| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.2 L+₹32,821.70 (8.45%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹4.2 L+₹35,570.60 (9.15%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹4.3 L+₹45,381.50 (11.7%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
₹4.2 L
EMD Value
₹10,583
Closing Date
12 Feb 2024, 5:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER OFFICE MELATTUR GRAMA PANCHAYATH
In this project provision for concrete side protection wall for a continuous length of 40 m from ch 0/ 110 is proposed . Concrete side wall of height 2.4 mht for a length of 13m and 1.5m height for a length of 27 m are included in this estimate.
2024_LSGD_654036_2
34/AE/LID/EW/ 2023-24
Open Tender
Civil Works - Roads
Item Rate
MELATTUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,583
Yes
11 Apr 2024
3 Feb 2024
14 Feb 2024
3 Feb 2024
12 Feb 2024
3 Feb 2024
Amount
Side Protection Works
3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
OD277270/2023-2024:[OD from MORD 11.4.1.1] - Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. P.C.C grade M 10 &lt;br&gt; (i) Nominal mix 1:3:6 (excluding form work)
11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD277271/2023-2024:[OD From DAR 60.6] - PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
KINZ CONSTRUCTIONS
C.T Construction
ABDUL NASER V
Bidder Name
MUHAMMED RAFEEQ
C.T Construction
KINZ CONSTRUCTIONS
ABDUL NASER V
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1008505.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .