution shall be clean and free from impurities.
Mode of Measurement
The payment shall be made on the basis of plinth area measurement at ground floor only, measured
in Square Metres (Sqm), correct to two decimal places, for complete post-construction anti-termite
The rate shall be inclusive of:
• Cost of chemicals
• Labour charges
• Drilling, spraying, injection
• Tools, plants, equipment, sprayers
• Sealing of drilled holes
• All incidental works required to complete the operation as specified
Filling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including
watering, ramming and consolidating etc. complete.
Filling in plinth with sand under floors including watering, ramming, consolidating and dressing etc.
complete. (Royalty shall be paid by contractor and supporting document submitted to client for
Materials: Sand shall conform to M-6.
Filling, in foundation and plinth (under floors), with good quality coarse river sand, obtained from
outside, including watering, ramming well, consolidating and dressing etc. complete all as per
specification and direction of engineer-in-charge. The relevant specification of item no. 4.12 of General
Technical Specification book for Building Works shall be followed except that sand shall be filled in
foundations and in plinth, under floors, including watering, ramming well, consolidating and dressing
etc., complete.
Mode of Measurements and Payment:
The relevant specification of item no. 4.12 of General Technical Specification book for Building Works
shall be followed. The rate includes cost of collecting, carting good quality sand, with all lead, lift and
labour for filling the same in foundations and in plinth, mechanical compaction. The rate shall be for a
unit of one m3. Only consolidated measurements of the fill shall be measured and paid for under this
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate.
mm. nominal size) and curing etc. complete including cost of form work in Foundation and plinth.
Cement concrete 1:2:4 (1-Cement: 2-coarse sand: 4-crushed stone aggregates 20 mm nominal size) In
Foundation & plinth and curing complete Water shall conform to M-1. Sand to M-6. Cement to M-3.
Black trap stone aggregate 40/ 20mm mm. Maximum nominal size to M-13. Nominal mix design shall
be done as per IS
General: Cement concrete including cost of formwork, Shoring, strutting & dewatering if require etc.
No extra payment will be made for shoring, strutting and dewatering. Before commencing the
concreting, the depth and width of the excavated foundation shall be checked as per the drawing. The
bed of foundation trenches shall be cleared off of all loose materials, levelled, watered and rammed, as
directed. The concrete mix is not required to be designed by preliminary tests and only nominal mix as
per IS: 456-2000 shall be followed. The proportion of the concrete mix shall be 1:2:4 (1 cement:
coarse sand: 4 graded Black trap stone aggregate 20 mm. nominal size) by volume. All Concrete work
shall have fair finished concrete surface unless otherwise specified. Mix design shall be carried out for
environmental exposure condition as given in IS 456:2000 page 18 table 3. The nominal mix concrete
shall only be used for concrete grade lower than M15. The ingredients required for ordinary concrete
containing one bag of cement of 50 Kg. by weight (0.0347 m3.) for different proportions of mix shall be
as under: (as per IS 456:2000 Table 9 pg. 23)
Grade of Total Qty. of Dry aggregate by mass Proportion of fine Qty. of water per
Concrete per 50 kg of cement to be taken as aggregate to coarse 50kg of Cement,
the sum of individual mass of fine aggregate (Maximum) liters
and Coarse aggregate, (Maximum)
M 10 ( 1:3:6 ) 480 Generally 1:2 for FA
to CA by volume but
subject to upper limit
of 1:1.5 and lower
The proportion of the fine to coarse aggregates shall be adjusted from upper limit to lower limit
progressively as the grading of fine aggregates becomes finer and the maximum size of coarse
aggregate becomes larger. Graded coarse aggregate shall be used. For an average grading of fine
aggregate (Zone II of table 4 of IS 383), the proportions shall be 1:1.5, 1:2 and 1:2.5 for the maximum
size of aggregates 10mm, 20mm and 40mm respectively. The water cement ratios shall not be more
than those specified in the above table. The cement of the mix specified in the table shall be
proportionately increased, if the quantity of water in a mix has to be increased to overcome the
difficulties of placement and compaction so that the water cement ratio specified in the table is not
exceeded. The workability of the concrete shall be controlled by maintaining a water-cement ratio that
is bound to give a concrete mix which is just sufficiently wet to be placed and compacted without
difficulty, with the means available. The maximum size of coarse aggregate shall be as large as possible
within the limits specified but in no case greater than 1/4th of the minimum thickness of the member,
provided that the concrete can be placed without difficulty so as to surround all reinforcement
thoroughly and to fill the corners of the form. For reinforced concrete work, coarse aggregates having
maximum nominal size of 20 mm. are generally considered satisfactory. For heavily reinforced concrete
members as in the case of ribs of main beams, the nominal maximum size of coarse aggregate should
usually be restricted to 5 mm. less than the minimum clear distance between the main bars, or 5 mm.
less than the minimum cover to the reinforcement, whichever is smaller. Coarse and fine aggregate
shall be batched separately. All in aggregate may be use if specified by Engineer-in-charge. Admixture
(chloride free) may be used in concrete only with approval of the Engineer-in-charge based upon the
evidence that with the passage of time, neither the compressive strength of concrete is reduced nor
are other requisite qualities ofconcrete and steel impaired by the use of such admixtures. The cost of
the formwork shall be included. For hot and cold weather precautions to be taken are as follow:
Temperature of coarse aggregate shall be maintained as per IS specifications by use of Ice Flakes for
mass concrete. In hot weather, ice flakes shall be added in the concrete or aggregate shall be kept cool
by sprinkling water. Necessary corrections shall be performed in the mix design of the concrete. Coarse
aggregate shall be stored under shed in case of hot weather temperature. Avoid concreting in the
noontime in case of hot weather and during night time in case of Cold weather. In hot weather, the
formwork shall be sprinkled with water before commencing the concrete work.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
Kg. weight. The volume of one such bag being taken as 0.0347 m3. Boxes of suitable sizes shall be used
for measuring sand and aggregate. The size of the boxes (internal) shall be 30 cm. x 30 cm. and 38 cm.
deep or as per the convenience of the contractor. The Internal volume of the box shall be taken as
0.0347 m3. While measuring the aggregate and sand, the box shall be filled without shaking ramming
or hammering. The proportioning of sand shall be on the basis of its dry volume and in case of damp
sand; allowances for bulkage shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and maintained throughout the construction. The mixer shall
comply with IS 1791 and IS 12119. Measured quantity of aggregate, sand and cement required for each
batch shall be poured into the drum of the mechanical mixer while it is continuously running. After
about half a minute of dry mixing, measured quantity of water required for each batch of concrete mix
shall be added gradually and mixing continued for another one and a half minute. Mixing shall be
continued till materials are uniformly distributed and uniform colour of the entire mass is obtained and
each individual particle of the coarse aggregate shows complete coating of mortar containing its
proportionate amount of cement. In no case shall the mixing be done for less than 2 minutes after all
ingredients have been put into the mixer. When hand mixing is permitted by the Engineer-in-charge for
small jobs or for certain other reasons, it shall be done on a smooth watertight platform large enough
to allow efficient turning over the ingredients of concrete before and after adding water. Mixing
platforms shall be so arranged that no foreign material gets mixed with concrete nor does the mixing
water flow out. Cement in required number of bags shall be placed in a uniform layer on top of the
measured quantity of fine and coarse aggregate, which shall also be spread in a layer of uniform
thickness on the mixing platform. Dry coarse and fine aggregate and cement shall then be mixed
thoroughly by turning over to get a mixture of uniform colour. Specified quantity of water shall then be
added gradually through a rose-can and the mass turned over till a mix of required consistency is
obtained. In hand mixing, quantity of cement shall be increased by 10 % above that specified. 3.2.3
Mixers, which have been out of use for more than 30 minutes, shall be thoroughly cleaned before
putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first batch of
concrete from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing
plant shall be thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with IS : 1199-1959. The slump of
10 mm. to 25 mm. shall be maintained for workability. The concrete shall be compacted with vibrator -
needle or surface type depending on the nature of application.
Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms, to
permit him to inspect and accept the false work and forms as to their strength, alignment and general
fitness but such inspection shall not relieve the Contractor of his responsibility for the safety of men,
machinery, materials and for results obtained. Immediately before concreting, all forms shall be
thoroughly cleaned. Contractor shall proper access with railing for inspection of work. centring design
and its erection shall be got approved from the Engineer-in-charge. One carpenter with helper shall
invariably be kept present throughout the period of concreting. Movement of labour and other persons
shall be totally prohibited after reinforcement is laid in position. For access to different parts, suitable
mobile platforms shall be provided so that steel reinforcement in position is not disturbed. For ensuring
proper cover, mortar blocks/ PVC cover of suitable size and thickness as per the drawing shall be tied to
the reinforcement. Timber, kapachi or stone pieces shall not be used for this purpose. For exposed
concrete members PVC blocks of grey colour shall only be used. All formwork shall be cleaned and
made free from standing water, dust, snow or ice immediately before placing of concrete. No concrete
shall be placed in any part of the structure until the approval of the Engineer-in-charge has been
The shuttering to be provided shall be of ordinary timber planks shall conform to M-26A. Shuttering
plywood shall conform to M-26B.The dimensions of scantling and battens shall conform to the design.
The strength of the wood shall not be less than that assumed in the design.
For concrete shuttering material shall be as follows:
Moulds from marine ply with wooden battens or steel plates
Straight walls / Curved wall in plan :
Marine plywood with wooden battens / Acro make or equivalent makes steel plates and soldiers.
Steel plates and marine ply with battens
The form work shall conform to the shape, lines and dimensions as shown on the drawings and shall be
so constructed so as to remain sufficiently rigid and water-tight, during the placement and compaction
of the concrete. Adequate arrangement shall be made by the Contractor to safe guard against any
settlement of the form work during the course of concreting and after concreting. The form work of
shuttering, centring, scaffolding, bracing, etc. shall be as per the design. Cleaning & Treatment of
Forms: All rubbish, particularly chipping, shaving and saw dust shall be removed from the interior of the
form before the concrete is placed and the form work in contact with concrete shall be cleaned and
thoroughly wetted or treated. The surface shall be coated with soap solution, applied before concreting
is done. Soap solution for the oil or from oil of approved manufacture may be applied, in case steel
shuttering is used. Care shall be taken that the coating is not applied on the construction joints surface
and steel reinforcement bars.
In normal circumstances and where ordinary Portland cement is used, form work may be struck after
expiry of the following periods:(a) Sides of walls columns and vertical faces of beams 24 to 48 hours.
(b)Beam soffits (Props left under) 7 days. (c)Removal of props for slabs - (i) Slabs spanning up to 4.5 m.
7 days. (ii) Slabs spanning over 4.5 m. 14 days. (d)Removal of props to beams and Arches (i) Spanning
up to 6 m. 14 days. (ii) Spanning over 6 m. 21 Days.
The Engineer-in-charge shall be informed in advance by the Contractor of his intention to strike the
formwork. While fixing the time for removal of formwork, due consideration shall be given to local
conditions, character of the structure, the weather and other condition that influence the setting of
concrete and of the materials used in the mix. In normal circumstances (generally where temperature is
above 20Degree) and where ordinary concrete is used, forms may be struck after expiry of periods
specified in IS 456:2000 11.3.1 page 25 for respective item of formwork or mentioned above. All
formwork shall be removed without causing any shock or vibration as would damage the concrete.
Before the soffit and struts are removed, the concrete surface shall be gradually exposed, where
necessary in order to ascertain that the concrete has sufficiently hardened. centring shall be gradually
and uniformly lowered in such manner as to permit the concrete to take stress due to its own weight
uniformly and gradually. Where internal metal ties are permitted, they or their removable parts shall
be extracted without causing any damage to the concrete and remaining holes filled with mortar. No
permanently embedded metal part shall have less than 25 mm covers to the finished concrete surface.
Where it is intended to re-use the formwork, it shall be cleaned and made good to the satisfaction of
the Engineer-in-charge. After removal of formwork and shuttering the Engineer-in-charge shall inspect
the work and satisfy by random checks that concrete produced is of good quality. The number of props
left under, their sizes and disposition shall be such as to be able to safely carry the full load of the slab,
beam or arch as the case may be together with any live load likely to occur during curing or further
construction. Immediately after the removal of forms, all exposed bolts etc. passing through the
cement concrete member and used for shuttering or any other purpose shall be cut inside the cement
concrete member to a depth of at least 25 mm. below the surface of the concrete and the resulting
holes are filled by cement mortar. All fine mortar lines caused by form joints, all cavities produced by
the removal of form ties and all other holes and depressions honeycomb spots, broken edges or
corners and other defects shall be thoroughly cleaned saturated with water and carefully pointed and
rendered true with mortar of cement and fine sand. Considerable pressure shall be applied in filling and
pointing to ensure thorough filling in all voids. Surfaces, which are pointed, shall be kept moist for a
period of 24 hours. For repairing concrete members, suitable bonding agent shall be used as directed
by the consultant. If rock pockets/honeycombs in the opinion of Engineer-in-charge are of such an
extent or character so as to effect the strength of the structure, materially or to endanger the life of the
steel reinforcement, he may declare the concrete defective and require the removal and replacement
of the portion of the structure affected with no extra cost
The centring to be provided shall be got approved. It shall be sufficiently strong to ensure absolute
safety of the form work and concrete work before, during and after pouring concrete. Carpenter and
helper shall be invariably be kept present to watch the behaviour of centring and form work is
satisfactory during concreting. Erection should also be such that it would allow removal of forms in
proper sequence without damaging either the concrete or the forms to be removed. The props of
centring shall be provided on firm foundation or base of sufficient strength to carry the loads, without
any settlement. The centring and form work shall be inspected and approved by the Engineer-in-
charge, before concreting. But this will not relieve the Contractor of his responsibility for strength,
adequacy and safety of form work and centring. If there is a failure of form work or centring, the
Contractor shall be responsible for the damages to the work, injury to life and damage to property.
Scaffolding and staging:
All scaffolding, hoisting arrangements and ladders, etc. required for facilitating of concreting shall be
provided and removed on completion work by Contractor, at his own expense. The scaffolding, hoisting
arrangement, ladders etc. shall be strong enough to withstand all live, dead and impact loads expected
to act and shall be subject to the approval of the Architect and Engineer-in-charge. However,
Contractor shall be solely responsible for the safety of the scaffolding, hoisting arrangement, ladders,
work and workmen, etc. The scaffolding, hoisting arrangements and ladders shall allow easy approach
to the work spot and afford easy inspection.
Before re-use, all forms shall be inspected by the Engineer-in-charge and their suitability shall be
ascertained. If, any of the forms are found to be unsuitable, they shall be immediately removed from
the site. The forms ascertained for re-use, shall be scarred, cleaned, and joints gone over and repaired,
wherever required. The inside surface shall be retreated to prevent adhesion to concrete.
Transportation, laying and compaction:
The method of RMC transporting and placing concrete shall be as approved by Engineer-in-charge.
Concrete shall be so transported and placed that no contamination, segregation or loss of its
constituent material takes place. Concreting shall proceed continuously over the area between
construction joints. Fresh concrete shall not be placed against concrete, which has been in position for
more than 30 minutes, unless a proper construction joint is formed. Concrete shall be compacted in its
final position within 30 minutes of its discharge from the mixer. Except where otherwise agreed to by
the Engineer-in-charge, concrete shall be deposited in horizontal layers to a compacted depth of not
more than 0.45 m. when internal vibrators are used and not exceeding 0.3 m. in all other cases. Unless
otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a height
exceeding 2 m. when trucking or chutes are used they shall be kept closed and used in such a way so as
to avoid segregation. When concreting has to be resumed on a surface, which has hardened, it shall be
roughened, swept clean, thoroughly wetted and covered with a 13-mm. thick layer of mortar
composed of cement and sand in the same ratio as in the concrete mix itself. This 13-mm. layer of
mortar shall be freshly mixed and placed immediately before placing of new concrete. Where concrete
has not fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or bristle
brushes, care being taken to avoid dislodgment of any particles or coarse aggregate. The surface shall
then be thoroughly wetted, all free water removed and then coated with neat cement grout. The first
layer of concrete to be placed on this surface shall not exceed 150 mm. in thickness and shall be well
rammed against old work, particular attention being given to corners and close spots. All concrete shall
be compacted to produce a dense homogeneous mass with the assistance of needle or surface
vibrators/ iron rammer, unless otherwise, permitted by the Engineer-in-charge for exceptional case,
such as concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable
condition shall be kept at site so that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before the
initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During compaction, it
shall be observed that needle vibrators are not applied on reinforcement, as it tends to destroy the
bond between concrete and reinforcement.
Sampling and testing of concrete:
The contractor shall set up a site laboratory to carry out various tests as specified. The laboratory shall
include equipment like cube testing machine, slump cone, cube molds for concrete and mortar,
mechanical balance, sieve set, flakiness testing apparatus, core cutter etc.
Samples from fresh concrete shall be taken as per IS: 1199 and cubes shall be made, cured and tested
at 7 days or 28 days as per requirements in accordance with IS : 516. A random sampling procedure
shall be adopted to ensure that each concrete batch shall have a reasonable chance of being tested i.e.
the sampling should be spread over the entire period of concreting and cover all mixing units. The
minimum frequency of sampling of concrete of each grade shall be in accordance with following:
Quantity of Concrete in Work Nos of Sample of Concrete for testing of 28 days
51 M3and Above 4 Plus One Additional for each 50 M3or part thereof
NOTE: At least 1 sample shall be taken from each shift. Three test specimens shall be made for each
sample for testing at 28 days. Additional samples must be taken to determine strength at 7 or 3 days or
at the time of striking the formwork, or to determine the duration of curing, or to check the testing
error. The samples of concrete shall be taken on each day of the concreting as per above frequency.
The number of specimens may be suitably increased as deemed necessary by the Engineer-in-charge
when procedure of tests given above reveals a poor quality of concrete and in other special cases. The
test results of the sample shall be average of the strength of 3 specimens. The individual variation shall
not be 15% of the average strength of the sample. The compressive mean strength for the group of
non-overlapping consecutive test results shall be as per col. 2 table 11 of IS 456:2000 and individual
test results shall be as per col. 3 of table 11 of IS 456:2000.
Mode of Measurements and Payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The
concrete laid in excess of section shown on drawing or as directed shall not be measured. No deduction
shall be made for: (as per SP 27) Ends of dissimilar materials such as joists, beams, posts, girders,
rafters, purlin trusses, corbels and steps etc. up to 500 cm2. in section. Architectural openings up to
m2. No extra labor should be paid for forming such openings, voids or pockets of any shape. The rate
includes cost of all materials, labor, tools and plant required for mixing, placing in position, vibrating
and compacting, finishing as directed, curing and all other incidental expenses for producing concrete
of specified strength, for all floors as per BOQ Provision, all shapes at any height and level, and in any
position. No extra payment will be made towards Shoring, strutting, Dewatering if require The rate
shall be for a unit of one m3.
The cost of the formwork shall be included as per the item description.
Providing and laying in position Ready Mixed Concrete M-30 Grade controlled concrete reinforced
cement concrete work For Foundation Footings (Individual, Combined, Strip and raft) using cement
content and required admixtures in recommended proportions as per IS : 9103, as per approved
design mix manufactured in fully automatic batching plant and transported to site of work in transit
mixer having continuous agitated mixer manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of RMC from transit mixer to site of laying, excl.
the cost of reinforcement but including the cost of centering, shuttering, finishing and cost of
admixtures in recommended proportion as per IS 9103 to accelerate / retard setting of concrete,
improve workability without impairing strength and durability as per direction of Engineer In charge.
Minimum Cement Content as per latest IS 456 shall be maintained (Cment Level 475 kg.). Without Fly
The designation of ordinary concrete M-100, M-150, M-200, M-250, M-300, M-350 is specified as per
I.S. Corresponding approximately to 1:3:6, 1:2:4, 1:1/2:3 and 1:1:2 nominal mix of ordinary concrete by
volume respectively.
RMC Cement concrete delivered at site should be workable and should satisfy all the required standard
tests like cube test and slump test etc., as specified in code of practice. Samples taken at site only will
be deciding factor. Department will not have any direct contact in matters relating to payment, delivery
schedule, quality of concrete etc. It is the responsibility of contractor ensures proper co-ordination for
the timely supply of concrete and approved quality product. Contractor has to make arrangement for
proper approach road (for which nothing extra shall be paid for) to enable the vehicle carrying concrete
to move freely without any extra cost to the department before ordering the concrete. However
existing approach road may be made use of for this purpose. Contractor has to ensure proper strong
shuttering / centring to receive the concrete at all heights. Contractor has to indemnify the department
arising out of possible dispute with the manufacturers. The design mix of RMC for the manufacturer /
supplier of RMC has to be obtained well in time and approval of Engineer in Charge to be obtained
prior to use. The design mix should be based on latest IS 456. This approval has to be obtained
whenever the design mix is changed. The RMC should be supplied confirming to the approved design
mix which shall be continuously checked during the progress of work. All the quality checks as per IS
stipulations should be scrupulously followed during the concreting. The work shall be carried out at all
heights as shown in Bill of Quantities. The relevant specifications of item no 06 shall be followed except
that the concrete mix shall be designed from preliminary tests the proportioning of cement and
aggregates shall be done by weight and necessary precautions shall be taken in the production to
ensure that the required work cube strength is attained and maintained. The letter "M" refers to mix
and numbers specify 28 days’ works cube compressive strength of 150 mm. cubes of the mix expressed
in N/mm2.Before carrying out the design mix contractor shall confirm the exposure condition for the
design of concrete. Mix design shall be carried out for environmental exposure condition as given in IS
456:2000 page 18 table 3. All concrete work shall have fair finish concrete surface unless otherwise
Water shall confirm to M-1, Cement to M-3, sand to M-6. Graded stone aggregate 20mm nominal size
to M-13. Measurement and storage of materials: measurement and storage of materials shall be done
in accordance with the requirements of IS: 456:2000. The concrete shall be designed as per relevant
latest IS code- IS 10262 and SP 23, with or without chemical admixture to provide the grade of concrete
having required workability and characteristic strength as per IS 456:2000. The proportion of cement,
sand and coarse aggregates shall be determined by weight. The weight batch machine shall be used for
maintaining proper control over the proportion of aggregates as per mix design. The design mix shall be
got approved by Engineer in-charge before starting the concrete work. The minimum cement content
shall depend on the exposure condition of the concrete. The minimum cement content given in table
(IS 456:2000, table 5) shall be adopted irrespective of whether the contractor achieves the desired
strength with less quantity of cement. The strength requirements of different grades of concrete shall
Grade of Compressive strength of 15 cm. cubes in N/mm2. Concrete at 7 and 28 days
Concrete conducted in accordance with IS : 516-1959.
At 7 Days At 28 Days Max size of agg. In mm
In all cases, the 28 days compressive strength specified in above table be the criteria for acceptance or
rejection of the concrete. Where the strength of a concrete mix as indicated by tests, lies in between
the strength of any two grades specified in the above table, such concrete shall be classified in for all
purposes as concrete belonging to the lower of the two grades between which its strength lies. The
Contractor shall take necessary care to avoid sand streaks, air holes, honey combining etc., on finished
concrete surface.
Basis of Supply:
Depending upon the agreement the ready mix concrete shall be supplied on either of the following
basis: a) Specified strength based on 28-day compressive strength of 15cm cubes tested in accordance
with IS: 456-2000.b) Specified mix proportion.
When the concrete is manufactured and supplied on the basis of specified strength, the responsibility
for the design of mix shall be that of the contractor and the concrete shall confirm to the requirements
specified. Mixing, consistency, inspection, transportation and laying, formwork for concrete: These
shall be same as per Item No:06
General Requirements:
The minimum cement content for the various mixes shall be 475 Kg/cum or as per Mix Design
whichever is higher and the details regarding proportioning and works control shall be in accordance
with IS: 456:2000 or our specification stated. When a transit mixer is used for transportation of
concrete, no extra water should be added to the concrete from elsewhere after initial introduction of
mixing water from the batch, except when on arrival at the site of the work, the slump of the concrete
is less than that specified: such additional water to bring the slump within required limits shall be
injected into that specified: such additional water to bring the mixer under such pressure and direction
of flow that requirements for uniformity are met. When a transit mixer is used for transporting
concrete, the concrete shall be delivered to the site of the work and discharge shall be complete within
one and half hour (when the prevailing atmospheric temperature is at or below 20 degree Celsius) of
adding the mixing water to the dry mix of cement and aggregate or of adding the cement to the
aggregate whichever is earlier. The compressive strength and slump test shall be performed by third
party or outside laboratory is required. It is most important to keep the specified water cement ratio
constant and at its correct value. To this end, moisture content in both fine and coarse aggregates shall
be determined by the Engineer-in-charge, according to the weather conditions. The amount of mixing
water shall then be adjusted to compensate for variations in the moisture content. For the
determination of moisture content in the aggregates, IS: 2386 (Part III) shall be referred to. Suitable
adjustments shall also be made in the weights of aggregates due to variation in their moisture content.
The bars shall be kept in position by the following methods:
In case of beam, slab, wall and column, sufficient number of PVC block or precast cover block in cement
mortar 1:2 (1 cement: 2 coarse sand) about 4 cm. x 4 cm. round or square section and of thickness
equal to as specified in the drawing shall be placed between the bar and shuttering to maintain the
requisite cover in the concrete member. In case of cantilevered or doubly reinforced beams/slabs, the
top main reinforcing bars shall be held in position by introducing chair of appropriate bar spacers or
supports bar at 1.0 to 1.2 m. centers. In case of columns and walls, the vertical bars shall be kept at the
top of the mould in position by means of timber/steel templates with slots accurately cutout in them.
The templates shall be removed after concreting has been done below it. The bars may also be suitably
tied by means of annealed GI wires to the shuttering to maintain their position during concreting. The
GI wire shall be tied in such a way that they shall not get embedded in the concrete. The bars shall be
tied with GI binding wires as per the instructions given by Engineer-in-charge.
The temperature of the concrete at the place and time of delivery shall not less than 5-degree Celsius
above the prevailing shade temperature is less than 2.5 degree Celsius and the thermometer reading is
Concrete Manufactured and Supplied On the Basis of Specified Strength:
The contractor shall supply the following information for guidance of the manufacturer:
The type of cement to be used MSA Type of admixture to be used, if specified Min. acceptable strength
Slump of concrete or compacting factor Ages at which the test cubes or beams are to be tested, and
the frequency and number of test to be made Any other requirement
Unless otherwise agreed to between the architect and the contractor, the concrete shall be deemed to
comply with the requirements of this standard, if the results of tests where applicable lie within the
tolerance specified below:
Consistency of workability:
The slump average of two tests) shall not differ from the specified value by + 10mm for a specified
slump. The compacting factor average of two tests shall be within + 0.03 of the value specified. If any
other method of determining consistency to be used, a suitable tolerance shall be agreed to between
the purchaser and the manufacturer. The test for consistency or workability shall be completed within
15 minutes of the time of receipt of the ready mix concrete at the site. Aggregate- When tested in
accordance with IS 2386 (part-I)-1963, the quantity of aggregate larger than the max. size specified by
the purchaser shall not exceed 5% of the qty. of course aggregate and all such excess shall pass through
sieve of next higher size. Sampling and Testing to be followed as per specification mentioned in Item
no. 19 sub clause
Records and Certificates:
The contractor shall keep from the manufacturer batch records of the quantities by mass of all the
solid materials, of the total amount of water used in mixing and of the results of all tests. If required by
solid materials, of the total amount of water used in mixing and of the results of all tests. If required by
the Engineer-in-charge, the contractor shall furnish certificates, at agreed intervals, giving this
Mode of Measurements and Payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The volume
occupied by reinforcement shall not be deducted from RCC work. The rate shall be for a unit of one
m3.The rate includes placing the concrete at heights as given in Bill of Quantities (all heights), levels
and shapes. The rate does not include the cost of reinforcement but incl. cost of form work. No extra
payment will be made towards Shoring, strutting, Dewatering if require
Providing and laying in position Ready Mixed Concrete M-30 Grade controlled concrete Reinforced
Cement Concrete work For Plinth Beam at various Level as shown in the drawing , using cement
content as per approved design mix manufactured in fully automatic batching plant and transported
to site of work in transit mixer having continuous agitated mixer manufactured as per mix design of
specified grade for reinforced cement concrete work and Crystalizing admixture for waterproof
concrete made from hydrophilic components added to a concrete mix, reduce the permeability of
hardened concrete as approved by the Engineer in charge including pumping of RMC from transit
mixer to site of laying, excl. the cost of reinforcement but including the cost of centring, shuttering,
using regular shuttering plates, plywood, Steel Adjustable Props, Cup lock system, planks, props,
spans, runners approved by Structural designer, vibrating, fair finishing and cost of admixtures in
recommended proportion as per IS 9103 to accelerate / retard setting of concrete, improve
workability without impairing strength and durability as per direction of Engineer In charge. Rates
are hacking the surface for plastering / masonary. Minimum Cement Content 475 kg. Without Fly
Relevant Specification of Item No: 06 & 07 should be followed. This concreting should be done in Plinth
beam or plinth area work. No extra payment will be made towards Shoring, strutting, Dewatering if
require for the Plinth Beam work and except the Concrete Grade & Level. Concrete Grade should be M-
30 for the Plinth Beam Work for Plinth level at various levels as per BOQ Provision. The minimum
cement content for the various mixes shall be 475 Kg/cum or as per Mix Design whichever is higher and
the details regarding proportioning and works control shall be in accordance with IS: 456:2000 The
proportion given for a particular grade shall not, however, be placed in higher grade on the ground that
the test strength are higher than minimum specified.
Mode of Measurements and Payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The volume
occupied by reinforcement shall not be deducted from RCC work. The rate shall be for a unit of one
m3. The rate includes placing the concrete at heights as given in Bill of Quantities (all heights), levels
and shapes. The rate does not include the cost of reinforcement but incl. cost of form work. No extra
payment will be made towards Shoring, strutting, Dewatering if require
Providing and laying in position Ready Mixed Concrete M-30 Grade Control concrete Reinforced
Exposed Cement Concrete work For Beams, various levels as shown in the drawing , using cement
content as per approved design mix manufactured in fully automatic batching plant and transported
to site of work in transit mixer having continuous agitated mixer manufactured as per mix design of
specified grade for reinforced cement concrete work and Crystalizing admixture for waterproof
concrete made from hydrophilic components added to a concrete mix, reduce the permeability of
hardened concrete as approved by the Engineer in charge including pumping of RMC from transit
mixer to site of laying, excl. cost of reinforcement but including the cost of centring, shuttering using
plywood shuttering plates, , Steel Adjustable Props, Cup lock system, planks, props, spans, runners
approved by Structural designer, vibrating, fair finishing and cost of admixtures in recommended
proportion as per IS 9103 to accelerate / retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer In charge. Minimum Cement Content
457 kg. Without Fly ash RCC Floor Beam for First Floor
Relevant Specification of Item No: 06 & 07 should be followed but for the Beam work and except the
Concrete Grade & Level. Concrete Grade should be M-30 for the Beam Work above Plinth level at
various levels as per BOQ Provision. The minimum cement content for the various mixes shall be
Kg/cum or as per Mix Design whichever is higher and the details regarding proportioning and works
control shall be in accordance with IS: 456:2000 The proportion given for a particular grade shall not,
however, be placed in higher grade on the ground that the test strength are higher than minimum
Mode of Measurements and Payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The volume
occupied by reinforcement shall not be deducted from RCC work. The rate shall be for a unit of one
m3. The rate includes placing the concrete at heights as given in Bill of Quantities (all heights), levels
and shapes. The rate does not include the cost of reinforcement but incl. cost of form work.
Providing and laying in position Ready Mixed Concrete M-30 Grade Control concrete Reinforced
Exposed Cement Concrete work For Slab, Landing at various levels as shown in the drawing , using
cement content as per approved design mix manufactured in fully automatic batching plant and
transported to site of work in transit mixer having continuous agitated mixer manufactured as per
mix design of specified grade for reinforced cement concrete work and Crystalizing admixture for
waterproof concrete made from hydrophilic components added to a concrete mix, reduce the
permeability of hardened concrete as approved by the Engineer in charge including pumping of RMC
from transit mixer to site of laying, excl. cost of reinforcement but including the cost of centring,
shuttering using plywood shuttering plates, , Steel Adjustable Props, Cup lock system, planks, props,
spans, runners approved by Structural designer, vibrating, fair finishing and cost of admixtures in
recommended proportion as per IS 9103 to accelerate / retard setting of concrete, improve
workability without impairing strength and durability as per direction of Engineer In charge.
Minimum Cement Content 475 kg. With Fly ash Slabs, Landings, Shelves, Balconies and cantilever for
floor Slab, U. G. Tank, S.T.P etc. for Ground Floor.
Relevant Specification of Item No: 06 & 07 should be followed but for the Slab work and except the
Concrete Grade & Level. Concrete Grade should be M-30 for the Slab Work above Plinth level at various
levels as per BOQ Provision. The minimum cement content for the various mixes shall be 475 Kg/cum
or as per Mix Design whichever is higher and the details regarding proportioning and works control
shall be in accordance with IS: 456:2000 The proportion given for a particular grade shall not, however,
be placed in higher grade on the ground that the test strength are higher than minimum specified.
Mode of Measurements and Payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The volume
occupied by reinforcement shall not be deducted from RCC work. The rate shall be for a unit of one
m3. The rate includes placing the concrete at heights as given in Bill of Quantities (all heights), levels
and shapes. The rate does not include the cost of reinforcement but incl. cost of form work.
Providing TMT Bar FE 500 / 500D reinforcement for RCC work including bending, binding and placing
in position complete Foundation, Plinth and GF slab level
CPWD Technical Specification clause no 5.1.3 and 5.1.4 and 5.1.5 should be followed.
Steel for Reinforcement:
Steel reinforcement for concrete shall be round/ribbed bars shall be TMT Bar FE 500 / 500D unless
otherwise specified and equivalent conforming to IS: 1786 for mechanical properties with improved
corrosion resistance and bond strength shall be used. Only new steel shall be delivered to the site and
shall be free of mill scale, loose rust, grease oil, paint or any other deleterious materials which reduce
or destroys bond.
Nominal mass/weight:
The tolerance on mass/ weight for round and square bars shall be the percentage given in IS code of
the mass/ weight calculated on the basis that the masses of the bar/wire of nominal diameter and of
density 7.85 kg/ cm3 or 0.00785 kg/mm3
Physical Properties:
High strength deformed bars & wires shall conform to IS 1786. The physical properties for all sizes of
steel bars are mentioned below for FE -500
Sr. No Property Fe500D
1 0.2 Per cent Proof stress/ yield stress,
2 Elongation, per cent, Min. on gauge
length 5.65 A, where A is the cross-
sectional area of the test piece.
3 Tensile strength, Min 10 Per cent more than the actual
per cent proof stress/ yield stress but
not less than 565.0 N/mm2
4 Total elongation at maximum force,
percent, Min on gauge length 5.65 A
where A is the cross-sectional area of
the test piece.
5 Bend- Re bend Test This shall be done as per IS
Chemical composition of reinforcement bars shall be as per Table follows:-
Sr. No Particular Result
1 Carbon 0.25% max
2 Sulphur (S) 0.040% max
3 Phosphorus (P) 0.040% max
4 S+P 0.075 %max
Thermo Mechanically treated reinforcement bars:
(a) There is no BIS code for TMT bars. The available code BIS 1786 pertains to HSD Bars. Therefore
there should be no stipulation that TMT bars should conform to relevant BIS code.
(b) The TMT bars are being produced under valid license from either of the firms namely Tempcore,
Thermex Evcon Turbo & Turbo Quench. These firms have acquired patents and are giving licenses to
various producers to produce TMT Bars.
(c) The TMT bars shall conform to IS 1786 pertaining to Fe 500 or Fe 500 D or Fe grade of steel as
Binding Wire shall conform to M-21. The reinforcement shall be securely bound wherever bars
intersect or wherever required with 16 to18 gauge (1.63mm to 1.22 mm diameter) annealed steel wire
conforming to IS: 280-1972. Binding wire shall be free from rust, oil paint, grease, loose mill scale or
any other undesirable coating which may prevent adhesion of cement mortar.
Welding electrodes:
Electrodes used for welding of steel bars shall be ordinary mild steel grade 2 electrodes conforming to
IS: 814 and shall be the best quality and approved by the Engineer.-In-Charge. The work shall be carried
out strictly as per IS: 2751 and IS:
Welding of reinforcement bars covered in this specification shall be done in accordance with the
requirements of IS
Sampling & Testing:
Sampling shall be done in accordance with relevant IS codes. For every 40 MT (Metric Ton) of steel at
least one test shall be done. Reinforcing bars shall conform to the physical properties of IS: 1786. In
addition when tested for corrosion resistance as per the standard ASTM method such as salt spray test
(B.117.90), Potential Dynamic Polarization measurement test (G.5.78), Atmospheric Corrosion test
(G.50.76) and Sulphur-di-oxide chamber test (G.87.84) shall exhibit corrosion resistance index of
minimum 1.5. (deformed) bars should either be butt or lap welded as per recommended practice of
IS:9417. For best results basic coated electrodes containing copper and/or nickel shall be used.
Test certificates from manufacturer, mill certificates and certificates of origin shall be submitted for
each consignment. Additional tests required shall be done as recommended by the client/consultant at
the contractor’s own cost. An accredited laboratory shall carry out testing.
Selection and preparation of Test sample:
All the tests pieces shall be selected by the Engineering-Charge or his authorized representative either-
(a) From cutting of bars
(b) If he so desires, from any bar after it has been cut to the required or specified size and the test piece
taken from and any part of it.
In neither case, the test pieces shall be detached from the bar or coil except in the presence of the
Engineer-in-Charge or his authorized representative. The test pieces obtained in accordance with as
above shall be full sections of the bars as rolled and subsequently cold worked and shall be subjected to
physical tests without any further modifications. No deduction in size by machining or otherwise shall
be permissible. No test piece shall be enacted or otherwise subject to heat treatment. Any
straightening which a test piece may require shall be done cold. All tests as shown in IS code shall be
Causes of Rejection:
Any reinforcement so sampled and tested which fails to comply with the specifications shall be rejected
by the client/consultant and the whole batch shall be removed from the site immediately. The
contractor shall have no claim for bars mutilated in obtaining test samples. Every bar shall be inspected
before assembling on the work and defective, brittle or burnt bar shall be rejected. Cracked ends of
bars shall be discarded. The contractor at his own expense shall immediately remove rejected steel
from the work site.
Stacking and Storage:
Steel for reinforcement shall be stored in such a way as to prevent distorting and corrosion. Care shall
be taken to protect the reinforcement from exposure to saline atmosphere during storage, fabrication
and use. It may be achieved by treating the surface of reinforcement with cement wash or by suitable
methods. Bars of different classifications, sizes and lengths shall be stored separately to facilitate issue
in such sizes and lengths to cause minimum wastage in cutting from standard length Steel conforming
to above for reinforcement shall be clear and free from loose mill scales, dust, loose rust, coats of
paints, oil or other coating which may destroy or reduce bond. It shall be stored in such a way as to
avoid distortion and to prevent deterioration and corrosion. Prior to assembly of reinforcement on no
account any oily substance shall be used for removing the rust. Bar bending schedule shall be made by
the contractor before starting the work. The payment shall be done based on quantity worked out in
bar bending schedule. The bar bending schedule shall be prepared as per SP
Assembly of Reinforcement:
Bars shall be bent correctly and accurately to the size and shape as shown in the detailed drawing or as
directed by Engineer-in-Charge. Preferably bars of full length shall be used. Necessary cutting and
straightening is also included. Overlapping of bars, where necessary shall be done as directed by the
Engineer-in-Charge. The overlapping bars shall not touch each other and these shall be kept apart with
concrete between them by 25mm or 11/4 times the maximum size of the coarse aggregate whichever
is greater. But where this is not possible, the overlapping bars shall be bound together at intervals not
exceeding twice the dia. of such bars with two strands annealed steel wire of 0.90 mm to 1.6 mm
twisted tight. The overlaps/ splices shall be staggered as per directions of the Engineer-in-Charge. But
in no case the overlapping shall be provided in more than 50% of cross sectional area at one section.
Bonds and Hooks Forming End Anchorages:
Reinforcement shall be bent and fixed in accordance with procedure specified in IS 2502, code of
practice of bending and fixing of bars for concrete reinforcement. The details of bends and hooks are
shown below for guidance.
(a) U-Type Hook
In case of mild steel plain bars standard U type hook shall be provided by bending ends of rodinto semi
circular hooks having clear diameter equal to four times the diameter of the bar.
Note: In case of work in seismic zone, the size of hooks at the end of the rod shall be Eighth times the
diameter of bar or as given in the structural drawings.
Bend forming anchorage to a M.S. plain bar shall be bent with and internal radius equal to two times
the diameter of the bar with a minimum length beyond the bend equal to four times the diameter of
Anchoring Bars in Tension:
Deformed bars may be used without end anchorages provided, development length equipment is
satisfied. Hooks should normally be provided for plain bars in tension. Development length of bars will
be determined as per IS:
Anchoring Bars in Compression:
The anchorage length of straight bar in compression shall be equal to the ‘Development length’ of bars
in compression as specified in IS: 456. The projected length of hooks, bend and straight lengths beyond
bend, if provided for a bar in compression, shall be considered for development length.
Binders, stirrups, link etc.:
In case of binders, stirrups, links etc. the straight portion beyond the curve at the end shall be not less
than Eighth times and nominal size of bar.
Welding of Bars:
Wherever facility for electric arc welding or gas pressure welding is available, welding of bars shallbe
done in lieu of overlap. The location and type of welding shall be got approved by the Engineer-in-
Charge. Welding shall be as per IS 2751 and 9417.When permitted or specified on the drawings, joints
of reinforcement bars shall be welded with appropriate welding rod as per the instructions given by
Structural Engineer. The type of welding, size of fillet etc shall be as approved by Structural Engineer.
Welded joints shall preferably be located at points when steel will not be subject to more than 75 % of
the maximum permissible stresses and welds so staggered that any one section not more than 20 % of
the rods are welded. Suitable means shall be provided for holding bars securely in position during
welding. It shall be ensured that no voids are left in welding and when welding is done in 2 or 3 stages,
Mechanical splices:
Whenever indicated on the drawings or desired by the Architect and Engineer-in-charge, bars shall be
joined by couplings which shall have a cross section sufficient to transmit the full stresses of bars. The
ends of the bars that are joined by coupling shall be upset for sufficient length so that the effective
cross sectional the base of threads is not less than normal cross section of the bar. Threads shall be
standard threads. Steel coupling shall conform to IS: 226. Mechanical connections for splicing
reinforcement bars in congested locations shall be used only with the approval of consultant/Engineer.-
In-Charge. Patented couplers as manufactured by Usha Martin Industries Ltd. (CCL bar grips) and BBR
India Ltd. (BBR SWIF) shall be used wherever mentioned in the drawings or as per instruction of
Structural Engineer. The couplers shall be attached to the reinforcement bars by forging, hydraulic
pressing or screw couplers in special circumstances may be permitted. All operations relating to
reinforcement coupling shall be done using supplier’s patented machine / equipment and in the
presence of the supplier’s representative. The contractor shall submit relevant trade literature, mil
certificates, certificate of origin and letters of approval for each proposed application. A sample of each
type of mechanical coupler shall be submitted for testing and approval prior to the use of any coupler
Placing in Position:
Fabricated reinforcement bars shall be placed in accuratel position as shown in the drawings or as
directedby the Engineer-in-charge. The bars crossing one another shall be tied together at every
intersectionwith two strands of annealed steel wire 0.9 to 1.6 mm thickness twisted tight to make the
skeleton of thesteel work rigid so that the reinforcement does not get displaced during deposition of
concrete. Tack welding in crossing bars shall also be permitted in lieu of binding with steel wire if
approved by Engineer-in-Charge.
The bars shall be kept in correct position by the following methods:
In case of beam and slab construction pre-cast cover blocks in cement mortar 1:2 (1 cement : 2coarse
sand) about 4x4 cm section and of thickness equal to the specified cover shall be placedbetween the
bars and shuttering, so as to secure and maintain the requisite cover of concrete over reinforcements.
In case of cantilevered and doubly reinforced beams of slabs, the vertical distance between
thehorizontal bars shall be maintained by introducing chairs, spacers or support bars of steel at
meter or at shorter spacing to avoid sagging. In case of columns and walls, the vertical bars shall be
kept in position by means of timbertemplates with slots accurately cut in them: or with clock of cement
mortar 1:2 (1 cement: 2coarse sand) of required size suitable tied to the reinforcement to ensure that
they are in correct position during concreting. In case of other R.C.C. structure such as arches, domes,
shells, storage tanks etc. a combinationof cover blocks, spacers and templates shall be used as directed
by Engineer-in-Charge.
Tolerance on Placing of Reinforcement:
Unless otherwise specified by the Engineer-in-Charge, reinforcement shall be placed within the
following tolerances:
Tolerance in spacing
(a) For effective depth, 200 mm or less +10 mm
(b) For effective depth, more than 200 mm + 15 mm
Bending at Construction Joints:
Where reinforcement bars are bent aside at construction joints and afterwards bent back into their
original position care should be taken to ensure that at no time the radius of the bend are less than
bar diameters for plain mild steel or 6 bar diameter for deformed bars. Care shall also be taken when
bending back bars to ensure that the concrete around the bar is not damaged.
Cover: The minimum nominal cover to meet durability requirements shall be as under:-
Exposure Condition as per IS 456-2000 Nominal Concrete cover in mm not less than
Nominal cover to meet specified period of fire resistance shall not be less than as given in Table 16A of
Adequate no. of chairs shall be provided to prevent sagging of reinforcement during concreting.
Mode of Measurements & Payment:
Reinforcement shall be measured in length including authorized overlaps for different diameters as
actually used in the work. Where welding or coupling is resorted to in place lap joints, such joints shall
be measured for payment as equivalent length of overlap as per design requirement. From the length
so measured, the weight of reinforcement shall be calculated in tones/Kgf on the same basis of as per
M-18 and relevant IS Code. Reinforcement shall be measured in lengths of bar as actually placed in
position on standard weight basis, no allowance being made in the weight for rolling margin. Wastage
and binding wire shall not be measured. Unauthorized overlaps, chairs, splices, spacers and hooks
shall not be measured. Rate quoted shall include the cost of welding if specified. Payment shall be
made as per reinforcement drawings and with theoretical weights only. Cutting, bending, placing,
binding and fixing in position as shown on the drawings and as directed It shall also include all devices
for keeping reinforcement in approved position, cost of joining as per approved method and all
wastage and spacer bars. The rate shall be for a unit of One Kg from Foundation to all floor level.
(C) Brick Masonry, Plaster and Paint Work
General Specification
Providing and laying Brick Work using common burnt clay conventional building bricks conforming to IS
1077-1992 having compressive strength not less than 35 Kg/ cm2 in any width, any shape and all depth
including curing, scaffolding, racking / flush jointing etc. as per drawing, specification and approved by
architect and as directed by engineer-in-charge for all civil, plumbing, electrical & Infrastructure works.
a) CM 1:5 in foundation and up to plinth level.
Providing and laying Brick masonry works in foundation & Plinth using common burnt clay building
bricks confirming to IS 1077-1986 having crushing strength not less than 35kg/Sq.cm in any shape
cement mortar 1:5 (1 cement: 5 coarse sand) in any shape and all depth including curing, scaffolding
racking / flush jointing etc. complete, as directed. For all civil, plumbing, electrical & infrastructure
Water shall confirm to M-1. Cement confirm to M-3. Sand confirm to M-6. Brick confirm to M-15. And
Cement mortar confirm to M-11.
The proportion of the Cement Mortar shall be as mentioned in the item description (cement: coarse
sand), by volume.
Soaking of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about 24 hours before
use or as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of
thorough wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except
when necessary to complete the bond; closer and in such case it shall be cut to required size and used
near the ends of walls. A layer of mortar shall be spread on full width for suitable length of the lower
course. Each brick shall first be properly bedded and set home by gently tapping with the handle of the
trowel or wooden mallet. It’s inside face shall be flushed with mortar before the next brick is laid and
pressed against it. On completion of the course, the vertical joints shall be fully filled from the top, with
mortar. The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all
vertical joints shall be truly vertical. Vertical joints in alternate courses shall generally be in one vertical
plane. The thickness of brick course shall be kept uniform. The bricks shall be laid with the frog facing
upwards. A set of tools comprising of wooden straight edges, Manson’s spirit level, square half meter
rub (right angle), pins, string, level pipe and plumb shall be kept on the site of work for frequent
checking during the progress of work. Both the faces of walls, having thickness greater than 23 cm.
shall be kept in proper plumb. All the connected brick work shall be kept not more than 1 m. over the
rest of the work. Where this is not possible, the work shall be raked back according to bond (and not
left toothed) at an angle not steeper than 45O. In a day brick work shall not be laid more than 1m or
courses in height. All the fixtures, pipe outlets of water, etc. which are required to be built in the wall
shall be embedded in CM, as per the drawings or as directed. The frames of doors, windows,
cupboards, etc. shall be housed into the brick work at the correct location and level, as directed. The
heavy steel doors, windows frames, etc. shall be built in with brick work, but for ordinary steel doors
and windows, required opening for frames, hold-fasts, etc. shall be left in the wall and frames shall be
embedded later on in order to avoid damage to the frames. Necessary scaffolding shall be provided by
the Contractor. The supports of the scaffolding shall be sound and strong, tied together with horizontal
pieces over which the scaffolding planks shall be fixed. Normally simple scaffolding only shall be
allowed. In this case horizontal pieces of the scaffolding shall rest in the holes, made in the header
course only. The Contractor is responsible for providing and maintaining sufficiently strong scaffolding
so as to withstand all loads likely to come upon it. No through holes shall be left in brickwork to support
the scaffolding. Only double scaffolding shall be erected. In case the holes are left in the brickwork, it
shall be filled with 1:4:8 PCC.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joints shall not exceed
mm. The face joints shall be raked out as directed by raking tools daily, during the progress of work,
when the mortar is still green so as to provide key for plaster or pointing to be done, subsequently. The
face of bricks shall be cleaned every day on which the brick work is laid and all mortar dropping shall be
removed. At the end of day's work or on holidays the top of unfinished masonry shall be kept wet. If
the mortar becomes dry, white or powdery, for want of curing, work shall be pulled down and re-built
at Contractor's expense.
Fresh work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for
minimum period of 7 days. The top of masonry work shall be kept well wetted at the end of the day's
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be levelled, cleared off of all
loose materials, cleaned and wetted before starting masonry work. If masonry is to be laid on concrete
footing, the top of concrete shall be roughened, cleaned and moistened. The Contractor shall obtain
approval of the Engineer-in-charge for the foundation bed, before foundation masonry is started.
When pucca flooring is to be provided flush with the top of the plinth, the inside of the plinth wall shall
be lowered down having an offset of the same thickness of the flooring with respect to the outside
plinth wall top or as directed.
Mode of Measurements and Payment:
The measurement of this item shall be taken for the brick masonry fully completed in foundation up to
plinth for all levels, heights, shapes and locations as per the item description.. The limiting dimensions
not exceeding those shown on the drawings or as directed shall be final. Battered, tapered and curved
portions shall be measured net. No deduction shall be made from the quantity of brick work, nor shall
any extra payment be made for embedding in masonry or making holes in respect of following items:
End of joists beams, posts, girders, rafters, purlins, trusses, corbel, steps etc. where cross sectional area
does not exceed 500 cm2. Architectural openings in walls, parapet and compound walls, not exceeding
1.0 m2. Area. Wall plates and bed plates, bearing of slabs, chhajjas and the like whose thickness does
not exceed 10 cm. and the bearing does not extend to the full thickness of wall. Drainage holes,
recesses for cement concrete blocks to embed hold fasts for doors, windows etc., forming toothings,
grooves etc. and providing cramps for holding stone lining. Iron fixtures, pipes up to 300 mm. dia.;
holdfasts and doors and windows built into masonry and sanitary and water supply pipes, etc., for
concealed electrical wiring and any other fixtures or inserts. Forming chases of section not exceeding
350 cm2. in masonry. Apertures for fire places shall not be deducted nor shall extra labour required to
make splaying of jambs, throating and making arches over the aperture be paid for separately. The rate
shall include for work of any shape e.g. pillars of any size and shape, curved or tapered walls, drip
courses, projections, parapets, load bearing walls, sills, ottas, steps, tank walls, platforms and counter
walls, ducts, channels and architectural mouldings like corbelling, pattas, etc. Work above Plinth level
at various levels as per BOQ Provision.The rate shall be for a unit of one m3.
Brickwork using common burnt clay building bricks having crushing strength not less than
Kg./Sq.Cm. in foundation and plinth in cement Mortar 1:6 (1-Cement : 6-finesand) (B) Conventional
For Ground floor
The relevant specification of above General Specification shall be followed
Providing and laying Brick masonry works in Ground Floor using common burnt clay building bricks
confirming to IS 1077-1986 having crushing strength not less than 35kg/Sq.cm in any shape cement
mortar 1:6 (1 cement: 6 coarse sand) in any shape and all depth including curing, scaffolding racking /
flush jointing etc. complete, as directed. For all civil, plumbing, electrical & infrastructure works.
Mode of Measurements and Payment:
The rate shall be for a unit of one m3.
Half brick masonry in common burnt clay building bricks having crushing strength not less than
Kg/Sq. Cm. in Cement mortar 1:4 (1- Cement: 4 -coarse sand) (B) Conventional Ground floor
Half brick masonry in common burnt clay building Conventional bricks having crushing strength not less
than 35 Kg/Sq. M. in Cement mortar 1:4 (1-Cement :4-coarse sand) in Ground Floor at any level Bricks
shall conform to M-15. Water to M-1. Cement to M-3. Sand to M-6. Cement mortar toM11.
Relevant specifications of above General Specification of brick wall, wetting and laying of brick, joints,
curing, etc. shall conform to item no. 4.01 except that the brick work of half bricks, 115 mm. thick shall
be carried out, at all heights, levels, location, shapes etc. The thickness and the C.M shall be same as
mentioned in the item description. All bricks shall be laid stretcher wise, breaking joints with those in
the upper and lower courses. The wall shall be taken truly plumb. All courses shall be laid truly
horizontal and all vertical joints shall be truly vertical. The bricks shall be laid with frogs upwards. A set
of mason's tools shall be maintained on work site as required for frequent checking.
Mode of Measurements and Payment:
The half brick masonry work for all heights, levels, locations and shapes shall be measured under this
item. The limiting dimensions shall not exceed those shown in the plan or as directed. Any work done
extra over the specified dimensions shall not be measured and paid for. The rate shall include the
reinforcement if it is given in the item description. Work above Plinth level at various levels as per BOQ
provision. The rate shall be for a unit of m2.
Providing 15mm thick Cement Plaster in single coat on AAC Blocks/brick/concrete wall for interior
plastering at various floor level as below, finished even and smooth in Cement mortar 1:4 (1-cement:
4-sand) Ground floor
Water shall confirm M-1, Cement shall conform to M-3. Sand shall conform to M-6, Cement mortar in
proportion 1:4 (1-cement: 4 coarse sand) shall conform to M-11 of attached Specification of Material.
Scaffolding: Scaffolding should be sound. These shall be properly examined before erection and use.
Stage scaffolding shall be provided which shall be independent to the walls.
Preparation of Back-ground:
The surface shall be cleaned of all dust, loose mortar dropping, traces of Algae, efflorescence and other
foreign matter by water or by brushing. Smooth surface should be roughened by wire brush, racking of
joints, hacking on concrete structure, trimming of projection on brick / concrete block / concrete
surface where necessary shall be carried out to get an even surface. Surface should be damped (not
soaked) evenly before applying the plaster. If the surface becomes dry such area shall be moisturized
Application of Plaster:
1 - The plaster about 15cm x 15 cm shall be applied horizontally and vertically not more than 2 Meters
intervals over the entire surface to serve as gauge. The surface of these shall be truly in plane of the
finished plastered surface. The mortar shall then apply in uniform surface slightly more than the
specified thickness. Then brought to a true surface by working a wooden / aluminium straight edge
reaching across the gauges with small upward and sideways movement at a item. Finally the surface
shall be finished off true with trowel or wooden float accordingly as a smooth or a sandy granular
texture is required. Excessive troweling or overworking the float shall be avoided. All corners arise,
angles and junctions be truly vertical or horizontal as the case may be and shall be carefully finished.
Rounding or chamfering corners arises junction etc. shall be carried out with proper templets to the
2 – Cement Plaster shall be used within half an hour after addition of water. Any mortar or plaster
which is partially set shall be rejected and removed forthwith from the site.
3 – In suspending the work at the end of the day, plaster shall be scraped clean to the line both
Horizontally and Vertically. When recommending the plaster, the edges of the old work shall be
scrapped clean and wetted with cement putty before plaster is applied to the adjacent area to enable
the two to properly join together. Plastering work shall be closed at the end of the day on the body of
the wall and nearest than 15 cm. to any corner arises. Horizontal joints in plaster work shall not also
occur on parapet tops and coping as these invariably lead to leakage. No portion of the surface shall be
left out initially to be packed up later on.
The curing shall be started overnight after finishing of plaster. The plaster shall be kept wet for a period
of 7 days. During this period it shall be protected from all damages.
Plastering work shall be carried out as per C-31 of attached code of practice & IS: 1661-1972.
For scaffolding, relevant specification of C-9 of attached code of practice shall be followed
Mode of Measurement & Payment:
The Rate shall include the cost of material, labour, scaffolding curing etc. involved in the operations
described under workmanship. Thickness of plaster shall be exclusive of the thickness of the key i. e.
grooves or open joints in brick work. Thickness of plaster shall be average thickness with minimum
15mm or otherwise specified at any point on the surface. The measurements of plastering on wall shall
be taken between for length and from the top of floor or skirting for height. Mode of measurements
and deductions for payment shall be carried out as mention as per General Technical Specification for
Building Works.
Work for Ground Floor (Lower Ground Floor + Upper Ground Floor) levels as per BOQ Provision. The
measurement shall be taken on the Sq. Meter basis as per I.S. 1200-XII- 1976 or as revised from time to
time so far as applicable. The contract rate shall be for a unit of one Sq. Meter of plastering of specified
20mm thick sand faced cement plaster on walls up to height 10 metres above ground level consisting
of 12mm thick backing coat of C.M. 1:3 (1-cement: 3-sand) and 8mm thick finishing coat of C.M. 1:1
(1-cement : 1-sand) etc. complete.
Cement shall conform to M-3, Sand shall conform to M-6, Water shall conform to M-1, Cement mortar
shall conform to M-11 of attached Specification of Materials.
The work shall be carried out in the two coats. The backing coat (base coat) shall be 12 mm. thick in
C.M. 1:3. The relevant specification of item shall be followed except that the thickness of back coat
shall be 12 mm. averages. Before the first coat hardens its surface shall be beaten up by edges of
wooden tapers and close shall be made on the surface. The subsequent coat shall be applied after this
coat has been allowed to set for 3 to 5 days depending upon the weather conditions. The surface shall
not be allowed to dry during this period. The second coat shall be completed to 8 mm. thickness in C.M.
1:1 as described above, including raising sand facing by bushing. The sample of sand face shall be got
approved before the work is started. The whole work shall be carried out uniformly as per sample
Each coat shall be kept damp continuously till the next coat is applied or for a minimum period of
days Moistering shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be
avoided and only as much water as can be readily absorbed shall be used, excessive evaporation on the
sunny or windward side of building in hot air or dry weather shall be prevented by handing mattings or
gunny bags on the outside of plaster and keeping them wet. The curing shall be started overnight after
finishing of plaster. The plaster shall be kept wet for a period of 7 days. During this period it shall be
protected from all damages.
Mode of measurements & payment:
The Rate shall include the cost of material, labour, scaffolding curing etc. involved in the operations
described under workmanship. Thickness of plaster shall be exclusive of the thickness of the key i. e.
grooves or open joints in brick work. Thickness of plaster at any point on the surface shall be average
thickness specified in BOQ. The measurements of plastering on wall shall be taken between for length
and from the top of floor or skirting for height. Mode of measurements and deductions for payment
shall be carried out as mention as per General Technical Specification for Building Works. The contract
rate shall be for a unit of one Sq. Meter of plastering of specified 20mm thick gutka finished sand faced
Wall painting (two coats) with plastic emulsion paint of approved brand and manufacture on
undecorated wall surface to give an even shade including thoroughly brushing the surface free from
mortar droppings and other foreign matter and sand papered smooth. (work for all floors)
Water shall be confirm M-1. The plastic emulsion shall conform to I.S.: 5411-1969 (part-l).
1. Preparation of white wash solution Surface already white or colour. The fat lime shall be slaked
as site and shall be mixed and stirred with about five liters of water for 1 kg. of unslaked lime to
made a trim cream This shall be allowed to stand for d period of 24 hours and then shall be
screened through a clean coarse cloth, 4 Kg. of gum dissolves in hot water shall be added to
each cubic meter of lime cream Small quantity of ultramarine blue (Up to 3 gins, per kg. of
lime) shall also-be added to the last two coats of white wash solution and the whole solution
shall be stirred thoroughly before use.
Wherever scaffolding is necessary it shall be erected in such a way that as far as possible on part of
scaffolding shall rest against the surface to be white or colour washed A properly secured strong and
well tied suspended platform (Zoola) may be used for white washing. Where ladders are used pieces of
old gunny bags shall be tied at top and bottom to prevent scratches to the floors and walls. For white
washing of ceilings, proper stage scaffolding shall be erected where necessary.
Preparation of surface:
1. The undecorated surface to be distempered shall be thoroughly brushed from dust, dirt,
grease, mortar dropping and other foreign matter and sand papered smooth. New plaster
surface shall be allowed to dry for at least 2 months before applications of distemper.
2. All unnecessary nails shall be removed. Pitting in plaster shall be made good with plaster again
with a fine grade sand paper and made smooth. A coat of distemper shall be applied over the
patches. The surface shall be allowed to dry thoroughly before the regular coat of distemper is
allowed. The surface affected by moulds, moss, fungi, algae lichens, efflorescence etc. shall be
treated in accordance with I.S; 2395 (Part 01) 1966. Before applying distempering, any
unevenness shall be made good by applying putty made of plaster of pairs mixed with water on
entire surface including filling up the undulation and then sand papering the same after it is
Preparation of Mix
This shall be done as per manufacture's instructions. The thinning of emulsion is to be done with water
and not with turpentine. The quantity of thinner to be added shall be as per manufacturer instructions
1. Before pouring into small containers for use, the paint shall be stirred thoroughly in item
container. When applying also, the paint shall be continuously stirred in the smaller container,
so that its consistency is kept uniform.
2. The paint shall be laid on evenly and smoothly by means of crossing and laying off the crossing
and consist of covering the area over with paint, brushing the surface hard for the first time
over and then, brushing alternately in opposite direction two or three times and then finally
brushing lightly in direction at right angles to the same. In this process, no brush Marks shall be
left after the laying off is finished. No hair marks from the brush or clogging of paint puddles in
the corners of panels, angles of moldings, etc. shall be left on the work. The full process of
crossing and laying off will constitute one coat.
3. The paint shall be applied with brush or rollers. For undecorated surfaces, the surface shall be
treated with minimum two coats of cement water proofing paint. The second or subsequent
coat shall not 135 be started until the proceeding coat as become sufficiently hard to resist
marking by brushing being used
4. The surface on finishing shall present a flat velvety smooth finish. It shall be even and uniform
in shade without patches, brush marks, paint drops etc.
1. Old brushes if they are to be used with emulsion paints, shall be completely dried of turpentine
or oil paint by washing in warm soap water. Brushes shall be quickly washed in water
immediately after use and kept immersed in water fusing break periods to prevent the paint
from hardening on the brush.
2. In the preparation of wall for plastic emulsion painting, no oil base petals shall be sued in filling
cracks, holes etc
3. Splashes on floors etc. shall be cleaned out without delay as they will be difficult to remove
after hardening
4. Washing or surfaces treated with emulsion paint shall not be done within 3 to 4 weeks of
Mode of measurements and payment
All the work shall be measured in the decimal system as under:
1. Dimensions shall be measured to the nearest 0.01 m.
2. Area in individual item shall be worked out to the nearest 0.01 sq.m.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, sills etc. for openings not
exceeding 0.5 sq. mt. each in area, for ends of joists, posts, beams, girders, steps etc. not exceeding
0.5 sq mt. each in area and for openings exceeding 0.5 sq. mt. and not exceeding 3.0. sq. mt. each
in area, deductions and additions shall be made as under.
3. No deductions shall be made for ends of joists, beams, posts, etc. and openings not exceeding
0.5 sq mt. each. No addition shall be made for reveals, jambs, soffits, sills etc. of these openings
not for finish around ends of joints, beams, posts etc
4. No deductions for openings exceeding 0.5 sq.mt. but not exceeding 3 sq. mt. each shall be
made as follows and no addition will be made for reveals, jambs, soffits etc. of these openings:
a. When both the faces of walls are provided with finish, deduction shall be made for one face
b. When each face of wall is provided with different finish, deduction shall be made for that side
of frame for door, windows, etc. on which width of reveals is less than that of the other side.
Where width of reveals on both faces of wall are equal, deduction of .50% of area of opening
on each face shall be made from total area of finish.
c. When only one face of wall is treated and the other face is not treated, full deduction shall be
made if the width of reveal on the treated side is less than that on the untreated side, but if the
width of the reveal is equal or more than on the untreated side neither deductions nor
additions to be made for reveals, jambs, soffits, sills etc.
5. In case of area of openings exceeding 3 sq. mt. each, deductions shall be made for openings but
jambs, soffits, sills shall be measured.
6. No deductions shall be made for attachment such as casing, conducts, pipe, electric wiring and
7. Corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured
shall be increased by the following percentage and the resultant shall be included with the
a. Corrugated steel sheets……………………………………… 14%
b. Corrugated A.C. sheets………………………………………. 20%
c. Semi corrugated A.C. Sheets……………………………….. 10%
d. Nainital pattern roof (Plain sheeting sheets)……………….. 10%
e. Naintial pattern roof (with corrugated sheets)……………… 25%
8. Cornices and other wall features, when they are not picked out in a different finish/colour shall
be girthed and included in the general area
9. The rate shall include the cost of ail materials, labour, scaffolding, protective measures etc.
involved in all
10. the operations described above.
11. The rate shall be for a unit of One sq. meter.
Applying two coats of Birla or Asian acrylic lapy ( putty) & two coats of primer of approved brand
and manufacture on new wall surface to give an even shade including thoroughly brushing the
surface foreign matter and sand papered smooth.(work for all floors)
1. Clear-Cole : This shall be made from glue and boiling water by mixing 1 kg. of glue to every
liters of water. The mixing shall be suitably tinted to match with colour of colour washing as
directed. Glue shall conform to l.S. 852-1969.
2. Lime : Lime used shall be freshly burnt class 'C' lime (Fat lime) and white in colour conforming
1. Sufficient quantity of colour wash enough for the complete job shall be prepared in one
operation to avoid any difference in shade. The basic white wash solution shall be prepared in
accordance with item 18.11 Mineral colours not affected by lime shall be added to the white
wash solution. No colour wash shall be done until a sample of the colour has been approved. It
shall be rioted that small samples of colour appeals lighter in shade than when the same
shades are applied precisely to large surface. The colour shall 126 be of event, tint, over the
colour shall be of event tint, over the whole surface. If it is patchy or otherwise badly applied, it
shall be rejected. Preparation of the colour wash with pigment shall be as under:
a) With Yellow and Red Ocher : Solid lumps if nay in the powder shall be crushed to powder and
solution in water prepared and then added to white wash sieving it through a coarse cloth,
mixed evenly and thoroughly to white wash in-small quantities till required shade is obtained.
b) With Blue Vitriol : Fresh crystals of hydrous copper sulfate (i.e. vitriol) shall be ground to fine
power and dissolved in small quantity of water. Sufficient quantity of solution enough to
produce the colour wash of required shade shall be strained through a clean cloth, the filtrate
being mixed evenly and thoroughly to the white wash.
c) Colour wash from other colouring pigment shall be prepared in accordance with the
instructions of the manufacturer.
Preparation of Surface
1. The surface shall be prepared by removing mortar dropping and foreign matter and thoroughly
cleaned with wire of fiber brush or any other suitable means as directed by the Engineer-in-
charge. All loose pieces and scales shall be scrapped off and holes filled with mortar. For
scaffoldings and application of colour wash, relevant specification of item No. 18.11. above
shall be followed. The colour wash shall be applied as under: The colour wash shall be applied
in accordance with the procedure given in item No. 18.11. "Application of white wash for
colour washing on undercoated surface after the surface has been prepared. The first primary
coat shall be of white wash and subsequent coats (minimum two) shall be colour wash and the
entire surface shall represent a smooth and uniform finish. To star with, patch of 0.1 sq. mt. on
prepared surface shall be colour washed with first coat of white wash and subsequent coats of
colour wash solution entire work of cofour washing is taken up in hand, ft shall be noted that
small areas of colour wash will appear lighter than when the same shade is applied to the large
2. For colour washing on decorated surfaces, after (he surface has been prepared, a coat of white
wash-shall be applied for the patches and repairs. Then one coat or more of colour wash shall
be applied over the entire surface, such that the colour washed surface shall present a uniform
colour shade. No primary coat is needed for a decorated surface bearing colour of same shade
on surface required change of colour after the surface has been prepared as described above.
Two coats of white wash shall be applied before application of specified number (minimum
TWO) of coats of colour wash of the new shade.
Protective Measure
Same as Item No.
Mode of Measurement
Same as Item No.
The rate shall be for a unit of One sq. meter.
Providing Throating of Plaster Drip and Moulding to R.C.C Chajja or Cantilever Slab as directed by
Engineer in charge for all floors, height and level
Water shall conform to M-1. Cement shall conform to M-3.Sand shall conform to M-6. Cement mortar
shall conform to M-11 of attached Specification of Materials.
The work shall be carried out as directed for all levels and any height. The proportion of the mix for
finishing and touching shall be in CM 1:3, by volume. Curing shall be done for not less than 7 days. The
work shall be carried out in best workman- like manner. The throating or plaster drip and moulding
shall be in thickness. The work shall be carried out in the coats. The backing coat (base coat) shall be
mm. thick in C.M. 1:3. The relevant specification of item shall be followed except that the thickness of
back coat shall be 12 mm. average. Before the first coat hardens its surface shall be beaten up by edges
of wooden tapers and close shall be made on the surface. The subsequent coat shall be applied after
this coat has been allowed to set for 3 to 5 days depending upon the weather conditions. The surface
shall not be allowed to dry during this period. The second coat shall be completed to 8 mm. thickness in
C.M. 1:1 as described above, including raising sand facing by bushing. The sample of sand face shall be
got approved before the work is started. The whole work shall be carried out uniformly as per sample
Each coat shall be kept damp continuously till the next coat is applied or for a minimum period of
days Moistering shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be
avoided and only as much water as can be readily absorbed shall be used, excessive evaporation on the
sunny or windward side of building in hot air or dry weather shall be prevented by handing mattings or
gunny bags on the outside of plaster and keeping them wet. The curing shall be started overnight after
finishing of plaster. The plaster shall be kept wet for a period of 7 days. During this period it shall be
protected from all damages.
Mode of Measurements and Payment:
The work shall be measured in rmt. of the actual work done or indicated in drawings, whichever is less.
The rate shall be for unit of one running meter.
Providing cement vata (10 cm x 10 cm size) quarter round in cement mortar 1:1 including neat
cement finishing watering etc. complete. For all floors, height and level
Water shall conform to M-1. Cement shall conform to M-3.Sand shall conform to M-6. Cement mortar
shall conform to M-11 of attached Specification of Materials.
The work shall be carried out as directed or all levels and any height. The proportion of the mix for
finishing and touching shall be in CM 1:1, by volume. The work shall be carried out in best workman-
ship. Before the Vata work, proper key in the concrete surface should be provided. The
depressed/sunken portion should be hacked by a hacking tool, after the concrete slab is cast. The
treatment shall be carried out along the vertical surface of the parapet and joining wall up to height of
about 100mm in a shape of quarter round vata and finishing the adjoin surface
The curing shall be started overnight after finishing of plaster. The plaster shall be kept wet for a period
of 7 days. During this period it shall be protected from all damages.
Mode of Measurements and Payment:
The work shall be measured in rmt. of the actual work done or indicated in drawings, whichever is less.
The rate shall be for unit of one running meter.
(D) Flooring and Water Proofing Work
Providing & laying 18mm thick mirror finished granite of approved size, light shade (lighter shade like
desert yellow, adhunik grey, morkarsar green, etc) and quality, selected and sorted for uniform color
in floor and other areas as required sizes and shapes given in design. Average 20 mm thick 1:6
cement mortar bedding for flooring with grey cement slurry for joints. The rate includes rounding,
champhering, rubbing and mirror polishing of edges. The work shall be carried out after approval of
architect and engineer-in-charge.
Providing & laying 1st quality 18mm thick mirror finished granite of approved size, (telephone Black,
lighter shade like desert yellow, adhunik grey, morkarsar green, etc) and quality, selected and sorted
for uniform color in floor and other areas as required sizes and shapes given in design. Average 20 mm
thick 1:6 cement mortar bedding for flooring with grey cement slurry for joints. The rate includes
roughened strip 4.0 cm wide to form antiskid surface on floors & steps rubbing and mirror polishing of
edges. The work shall be carried out after approval of architect and engineer-in-charge. (Work for all
1 –18mm thick mirror finished granite of approved size telephone Black, light shade (lighter shade like
desert yellow, adhunik grey, morkarsar green, etc. shall confirm to M-52
2 – Cement Mortar shall confirm to M-11 as per attached Specification of Materials
3 – Water shall confirm M-1 as per attached Specification of Materials
Marble Stone slabs for flooring, dado, veneering etc. shall be of the kind specified in the item such as
Kesariaji Green & River Wash (shall be obtained as specified in items) Kota Stone (M-49), etc. Marble
from which the slabs are made shall be of selected quality, hard sound, dense and homogeneous in
texture free from cracks, decay, weathering and flaws. Before starting the work the Contractor shall get
the sample of marble slabs approved by the Architect. The slabs shall be machine cut and machine
polished.The slab shall conform to IS; 1237 having the color approved by the Architect and the rate
shall include provision of border slab and slab of different colors in pattern as directed, Bedding for the
Kota stone and Kesariyaji Green shall be cement Mortar 1:6 (mortar mix specified) of Av. Thickness
20mm as given in the description of the item. Sub grade shall be cleaned, wetted and mopped. The slab
shall be washed clean before laying. It shall be top pressed, tapped gently to bring it in level with other
slab spread on an area sufficient to receive one kota stone slab. It shall then be lifted and laid aside.
Top surface of the mortar shall then be corrected by adding fresh mortar at hollow depressions. Over
this surface, cement slurry of honey like consistency shall be applied. It
shall be gently placed in position and tapped with wooden mallet till it is properly padded in level with
and close to the adjoining slab. The joint shall be as fine as possible. The slab fixed in the floor adjoining
the wall shall enter not less than 10mm under the plaster, skirting or dado. The junction between the
wall floor shall be finished neatly. The finished surface shall be true to levels and slopes as directed.
After slab have been laid in a room or a day's fixing work is completed, surplus cement grout that may
have come out of the joints may be wiped off gently and joints cleaned. Thin slurry of colored cement
matching to the color of slab shall be spread over it and rubbed so as to seal even a thinnest joint
between the slab and make it impervious and the flooring cured for 7 days. The flooring shall be
polished and finished according to IS:
Mode of Measurement & Payment:
Bedding for the 18mm thick mirror finished granite stone shall be cement Mortar 1:6 (mortar mix
specified) of Av. Thickness 20mm as given in the description of the item. Sub grade shall be cleaned,
wetted and mopped. The slab shall be washed clean before laying. It shall be top pressed, tapped
gently to bring it in level with other slab spread on an area sufficient to receive one 18mm thick mirror
finished granite slab. It shall then be lifted and laid aside. Top surface of the mortar shall then be
corrected by adding fresh mortar at hollow depressions. Over this surface, cement slurry of honey like
consistency shall be applied. The stone shall be gently placed in position and tapped with wooden
mallet till it is properly padded in level with and close to the adjoining slab. The joint shall be as fine as
possible. The slab fixed in the floor adjoining the wall shall enter not less than 10mm under the plaster,
skirting or dado. The junction between the wall floors shall be finished neatly. The finished surface shall
be true to levels and slopes as directed. The floor shall be kept wet for a minimum period of 7 days..
Curing, daily moping with water & kerosene as directed for at least 15 days after final polishing etc.
complete up to the satisfaction of the Architect or Engineer-in-charge.
Work includes cost of material and labour with polishing complete. Measurement shall be taken
between finished face of skirting, dado or wall plaster - visible top Granite stone only in length and
width. Mode of Payment will be on smt. basis of finished work. No deduction shall be made for any
opening in the floor of area 0.10 sq. mt. Rate shall be paid for a unit of 1 sq. meter basis.
Providing and laying polished Kota stone slab flooring over 20mm (Average) thick base of cement
mortar 1:6 (1-cement : 6-coarse sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid over and
jointed with grey cement slurry mixed with pigment to match the shade of slab including rubbing and
polishing etc. complete. (A) 25mm thick (work for all floors)
Providing and laying average 25 mm thick 550mm x 550mm hand dressed green polished kotah stone
of approved quality, selected and sorted for uniform colour in floor, otta, platform, etc. of required
sizes up to 550 mm as per design in normal pattern (straight or staggered joint with square or
rectangular shaped stone) and residue as per drawing including 1:6 (1 cement : 6 sand) cement mortar
bedding of average 20 mm thickness jointed with grey cement and colour pigment in proportion to
match the shade of kota stone. Rubbing and polishing to be done with 2 coats of 60, 120 grades of
emery, balckhapadi and gutka for special polish after it polishing to be done with 220, 320, 400,
grades of emery till mirror/ semi mirror finish is achieved. Curing, daily moping with water & kerosene
as directed for at least 15 days after final polishing etc. complete up to the satisfaction of the Architect
or Engineer-in-charge. (NO WAXING WILL BE PERMITTED). (work for all floors)
1 –600 mm x 600mm size and 25mm thick Kota Stone shall confirm to M-49
2 – Cement Mortar shall confirm to M-11 as per attached Specification of Materials
3 – Water shall confirm M-1 as per attached Specification of Materials
For dressing, each slab shall be cut to the required size and shape and fine chisel dressed at all edges.
The sides thus dressed shall a have a full contact if a straight edge is laid along. The side shall be table
rubbed with coarse sand before paving. All angles and edges of the slab shall be True Square and free
from chipping. The thickness shall be 25mm (Av.) as specified in the item.
Bedding for the Kota stone shall be cement Mortar 1:6 (mortar mix specified) of Av. Thickness 20mm as
given in the description of the item. Sub grade shall be cleaned, wetted and mopped. The slab shall be
washed clean before laying. It shall be top pressed, tapped gently to bring it in level with other slab
spread on an area sufficient to receive one kota stone slab. It shall then be lifted and laid aside. Top
surface of the mortar shall then be corrected by adding fresh mortar at hollow depressions. Over this
surface, cement slurry of honey like consistency shall be applied. The shall be gently placed in position
and tapped with wooden mallet till it is properly padded in level with and close to the adjoining slab.
The joint shall be as fine as possible. The slab fixed in the floor adjoining the wall shall enter not less
than 10mm under the plaster, skirting or dado. The junction between the wall floors shall be finished
neatly. The finished surface shall be true to levels and slopes as directed. The floor shall be kept wet for
a minimum period of 7 days. Polishing shall be normally commenced after 14 days of laying the stone
slab. Rubbing and polishing to be done with 2 coats of 60, 120 grades of emery, balckchapadi and gutka
for special polish after it polishing to be done with 220, 320, 400, 600 grades of emery till mirror/ semi
mirror finish is achieved. Curing, daily moping with water & kerosene as directed for at least 15 days
after final polishing etc. complete up to the satisfaction of the Architect or Engineer-in-charge. (NO
WAXING WILL BE PERMITTED). Water shall be properly used during polishing up to mirror finish. The
holes required for N. T. Pipes or any other fittings shall be made without any extra cost.
Mode of Measurement & Payment:
Work includes cost of material and labour with polishing complete. Measurement shall be taken
between finished face of skirting, dado or wall plaster - visible top polished Kota stone only in length
and width. Rate shall be paid for a unit of 1 smt basis of finished work. Mode of Payment will be on
smt. basis of finished work. No deduction shall be made for any opening in the floor of area 0.10 sq. mt.
Rate shall be paid for a unit of 1 sq. meter basis.
Providing and laying polished kota stone slab 20mm thick in risers of steps, skirting Dedo and pillars
laid on 10mm thick cement mortar 1:3 (1-Cement : 3 coarse sand) and jointed with gray cement slury
mixed with pigment to match the shade of slab including rubbing and polishing etc. complete. (work
for all floors)
Providing and laying full length 20 mm thick Mirror polished Kota stone slab skirting, and steps of trade
& landing, dado (Using maximum available length ) over 10mm (Average) thick base of cement mortar
1:3 (1-cement :3-coarse sand) and jointed with grey Cement slurry including rubbing and polishing etc.
complete. for all floors and levels. (NO WAXING WILL BE PERMITTED). (work for all floors)
1 –25mm thick Kota Stone Machine Cut and fine dressed at all edges shall confirm to M-49
2 – Cement Mortar shall confirm to M-11 as per attached Specification of Materials
3 – Water shall confirm M-1 as per attached Specification of Materials
The relevant specification of this item should be followed Item No. 21 except that kota stone shall be
fixed for skirting, and steps of trade & landing, dado (Using maximum available length) in C. M. (1 : 3)
and the polishing shall be done.
Mode of Measurement & Payment:
Work includes cost of material and labour with polishing complete. Length shall be measured along the
finished face of skirting, and steps of trade & landing, dado, height shall be measured from finished of
level of treads or floor to top, lining of pillars shall be measured under this item. Measurement shall be
taken for visible surface only. No deduction shall be made for any opening in the floor of area
sq.mt. Rate shall be paid for a unit of 1 sq. meter basis.
Providing and laying wired finish screed (1 Cement : 5 Coarse Sand : 10 Graded Stone Aggregate
20mm down size) in required thick as per drawing /instruction by the Architect/Engineer In Charge as
bedding for flooring laid to achieve propoer slope or 0-0 levelled surface and curing complete
excluding cost of formwork at any type of surface all floors all levels all heights etc. complete as
directed by EIC. (work for all floors)
Cement concrete 1:2:4 (1-Cement: 2-coarse sand: 4-crushed stone aggregates 20 mm nominal size)
Water shall conform to M-1. Sand confirm to M-6. Cement confirm to M-3. Black trap stone aggregate
20/ 6mm mm nominal size to M-13.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
Kg. weights. The volume of one such bag being taken as 0.0347 m3. Boxes of suitable sizes shall be used
for measuring sand and aggregate. The size of the boxes (internal) shall be 30 cm. x 30 cm. and 38 cm.
deep or as per the convenience of the contractor. The Internal volume of the box shall be taken as
0.0347 m3. While measuring the aggregate and sand, the box shall be filled without shaking ramming
or hammering. The proportioning of sand shall be on the basis of its dry volume and in case of damp
sand; allowances for bulkage shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and maintained throughout the construction. The mixer shall
comply with IS 1791 and IS 12119. Measured quantity of aggregate, sand and cement required for each
batch shall be poured into the drum of the mechanical mixer while it is continuously running. After
about half a minute of dry mixing, measured quantity of water required for each batch of concrete mix
shall be added gradually and mixing continued for another one and a half minute. Mixing shall be
continued till materials are uniformly distributed and uniform colour of the entire mass is obtained and
each individual particle of the coarse aggregate shows complete coating of mortar containing its
proportionate amount of cement. In no case shall the mixing be done for less than 2 minutes after all
ingredients have been put into the mixer. When hand mixing is permitted by the Engineer-in-charge for
small jobs or for certain other reasons, it shall be done on a smooth watertight platform large enough
to allow efficient turning over the ingredients of concrete before and after adding water. Mixing
platforms shall be so arranged that no foreign material gets mixed with concrete nor does the mixing
water flow out. Cement in required number of bags shall be placed in a uniform layer on top of the
measured quantity of fine and coarse aggregate, which shall also be spread in a layer of uniform
thickness on the mixing platform. Dry coarse and fine aggregate and cement shall then be mixed
thoroughly by turning over to get a mixture of uniform colour. Specified quantity of water shall then be
added gradually through a rose-can and the mass turned over till a mix of required consistency is
obtained. In hand mixing, quantity of cement shall be increased by 10 % above that specified. 3.2.3
Mixers, which have been out of use for more than 30 minutes, shall be thoroughly cleaned before
putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first batch of
concrete from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing
plant shall be thoroughly cleaned before changing from one type of cement to another. Bedding for
flooring lay to achieve propoer slope or 0-0 levelled surface in required thick as per drawing
/instruction by the Architect/Engineer In Charge
The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with IS : 1199-1959. The slump of
10 mm. to 25 mm. shall be maintained for workability. The concrete shall be compacted with vibrator -
needle or surface type depending on the nature of application.
Contractor shall give the Engineer-in-charge due notice before placing any concrete inspection shall not
relieve the Contractor of his responsibility for the safety of men, machinery, materials and for results
obtained. The surface shall be cleaned and well wetted thoroughly before commencing the laying
work.. For access to different parts, suitable mobile platforms shall be provided so that work will not
disturb. All floors shall be cleaned and made free from standing water, dust, snow or ice immediately
before placing of concrete. No concrete shall be placed in any part of the structure until the approval of
the Engineer-in-charge has been obtained. Thickness of concrete shall be as per drawing /instruction by
the Architect/Engineer In Charge The surface shall be kept wet for seven days. After curing the surface
shall be washed clean.
Mode of Measurement & Payment:
Work includes cost of material and labour complete. Measurement shall be taken for visible top of
concrete only in length and width. Rate shall be paid for a unit of 1 Cu. Mt. basis of finished work. Mode
of Payment will be on Cu. Mt. basis of finished work. No deduction shall be made for any opening in the
floor of area 0.10 sq. mt. The risers of steps, dado or skirting shall be measured from finished levelling
sq. Meter. Rate shall be paid for a unit of 1 sq. meter basis.
Providing and laying white/coloured glazed or ceramic tiles 8 to 10 mm thick and 300x450mm size in
skirting, risers of steps and dedo on 10mm thick cement plaster 1:3 (1-cement :3-coarse sand) and
jointed with white cement slurry) . (Work for all floors)
Water shall confirm to M - 1 cement shall confirm to M - 3 sand shall confirm to M – 6. Instead of
Kota Stone (M-49) it should be white / coloured ceramic tiles 8 to 10 mm thick and 300 x 450 mm size
(M-45) & (M-55) of General Technical Specifications for building work.
In case of brick masonry wall, the joints shall be racked out to depth at least 15mm while the masonry
is being laid. In case of concrete wall, the surface shall be chiseled and roughened with wire brushes.
The surface shall be cleaned and well wetted thoroughly before commencing the laying work. The wall
surface shall be covered 10mm thick plaster of cement mortar (1:3) mix and allowed to harden. The
plaster shall be roughened with wire brushes both ways. The back of the tiles cut into the required size
shall be floated with grey cement slurry and edges with white cement slurry set in bedding mortar. the
whole work is to be carried out by fixing white / coloured ceramic tiles 8 to 10 mm thick and 300mm x
450mm size jointed with white Cement on 10mm thick cement plaster 1:3 (1-cement :3-coarse sand)
The tiles shall be gently tapped in position one after the other keeping the joints as thin as possible.
Top of skirting or dado shall be truly horizontal and the joints vertical or as per required pattern. Risers
of steps, skirting and dado shall rest on top of treads or flooring. Where full size tiles cannot be fixed,
they shall be cut to the required size and the edges are smoothened. The joints shall be cleaned and
flush pointed with white cement if require. The surface shall be kept wet for seven days. After curing
the surface shall be washed clean.
Mode of measurement & payment:
Work includes cost of material and labour. Item shall be measured from finished of level of treads or
floor to top Rate shall be for a unit of one Square Meter. No extra Payment for to making offset for
door /window shutter resting. No deduction shall be made for any opening in the floor of area 0.10 sq.
Providing and laying water proofing treatment in sunken portion of WCs, bathroom, Swimming Pool
Area, etc., by applying cement slurry mixed with water proofing cement compound consisting of
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @
0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.
(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement
compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water
curing for 48 hours.
The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of
pipes and masonry with polymer mixed slurry.
As per BOQ Item, Providing and laying water proofing treatment in sunken portion of WCs, bathroom,
Swimming Pool Area, etc., by applying cement slurry mixed with water proofing cement compound
consisting of applying:
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @
0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.
(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement
compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing
The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes
and masonry with polymer mixed slurry.
Mode of Measurement & Payment
The rate shall be for unit of one square meter.
Providing proprietary Acrylic Polymer modified cementations water proofing, System to horizontal
roof and part of parapet (300 mm height rounding off junction and extending them up to 15 cm along
the wall) by providing and laying 12mm to 20mm broken pieces of glazed tiles to be laid on Cement
Mortar (1:3) to plain or slope tempered to bring chaina mosaic tile work over Av. 50mm thick CC
1:2:4 flooring and grouting with white cement slurry with matching pigment including clearing with
water and oxalic acid etc. complete. (plan area to be measured) with 10 years guarantee
The cement shall confirm to M-3, water shall confirm to M-1, sand shall Confirm to M-6, Acrylic
Polymer modified cementations water proofing compound shall confirm to manufacturer’s
specification, CC 1:2:4 shall confirm to and cement mortar shall confirm to M-11, White glazed tiles
Minimum 6mm thick used for items shall be broken to proper size, shape and color, Fiberglass R.P.
Tissue. Material shall be got approved by E.I.C
The treatment shall be carried out along the vertical surface of the parapet and other joining wall up to
height of about 300mm in a shape of quarter round vata and finishing the adjoin surface between china
mosaic and vertical surface of the parapet.
Surface Preparation:
Prior to application of Acrylic Polymer modified cementations water proofing work, all surfaces must
be prepared properly to avoid failure. The surface shall be cleaned to remove all dust, foreign matters,
loose materials or any deposits of contaminants which could affect the bond between the surface and
the Acrylic Polymer modified cementations water proofing material coating. New surfaces of the
structural concrete shall be reasonably smooth to avoid sharp projections so as not to impede the
application of Acrylic Polymer modified cementations water proofing material coating. All concrete
surfaces shall be thoroughly pre-wetted for at least one hour prior to the application of Acrylic Polymer
modified cementations water proofing material coating by sprinkling of water on flat surface and by
vigorously spraying water on vertical/inclined surfaces. When placing Acrylic Polymer modified
cementations water proofing material coating, all water shall be removed so that surface is only damp
or surface dry. In no case there shall be standing water or a shiny wet surface. Depressions are filled
and leveled using PMC fillers. For the PMC filler the mixing ratio shall be as per the manufacturer
Application should be strictly under the guidance and as per instructions/direction of the
manufacturer or as follows:
Application of one coat of Polymer Modified Cementations (PMC) slurry coating over the prepared
concrete surface. The slurry shall be spread out over an area which can be covered with fiber glass
fabric before the slurry dries out. Unroll the fiber glass fabric on to the wet slurry layer and impregnate
with PMC slurry by pressing the fabric down so as to even out all wrinkles.
Application of one coat PMC slurry coating over the glass fabric so as to fill and over the fabric.
Application of one coat PMC brush topping over the slurry coating applied surface after the slurry coat
has dried on the next day. Providing protective overlay of 50mm (Average) thick screed concrete /
plaster to slope of admixed Integral Cement Waterproofing compound after curing of PMC brush top
Should be as per the direction of the Manufacturer During the first 12 hours of curing, it must be
protected from abrasion, rain and other adverse conditions. No Activity shall be allowed on a standard
PMC treated surface within 48 hours after installation. After application of final coat of PMC
composition, initial air drying shall be done for 2-6 hours. During this period no water is to be used for
curing. Moist curing shall be done for the next 24 hours by way of spraying water on the PMC system.
Following moist curing, the PMC coating shall be allowed to air dry for 3 days before submersion in
Providing & laying china mosaic flooring of make (somany, jhonson, asian)for plain and curved surfaces
at floor, dado, otta etc. comprising of 20 to 25 mm size broken pieces of ceramic/ glazed tiles (only
white colour) laid over 1:6 cement mortar bedding including applying cement slurry at the rate of
kg per Sq.m. on plain or sloped surfaces and filling joints with white cement. The flooring/ dado shall be
tampered with wooden rammer not exceeding 2 Kg in weight to bring the mortar up to the surface
including rounding of the junctions and extending them up to 15 cm along the parapet wall. The rate
shall include any type of bands, vata, any colour, any pattern or design as per drawing, curing, cleaning
with water and oxalic acid etc. complete as sample approved by Architect/ EIC. (Only plan area shall be
measured including vata up to 150mm height). Rates should be inclusive of acid washing and vata.
The cement shall confirm to M-3, water shall confirm to M-1, sand shall Confirm to M-6, and cement
mortar shall confirm to M-11, White glazed tiles M-55 of attached Specification of Materials. Minimum
6mm thick used for items shall be broken to proper size, shape and color, Material shall be got
approved by E.I.C
The treatment shall be carried out along the vertical surface of the parapet and other joining wall up to
height of about 150 mm in a shape of quarter round vata and finishing the adjoin surface between
china mosaic and vertical surface of the parapet.
The glazing shall be uniform shade. The thickness of tile shall be Minimum 6mm.Before laying the
bedding of C:M contractor shall be applying cement slurry on prepared surface at the rate of 2 kg / smt
by adding waterproof compound as per approved by Engineer in charge and dosages of Water proofing
compound should be as per manufacturer. First of all cement mortar in CM (1:3) (1 cement 3 sand)
shall be laid on floor 20 to 25 mm thick average bedding by adding waterproof compound as approved
by the Engineer-In Charge and laid in line & level in necessary gradient for easy flow of rain water from
roof. The joints between these two pieces shouldn’t exceed more than 3 to 4 mm. These pieces are
hammered with wooden mallet to achieve uniform surface. Make the projected edge (kani) between
the parapet plaster and the vata on second day. Before laying the pieces of glazed tiles on bedding
contractor shall be spray dry cement and finishing(Flush pointing) the top surface of china mosaic with
approved quality of white cement. Required chipping for outlet shall be done for proper drain of
rainwater. Drain outlet shall be suitably placed with respect to the roof gradient to ensure rapid
drainage and prevent local accumulation of water on the roof, surface, masonry drain mouth shall be
widen sufficiently and rounded with cement mortar. From drain outlets a groove shall be cut all rounds
to touch the treatment. When a pipe passes through a roof on which water proofing treatment is to be
laid, a cement, concrete angle fillet shall be built round it and the waterproofing treatment taken over
the fillet. Contractor shall be give waterproof test by filling water pond 150 mm deep for seven days.
Contractor shall be wash prepared waterproofing surface finally by mild acid as per instruction.
Contractor should give guarantee for water proofing for 10 years with depositing 20% of item value by
F.D.R. up to guarantee period (i.e. 5 years). If any leakage observed, the agency will carry out repairing
work time to time during 5 years of guarantee period and keep the terrace water proof. On failing of
repairing by agency timely, PIU or Health Department will attend leakages time to time and recovery
Mode of measurements and payment:
Measurement shall be measured in square meter area covered in treatment with treatment done over
the parapet walls. In measurements, no deduction shall be made for either openings or recesses for
chimney; stacks roof lights, columns etc. for areas up to 40 sq. mt. Nor anything-extra labour and
materials in forming such openings. For similar area exceeding 40 sq.mt. deduction shall be made in
measurements for full opening but nothing extra shall be paid for extra labour and materials in forming
such opening. Treating the cracks shall not be paid separately. All necessary tools, tackles, labour,
scaffolding etc; required shall be arranged by contractor and rate quoted shall be inclusive of all.
(A guarantee bond of ten years guarantee requisite stamp paper shall be given by the contractor to
the department. Any defect will be observed later on, shall be rectified by the contractor at his own
risk and cost. Contractor shall be bound to carry out all such rectification work without claiming any
Providing and fixing 30mm thick factory made moulded door shutter wood free consisting of frame
made out of M.S. tubes of 19 gauge thickness and size of 25mm x 25mm for stiles, top and bottom
rails, M.S. frame shall have a coat of steel primers. The inner panel shall consist of 25mm thick High
Density EPS conforming to IS 4671-1984 bonded with 2mm thick termite proof, water proof and fire
resistant moulded PVC sheet with 2,4,6 raised panel design in different plain and /or prelim colours
after routing the moulded design on one side and 2mm plain and/or prelim PVC sheet on other side
of the EPS. The edges of panel to be sealed with lipping of 10mm wide PVC sheet batton (made by
sticking 2 PVC rigid foam sheets of 5mm thickness using PVC solvent cement) and stiles 25mm (5mm
x 5) thick and 30mm width PVC sheet fitted along M.S. tube for lock provision and for lock height
5mm thick PVC sheet of size 150mm x 100mm fixed with upper and lower face of inner side of EPS
panel etc. complete as per direction of Engineer in charge manufacture’s specification and drawing.
All materials such as M.S. tubes, high density EPS core, PVC sheets, PVC battens, adhesives, solvent
cement, steel primer and all associated components shall be new, unused, and of approved make and
quality. High density EPS shall conform to IS 4671:1984. PVC sheets shall be termite-proof, waterproof
and fire-resistant, uniform in thickness, colour and finish. All materials shall be procured from approved
manufacturers and brought to site in original packaging, stored and handled as per manufacturer’s
recommendations.
The door shutter shall be factory manufactured under controlled conditions. M.S. members shall be
properly cut, welded, cleaned and coated with approved steel primer before assembly. EPS core and
PVC sheets shall be firmly bonded using approved adhesive to ensure permanent adhesion without
delamination. Edge lipping, stiles and lock reinforcements shall be fixed accurately and flush with the
shutter surface. The finished shutter shall be rigid, free from warping or defects and installed true to
line, level and plumb, strictly in accordance with approved drawings, manufacturer’s specifications and
directions of the Engineer-in-Charge.
Mode of Measurement (Unit: Sq.m):
Measurement shall be taken in square metres by calculating the overall height and width of the
finished door shutter. The measured area shall include all components of the shutter complete in all
respects. No separate measurement or extra payment shall be made for M.S. framework, EPS core, PVC
sheets, edge lipping, stiles, lock provisions, reinforcements, cut-outs or any incidental work, as these
are deemed to be included in the item rate.
Providing and fixing Clear Float Glass as per approved make of any size, any shape and specified
thickness in frame and shutter work with necessary cutting of glass as per drawing & specifications
including providing and fixing EPDM quality rubber/ silicon sealant/ structural sealant of make
Wacker / Dowcorning / GE / Soudal / Bostik or equivalent as per approved make of 3M tape on the
periphery of the glass as per the required thickness etc. complete at all floors/ any levels/ any
heights as per the directions of Architect. Actual installed quantity shall be measured and paid. Rate
shall be inclusive of all type of wastage. SHGC= 0.39, U value= 0.61BTU/hr. sqft. Deg F or 3.46 W/sqm
K.(a) 6 mm clear thick (work for all floors)
The relevant specification of item shall be followed as given in BOQ
Mode of measurement & payment:
Rate shall be paid for a unit of 1 Sq.mt. basis of finished work. Mode of Payment will be on Sqm. basis
of finished work.
Providing, fabricating, assembling, hoisting/ erecting and fixing in position at any heights/ any levels/
all floors/ all shapes & sizes with all leads & lifts using MS Rolled Steel Sections, Hollow sections,
Tubular Sections, MS Plates, Chequered Plates, MS Pipes, Perforated Sheet, Flats, Bright Bars, Angles,
MS Sheet, Girder, Beam. threaded J bolts, insert plate, support plate etc. as per drawing. all
confirming to latest relevant IS codes for the work of steel structures like staircases, railings,
handrail, jali, gates, grills, bracings, platforms, brackets, monkey ladder, cattle trap, grill door, pipe
rack, rungs, false ceiling frame work, framing for facade, Roof canopy, fencing posts, M.S. Screen &
fencing jali frame work etc. including straightening, cutting, bending, bolting and welding the
members all as per structural drawings and as per detailed specifications (for materials &
workmanship) including necessary scaffolding/ staging etc. complete in the situations described
hereinafter and comprising of : i) Profile Cutting of components to required length/ width and
shape/profile; ii) Smooth grinding/ machining of edges/ faces/ all welding joints; iii) Necessary
welding (electric arc welding) for required weld lengths and sizes.
The structural steel shall conform to M-22 of attached Specification of Materials.
Structural work shall be prepared as per the drawings or as directed for fixing to wooden frames of
windows / walls / RCC members etc. Structural work shall be fabricated to the designs and patterns
shown in the drawings and the weight shall be as directed, and the joints shall be riveted or welded as
shown in the plan or as directed. The grill so framed shall be fixed in to the frames of the windows /
walls / RCC members etc. before they are erected in position. The outside strip frame of the grill shall
be housed to its full thickness into the recess cut into the frame of the windows etc. The grill shall be
fixed to the frame with number of bolts and nuts of screws viz. bolt nut/screw per 30 cm. of the length
of outer strip subject to a minimum of 2 Nos. on each side of the frame or as indicated in the drawings
or as directed. The welding work shall conform to I.S. 816-1969.The bolts and nuts or screws shall be
counter sunk and shall be fixed with the top of their heads flush with the face of frame strips.
Mode of measurement & payment:
No payment shall be made for weight of screws, bolts, nuts etc. Only weight of grill / door frame /
structural work shall be paid. The rate shall be for unit of one Quintal including all material, labour,
erection, hoisting, scaffolding protective measure, required for proper completion of the item of work.
This shall also include conveyance and delivery handling, loading, unloading and storing etc. required
for completing the item described above including necessary wastage involved.
Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts and
nuts 8mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with white lead
complete excluding the cost of purlins, Rafters and Trusses.(1) 0.80 mm thick sheet.
Corrugated G.I. roofing sheets shall be of Class–3 quality, 0.80 mm thick, uniform in profile, thickness
and finish, free from defects and conforming to relevant IS specifications. All fixing accessories such as
galvanised iron J or L hooks, bolts and nuts of 8 mm diameter, G.I. limpet washers, bitumen washers
and white lead shall be of approved quality. All materials shall be new, unused and procured from
approved manufacturers.
Corrugated G.I. sheets shall be laid to the required slope and alignment, properly overlapped and fixed
securely using galvanised iron J or L hooks, bolts and nuts with bitumen and G.I. limpet washers, filled
with white lead to ensure watertight fixing. Sheets shall be fixed without distortion, damage or undue
stress and shall be aligned true to line and level. All fixing work shall be carried out neatly and in
accordance with approved drawings, relevant IS codes and the directions of the Engineer-in-Charge.
The work shall be complete in all respects, excluding the cost of purlins, rafters and trusses.
Mode of Measurement (Unit: Sq.m):
Measurement shall be taken in square metres of the finished corrugated G.I. sheet roofing, measured
over the net covered area. The rate shall include the cost of sheets, fixing accessories, labour, tools,
overlaps, wastage and all incidental work required for proper installation. No separate payment shall
be made for hooks, bolts, nuts, washers, bitumen or white lead, as these shall be deemed to be
included in the item rate.
Painting three coats paint (1 coat of primer and 2 coats of enamel paint)and priming coat on new
steel and other metal surface with enamel paint, brushing, interior to give an even shade including
cleaning the surface an even shade including cleaning the surface of all dirt, dust and other foraging
matter.(work for all floors)
The enamel pain shall conform to M-44 B
The ready mixed primer, brushing red shall conform to I.S. 102-1962
The thinner (linseed oil) shall conform to I.S. 75-1973. If for any reason, thinning is necessary m case of
ready mix paint the brand of thinner recommended by manufacture shall be used.
1. General: The materials required for work of painting work shall be obtained directly from
approved manufactures or approved dealer and brought to the site in maker's drums; kegs. etc.
with seal unbroken
2. All materials not in actual use shall be kept properly protected, lids of containers shall be kept
closed and surface of paint in open or partially open containers covered with a thin layer of
turpentine to prevent formation of skin. The materials which have become state or flat due to
improper and long storage shall not be used. The paint shall be stirred thoroughly in its
container before pouring into small containers. While applying also, the paint shall be
continuously stirred in smaller container. No left-over paint shall be put back into stock tins.
When not in use the containers shall be kept properly closed.
3. If for any reasons, things is necessary, the brand of thinner recommended by the manufacturer
Surface Preparation
The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be
thoroughly removed before painting/Primer is started. No painting on exterior or other exposed part of
the work shall be carried out in wet, damp or otherwise unfavorable weather and all the surfaces shall
be thoroughly dry before primer / painting work is started.
Application of Primer
1. After the preparation of the surface, the priming coat shall be applied immediately. The
brushing operations are to be adjusted to the spreading capacity advised by the manufacturer
of the particular primer. The paint shall be applied evenly and smoothly by means of crossing
and laying off. The crossing and laying off consists of covering the area over with paint,
brushing alternately in opposite directions, two or three times and then finally brushing lightly
in a direction at right angles to the same. In this process, no brush marks shall be left after the
laying off is finished. The full process of crossing and laying off wall constitute one coat.
2. During painting, every time, after the priming coat has been worked out of the brush bristles or
after the brush has been unloaded, the bristles of the brush shall be opened up by striking the
brush against portion of the unpainted surface with the end of the bristles, held at right angles
to the surface, so that bristles thereafter will collect the correct amount of paint when dipped
again in to a paint container The prima/y coat shall be allowed to dry completely before
painting is started.
3. No hair marks from the brush or clogging at pain puddles in the corner of panels angles of
molding etc. shall be left on the work
4. Special care shall be taken while painting over bolts, nuts, rivets, overlaps etc.
Application of Paint
1. Brushing operations are to be adjusted to the spreading capacity advised by the manufacture
of particular paint. The paint shall be applied evenly and smoothly by means of crossing and
laying off. The crossing and laying off consists of covering the area over with paint, brushing the
surface hard for the first time over and then brushing alternately in opposite directions two or
three times and then finally brushing lightly in a direction at right angles to the same. In this
process, no brush marks shall be left after the -laying off is finished. The full process of crossing
and laying off will constitute one coat.
2. Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand-
paper and loose particles brushed off before next coat is applied. Each coat shall vary slightly in
shade and shall be got approved from Engineer-in-charge before next coat is started.
3. Each coat the last shall be lightly rubbed down with sand paper of fine pumice stone and
cleaned of dust before the next coat is applied. No hair marks from the brush of clogging of
paint puddles in the corners of panels, angles of moldings etc. shall be left on the work.
4. Special care shall be taken while painting over bolts, nuts, rivets, overlaps etc. Approved best
quality brushes shall be used.
Mode of Measurement & payment
1. The new steel and other metal surface shall be measured under this item
2. All the work shall be measured net in the decimal system, as executed subject to the following
limits unless otherwise stated hereinafter
a. Dimensions shall be measured to the nearest 0.01 meter.
b. Areas shall be worked out to the nearest 0.01 sq. meter.
3. No deductions shall be made for openings not exceeding 0.5 sq. mt. each and no addition shall
be made for painting to beddings, moldings, edges, jambs, soffits, sills etc. of such opening.
4. In case of fabricated structural steel and iron work, priming coat of paint shall be included with
frication. In case of trusses if measured in sq. m. compound girders, stanchions, lattices, grader
and similar work, actual area shall be measured in sq. m. and no extra shall be paid for painting
on bolts heads, nuts, washers etc. No addition shall be made to 1 he weight calculated for the
purpose of measurements of steel and iron works for paint applied on shop or at site.
5. The different surfaces shall be grouped into one general item, areas of uneven surfaces being
converted into equivalent plain areas in accordance with the table given as per Annexure-ll for
6. The rate shall be for a unit of One sq, meter.
SUPPLING AND LAYING OF DURABOLT™ ACRYLIC SPORTS FLOORING (8 LAYERS):
Supply and installation of European origin ITF certified 8 layers acrylic system with thickness up to
3mm. The flooring should be certified by International Tennis Federation (ITF) and should have
application as first layer of primer (% 100 acrylic latex based emulsion to improve bond of acrylic
court system to the asphalt surface having consumption ratio of 0.014kg/sqft), second layer of acrylic
Resurfacer (Filling and smoothing asphalt or concrete surfaces in preparation for Acryflex T tennis
court system. And also fills the surface chips, voids and conceals repairs while providing a smooth
surface for color coating. It should have a consumption ratio of 0.046kg/sqft), Third, Fourth & Fifth
layer of Unirubber liquid cushion layers at a consumption ratio of 0.10 kgs per sqft all together, Sixth
& Seventh layer of Precoat (Quartz filled % 100 acrylic latex based textured tennis topcoat with
consumption ratio of 0.078 kg/sqft) and Eighth layer of Topcoat (100% acrylic latex polymer & colour
coat for the finished surface to protect from UV. It should have consumption ratio of 0.023 kg/sft).
On top of these 8 layers, the line marking should be done with Overline paint (% 100 acrylic latex
based high hiding line paints. It should have consumption ratio of 4 kg/court). The acrylic resurfacer
must have silica sand infill to be embedded into it with consumption ratio of 0.065 kg/sqft. The
product must be approved/licensed/preferred by the respective International Sports Federation &
used at the Indian/International Championships recognized by the respective Regional /International
Sports Federation.
Make: As approved by architect.
Acrylic sports flooring system shall be of European origin, ITF certified, and consist of an 8-layer acrylic
system with total thickness up to 3 mm. All materials including primer, acrylic resurface, unrubbed
liquid cushion, precoat, topcoat and overline marking paint shall be 100% acrylic latex based, UV
resistant, weather resistant and suitable for outdoor sports flooring. The primer shall be acrylic latex
emulsion with a consumption of 0.014 kg/sqft. The acrylic resurface shall be used for filling and
smoothing asphalt or concrete surfaces with a consumption of 0.046 kg/sqft, embedded with silica
sand infill at 0.065 kg/sqft. The unirubber liquid cushion layers (three coats) shall have a combined
consumption of 0.10 kg/sqft. The precoat layers (two coats) shall be quartz-filled acrylic latex textured
coating with a consumption of 0.078 kg/sqft. The topcoat shall be 100% acrylic latex polymer colour
coat with UV protection and consumption of 0.023 kg/sqft. Line marking shall be carried out using
overline paint with a consumption of 4 kg per court. All products shall be approved, licensed or
preferred by the respective International Sports Federation and shall have been used in Indian or
International Championships recognized by Regional / International Sports Federations. Make shall be
as approved by the Architect.
The acrylic sports flooring system shall be supplied and installed by authorized and experienced
applicators strictly as per manufacturer’s specifications and ITF guidelines. The asphalt or concrete base
shall be properly cleaned, repaired and prepared before application. Each layer shall be applied
uniformly at the specified consumption rate and allowed to cure adequately before applying the
subsequent layer. Surface finish shall be seamless, non-slippery, durable, and free from cracks, bubbles
or undulations. Line marking shall be accurate, true to dimension and in accordance with ITF standards.
The completed flooring shall meet performance requirements for playability, safety and durability, to
the satisfaction of the Engineer-in-Charge.
Mode of Measurement (Unit: Sq.m):
Measurement shall be taken in square metres of finished acrylic sports flooring area. The rate shall
include the cost of all materials, surface preparation, application of all eight acrylic layers, silica sand
infill, line marking, labour, tools, equipment, curing, testing and all incidental works required for
completion. No separate payment shall be made for individual layers, markings or consumables, as
these shall be deemed to be included in the item rate.
Supplying, Installing approved Outdoor Basket Pole made from 180mm x 180mm Square
Pipe with 3.20m Extendable arrangement . imported quality Acrylic Board having 180cm x 105cm
size & shall be 20mm thick system shall be Adjustable Height for Juniors/Men/Womwn including Net
(any color) , Post Made of 80mm x 80mm and 100mm x 100mm MS pipe comprises special internal
ratchet system .The ratchet enables perfect tension control of the net. Net should be with branded
Net as requires for Volleyball Court and as Approved by Regulatory Authority. The rate inclusive of
Epoxy Paints of Poles, all labours, Grouting materials etc to complete for use. Color of Net and Post
as per the Approved Drawings. Heigh of pole shall be as per international stanadard. The work to be
completed as per Technical Specification. Rate also includes all necessary accessories, Base plates
and Anchor fastner etc to complete the Work as per Technical Specification and International
Make: As approved by architect.
The outdoor basketball pole system shall be supplied and installed using heavy-duty M.S. construction,
comprising a main pole made from 180 mm × 180 mm square pipe with 3.20 m extendable
arrangement, complete with adjustable height mechanism suitable for juniors, women and men,
conforming to international standards. The system shall be provided with imported quality acrylic
backboard of size 1800 mm × 1050 mm and 20 mm thickness, fixed with approved mounting hardware.
The post assembly shall include 80 mm × 80 mm and 100 mm × 100 mm M.S. pipes incorporating a
special internal ratchet system to enable perfect tension control. Net shall be of branded quality,
suitable for outdoor basketball use, of approved colour, and compliant with requirements of the
concerned regulatory authority. All materials, accessories, base plates, anchor fasteners and fittings
shall be new, of approved make and quality. Epoxy paint for poles and all protective coatings shall be of
approved brand. Make shall be as approved by the Architect.
Installation shall be carried out by skilled and experienced personnel strictly in accordance with
approved drawings, manufacturer’s recommendations, technical specifications and international
standards. Poles shall be erected true to line, level and plumb, securely fixed using approved base
plates, anchor fasteners and grouting materials. Height adjustment mechanism and ratchet system
shall be properly aligned, smooth in operation and fully functional. Acrylic backboard and net shall be
fixed securely without distortion or damage. Epoxy paint shall be applied evenly to achieve a uniform,
durable finish. Colour of pole and net shall be as per approved drawings. The complete system shall be
tested after installation and handed over in ready-to-use condition to the satisfaction of the Engineer-
Mode of Measurement (Unit: Each / Set):
Measurement shall be taken as one complete outdoor basketball pole system, including pole,
extendable arrangement, adjustable height mechanism, acrylic backboard, net, epoxy painting, base
plates, anchor fasteners, grouting materials, labour and all accessories required for complete
installation. The quoted rate shall be inclusive of all materials, labour, tools, equipment, transportation,
installation and testing. No separate payment shall be made for individual components or accessories,
as the item shall be measured and paid as a complete set.
Providing and laying cement concrete flooring 1:2:4 (1-cement : 2-coarse sand : 4-graded stone
aggregate 20mm nominal size) laid in one layer and finished with a floating coat of neat cement. (B)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone aggregate
20 mm. nominal size shall conform to M-12. Cement concrete of 1:2:4 proportion measured by volume
shall conform to relevant specifications of ordinary grade 1:2:4 concrete.
1. The cement concrete flooring of 50 mm thick (Average) is to be laid as per the site condition.
The concrete shall be mixed in a mechanical mixer at the work. Hand mixing may however be
allowed for smaller quantities of work and in case of failure of machineries or as permitted by
the Engineer-in-charge. It shall be carried out on a water tight platform and care shall be taken
to ensure that mixing is continued until the mass is uniform in colour and consistency. However
is such cases 10% more cement than otherwise required shall have to be used without any
extra cost. The mechanical mixing shall be done for period of 1.1/2 to 2 minutes. The quantity
of water shall be just sufficient to produce a dense concrete of required workability for the
purpose, Flooring or specified thickness shall be laid in accordance with approved pattern or as
directed. Finishing operation shall depending upon the temperature and atmospheric
conditions. The surface shall be left for some time till moisture disappears form it. Fresh
quantity of cement shall be mixed with water to form a thick slurry and spread over the surface
while the concrete is still green. Use of dry cement or cement and sand mixture sprinkled on
this surface to stiffen the concrete or absorb excessive moisture shall not be permitted. The
cement slurry shall then be properly pressed twice by means of iron floats, once when the
slurry is applied and the second time when cement setting and finished floated smooth The
surface shall be marked with string or B.R.C. fabric jali to make the surface non-slippery as and
when directed. The junction of floors with wall plaster, dado or skirting shall be rounded off
where so 99 required up to 25 mm. radius. Flooring in lavatories and bath rooms shall be laid
after fixing of water closet and squatting pans and floor traps which shall be plugged while
laying the floors and opened after the floors are completed. Any damage done to water supply
or sanitary fittings during execution of work shall be made good.
2. After the final set, the concrete shall be kept continuously wet. if required by ponding for a
period of not less than 7 days from the date of placement.
3. The form work shall be provided if necessary as directed by Engineer-in-charge. Concreting
shall be done as per alternate bay method with necessary centering either by mastic or cement
mortar as directed
Mode of measurements & payment
1. The rate shall include the cost of all materials and labour involved in all the operations
described above. No deduction shall be made or extra paid for any opening up to 0.1 sq. mt. In
area in the floor, nothing extra shall be paid for laying the floor at different levels in the same
room or the counter yard.
2. The rate shall be for a unit of one sq. meter.
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 60mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint with sand
in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
High strength high finish on higher Vibropress Type machine inter locking concrete Block 60 mm thick
with grade of concrete M-300 pneumatic compressed by automation mechanically pressed and as per
approved design
1. Water shall confirm to M-1
2. Cement shall conform to M-3,
3. Sand shall conform to M-6,
4. Mortar shall conform to M-11,
5. Aggregates shall conform to M-
6. Shuttering shall conform to M-26.
Laying should be done on 75 mm Thick Sand Completed Bed. This work shall be carried out in the
central median and/or along the footpaths in conformity with the lines, levels and dimensions as
specified in the drawings.
The paver blocks should be High strength high finish on higher Vibro press Type machine inter
locking concrete Block 60 mm thick with grade of concrete M-250 pneumatic compressed by
automation mechanically pressed and as per approved design at appropriate plant having facility for
applying high pressure and controlled vibration.
Sr Parameters Minimum Requirements
1 Percentage water Absorption Average not over 6%
2 Compressive Strength Average not less than 450 kg/cm2
3 Tensile Splitting Strength (as per EN Average not less than 3.6 M pa
4 Average wear in thickness – Abrasion Confirming to Grade ‘H’ of EN
5 Tolerance in size (Length + Breadth) + 1.5 mm
6 Thickness of wearing layer Not less than 5 mm
7 Tolerance in thickness of Block + 3 mm
8 Colour UV Light resistant fast colours
Necessary testing shall be carried out to maintain the required compressive strength. To ensure
durability, the average water absorption in a block should not exceed 5%. In situations, where parts of
blocks are to be used e.g. around manholes, the block should be purpose cut at site.
The Bedding sand should be free of deleterious materials. The thickness of the bedding layer should be
as shown in the drawing and should be of uniform thickness. The grading of the bedding sand should be
IS Sieve Size Percent Passing
600 micron 25-60
300 micron 10-30
150 micron 0-15
Joint Filling Sand
The gaps in between two paving blocks (not more than 3mm) shall be filled relatively finer than the
bedding sand. The joint filling sand should be as dry as possible. The gradation for the joint filling sand
IS Sieve Size Percent Passing
600 micron 60-90
300 micron 30-60
150 micron 15-30
The construction of block pavement involves preparation of subgrade, sub base and base course
layers, bedding sand and finally the laying of blocks.
Preparation of Sub grade
This is the foundation layer on which the block pavement is constructed. The water table should be at a
minimum depth of 600mm below the sub-grade. Sub-grade should be compacted in layers of 150 or
100 mm thickness as per IRC: 36-1970.The prepared sub grade should be graded and trimmed to a
tolerance of +/- 20 mm of the design levels, and its surface evenness should have a tolerance of within
15 mm under a 3 m straight edge.
Base and Sub Base Course
Base and Sub base courses are constructed in accordance with standard procedure contained in the
relevant IRC specifications like IRC: 37-2001.The material shall be evenly laid in required thickness as
specified in drawing and shall be watered, and consolidated to provide proper level and grade.
Placing and Screening of Bedding Sand
The thickness of the sand bed after compaction should not be more than 75 mm Bedding sand should
not be used to fill up local depressions on the surface of a base or sub base. The depressions should be
repaired in advance before placing sand. Sand to be used should have uniform moisture content of 6 to
8%. The processed sand is spread with the help of screed boards to the required thickness. The Screed
boards are provided with nails at 2-3m apart which when dragged gives the desired thickness. The sand
is subsequently compacted with plate vibrators weighing 0.6 tons or more. Level checks shall be carried
out on a grid pattern to establish that the desired level is achieved. Local correction can be done either
by removing or adding extra sand followed by levelling and compacting the layer.
Laying of Blocks
Blocks should be laid commencing from the edge strip and proceed towards the inner side. The
blocks can be placed to different bonds or patterns as directed by Engineer in Charge. With the help of
gauges, the joint width specification (2 to 4mm) should be checked in the first few square meters,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Uploading copy of Mini Sports Complex.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .