Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹75.0 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹78.4 L+₹3.5 L (4.60%)Rejected-Finance 252 GREEN CITY II BARNALA BYPASS ROAD BATHINDA BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | L-2 | Rejected-Finance L-2 |
Tender Value
₹87 L
EMD Value
₹1.6 L
Closing Date
25 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (AF) Bhisiana
HQ CWE (AF) Bhisiana-151201
CWE(BHI)/HAL- 08/2023-24 PROVISION OF ROADS AT VARIOUS LOCATIONS IN TECHNICAL AREA AT AF STATION HALWARA UNDER GE (AF) HALWARA
2023_MES_620158_1
CWE(BHI)/HAL-08/2023-24
Open Tender
Civil Works
Item Rate
273 days
AFS Halwara
As per cover 1
8 documents required · 8 mandatory
₹1,000
Yes
GE (AF) Halwara
₹1.6 L
Yes
2 Nov 2023
22 Sept 2023
27 Oct 2023
22 Sept 2023
25 Oct 2023
13 Oct 2023
Amount
Surface excavation (By Mechanical means) not exceeding 30cm deep and averaging 15cm deep and getting out soft/loose soil complete all as specified and directed.
Surface excavation (By Maually) not exceeding 30cm deep and averaging 15cm deep and getting out soft/loose soil complete all as specified and directed. Notes: (i) Layout chart indicating the passing of cables/pipes shall be provided by users and excavation will be carried out manually at sites where cable/pipes are passing and as directed by Engr-in-Charge. (ii) During excavation, if any cable/pipe is damaged, the same shall be repaired immediately by the contractor under their own arrangements. If it is not possible by the contractor to repair cable/pipe network , the same shall be repaired by the Air Force Authorities and rectification cost as prepared by AF authorities will be deposited in the amount of Air Force authorities withine one week by the contractor.
Surface dressing not exceeding 15cm deep and getting out soft/loose soil complete all as specified and directed.
Material and labour forming embankments of soil including raising (or lowering) earth spreading in layer n exc 30cm thick watering ramming/ rolling and finishing to required size, shape not exc 1.5m high from base etc complete all as specified and directed by Engineer-in-charge.
Removing excavated soil exceeding 1.5 km but n exc 5 km and depositing where direct at a level not exc 1.5m above the starting point etc. complete all as specified.
Rolling and consolidating formation surfaces in cutting and compacted to required gradient and camber with 8 to 12 tonne power roller complete all as specified and directed by Engineer-in-charge.
Material and labour 150mm (compacted thickness) granular sub base (GSB) layer, laid and compacted well graded material according to grades and cross-section required on ground and specified by Engineer-in-charge. The material to use is as GSB shall be natural sand, crushed gravel, crushed stone, crushed slag or combination thereof depending upon the grading required. The materials shall be free from organic or other deleterious contents spread, rolled with 8 to 12 tonne power roller and consolidated to gradient and camber required etc complete all as specified and directed by Engineer-in-charge.
Material and labour 150mm thick (compacted thickness) WMM in two layer of 75mm thick each layer with coarse crushed aggregate of grading 2 (63 to 40mm size) and grading 3 (50 to 20mm size) with granite trap or basalt, spread, rolled with 8 to 12 tonne power roller and consolidated to gradient and camber required etc complete all as specified and directed by Engineer-in-charge.
Material and labour for continuous brick edging with width equal to the width of the brick, laid dry on end vertically with burnt clay brick of sub class "B" old size bricks including necessary earth work embadding brick in the ground to required depth indicating and tampering ground around bricks also removing any surplus soil to a distance n exc 50m complete all as specified and directed by Engineer-in-charge.
Preparing unsurfaced wet mix macadam by brushing with wire brushes for removing caked mud etc. Sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and directed.
Material and labour using and applying paving bitumen (VG-10) evenly a tack coat with bituminous primer at 10 kg per 10 sqm complete all as specified and directed by Engineer-in-charge.
Material and labour laying Bituminous premix semi dense asphaltic concrete 40mm thick consolidated thickness with paving bitumen (VG-30), binder content @5.5% by weight of total mix, including supply and mixing of filler (OPC cement) as per design mix spread using mechnical senser paver rolled and compacted with 8 to 12 ton power roller and compacted required camber and gradient complete all as specified and directed. Notes : (i) Hot mix plant of adequate capacity shall be used for heating and mixing of aggregates and binder (bitumen) for bituminous carpet. Premixed carpet shall be laid in single layer with mechanical sensor paver all as specified and directed. (ii) The consolidated thickness indicated above shall be the minimum thickness and in case additional materials are required to make good the depressions etc to achieve the required camber & slope etc, the same shall be provided by the contractor and the cost of the same shall be deemed to be included in the quoted rates of the above item. (iii) The design mix shall be carried out from zonal lab/ Govt Engg College as approved by GE before incorporation in work and testing charges shall also born by the contractor.
Material and labour for hot thermo plastic (reflective) road marking paint as per table 800-3800-4 of morth, applied in uniform thickness, marking lines/ stripes on road with thermo plastic paint (tint as approved by GE) by hot mixing method as per specifications heating with gas to achieve minimum uniform thickness 1.5mm using paint material @ 650 gm/Sqm and glass beads @ 250 gm/Sqm. Morth specification 803 shall be followed strictly for execution of work and suitable machine shall be used for the marking as approved by GE. Note : The rate included for preparation of bitumen surface, removing dust, dirt grease and other foreign matters etc. to receive the marking.
Supply and fixing cat eyes solar reflective type of metal body of size 100mm x 100mm x 20mm with PAMA striplens reflector of model no DA 972.0 fixed with and including of MS stud of suitable size as per manufacturer instructions & complete all as specified and directed by Engineer-in-charge.
M/s Azure Infrastructure Construction Co.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .