Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.3 Cr
EMD Value
₹12.3 L
Closing Date
25 Nov 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Damanganga Project Division No.1, Madhuban Colony.
Replacement of Rubble Pitching on the Upstream (U/S) and Downstream (D/S) Slopes of the Right-Side Earthen Dam of Madhuban Dam of Damanganga Reservoir Project.
362178
14 of 2026-27
Open
Civil Works
Works
Dadra and Nagar Haveli
11 documents required · 10 mandatory · 1 optional
₹18,000
Executive Engineer, Damanganga Project Division No.1, Madhuban Colony.
₹12.3 L
3 Nov 2026
3 Nov 2026
3 Nov 2026
25 Nov 2026
3 Nov 2026
120 days
Sr. No. Quantity Unit Rate Amount
(with brief specification and reference to book of specifications)
Item No.1 Dismentalling the existing dry rubble pitching of different thickness and stacking
the dismentalled materials & Extra Labour Charges For stacking The useful
materials at Site as and where directed including cleaning the slope for all leads
and lifts. 8(A) For 20 cm thickness
Item No.2 Dismentalling the existing 60 Cm thickness Rip rap rubble pitching of upstream
slope of dam Without damaging the 37 cm Th. Filter backing and stacking the
dismentalled materials & Extra Labour Charges For stacking The useful 92042.10 Sqmt 202.77
materials at Site as and where directed including cleaning the slope for all leads
and lifts.
Item No.3 Dismentalling the existing brick masonry including sorting out and stacking the
useful materials and removing the debries and making good the damage etc. 708.40 Cum. 757.40
complete as directed.
Item No.4 Dismentalling the existing foundation concrete including disposing the
dismentalled stuff including sorting out and stacking the useful materials and 485.10 Cum. 1165.20
removing the debries and making good the damage etc. complete as directed.
Item No.5 Dismentalling the existing R.C.C.pipes of the following diameter including sorting
out and stacking of the useful materials including refilling the trenches etc. 108.00 Rmt 582.60
complete as directed.(NP-2 pipes) 450 mm to 600 mm dia.
Item No.6 Excavation in all sorts of soil and soft murum for trenches and pits including
disposing off the excavated materials as and where directed within lead of 50 4891.30 Cum. 288.80
meter and all lifts etc.complete.
Item No.7 Providing and laying yellow soil earth in canal section before laying C.C. block for
lead up to 5.00 K.M. and all lifts.
20 cms including watering temping with suitable hand rammer etc. complete as 7336.90 Cum. 69.91
Item No.9 Labour Charges For laying dry rubble pitching of various thickness to required
grade including trimming of earth work , hand packing the interstices with spauls,
filling earth in interstices panneling complete for all leads and lifts.(a) 300mm 19565.00 Sqmt 179.50
thick Rubble stone pitching.
Item No.10 Providing and laying dry rubble pitching of various thickness to required grade
including trimming of earth work , hand packing the interstices with spauls, filling 78259.70 Sqmt 455.50
earth in interstices panneling complete for all leads and lifts.(a) 300mm thick
Rubble stone pitching.
Item No.11 Labour Charges for laying Rip-rap pitching on upstream slope of dam including
hand packing, trimming of slope etc. complete with all leads and lifts for following 55225.30 Sqmt 138.69
thickness.(a) For 60 cm thickness
Item No.12 Providing and laying rubble rip rap on upstream slope of dam including hand
packing, trimming of slope etc. complete with all leads and lifts for following 36816.80 Sqmt 606.10
thickness.
6(C) For 60 cm thickness
Item No.13 Conveyance of unusable rubble stone / boulder generated from upstream and
downstream slopes to the approved disposal site within 1.0 km lead by tractor-
trolley, including mechanical loading by hydraulic excavator / loader, unloading 35785.60 Cum. 67.90
at disposal site, incidental handling, fuel, operator, labour, supervision, and all
other charges complete as directed.
Item No.14 Providing and fixing in position (different diameter) I.S NP3 class reinforced pipe
with caulking the joints with cement mortar 1:1 proportion using jute string
soaked in cement slurry, finishing joints, and laying pipes to the designed grade 108.00 Rmt 1196.60
and levels, curing etc. complete for all lead and lifts.
(b)NP3 class 450mm dia pipe.
Item No.15 Excavation for foundation upto 1.5 m depth including sorting out and stacking of
useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) 358.40 cu.mt. 261.73
Dense or Hard soil
Item No.16 Providing and laying Plain/Reinforced cement concrete of cement, sand and metal
(above 12mm & upto 20mm size) in following proportion laid in situ including
centering,shuttering, temping, smooth finishing, curing etc. complete as directed
for all leads and lifts(Manually With Conventional Mixer)
Item No.17 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding cost
of formwork and reinforcement for reinforced concrete work in (A) Foundations,
footings, Base or columns and Mass concrete
Item No.18 Provide, supplying & laying Precast Concrete Drain Of Inner Size of 300 X
mm, Before laying drain, provide bedding layer of Mortar of 1:3 proportion of
uniform depth of 20 cm & Filling The joints between the 2 drain including 6215.30 Rmt 1771.20
Transportation, Loading-unloading of Drain & etc. all Compelete as per direction
Of Engineer-In-Charge.
Item No.19 Providing and laying burnt brick (conventional size) masonary for foundation in
ordinary portland cement mortar 1:5 proportion including racking out joints upto 81.70 Cum. 5181.10
15mm depth curing etc. complete for all lead and lifts.
Item No.20 Providing and placing in position reinforcement bars including cutting, bending
welding, joints where necessary, hooking etc. complete as per drawing for all lead 295.30 Qtl 7194.00
and lifts.(b) TMT
Item No.21 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of the 316.20 sq.mt 338.35
same for in situ reinforced concrete and plain concrete work in. (M) Staircase
with sloping or stepped soffits including risers and stringers excluding landing.
Item No.22 Providing and laying controlled cement concrete M.150 for curing complete
excluding cost of formwork and reinforcement for reinforced concrete work in (E) 240.20 cu.mt 5169.29
Staircases excluding landing upto floor two level
Item No.23 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding cost
of formwork and reinforcement for reinforced concrete work in (B) Slabs, 129.90 cu.mt 4038.02
landing, shelves, Balconis , Lintels, Beams, Girders and Cantilever upto floor two
Item No.24 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of the
same for in situ reinforced concrete and plain concrete work in. (H) (1) Sides and
soffits of Beams Beam Haunchings cantilevers Girders Bressumers and Lintels not
exceeding 1 M. in Depth.
Item No.25 Providing cement plaster in various thickness and proportion including smooth
finishing, curing, scaffolding etc. complete for all leads and lifts as under. (a)
Cement mortar 1:3 proportion.
(i) 20mm thick.
Item No.26 Providing & fixing in position sign board of standard size of 1.20mx0.90m with
M.S angle 40mmx40mmx6mm with 3mm thick iron plate including fixing in
1:5:10 prop. Concrete block size 40cmx40cmx75 cm including painting existing 1.00 No. 3011.30
data on the board etc. complete as directed.
Item No.27 Providing videography on the occasion of function or for on going consruiction
work including dubbing, titeling etc. complete including cost of cassette/ CD. 1.00 4 Hrs. 1230.51
(b) upto 4 hrs
Rs. Twelve Crore Twenty Seven Lakh Fourty Seven Thousand one hundred four and
fourty nine Paise Only.
Total Rs.=
(A) Percentage Rate Tender (Upto INR 50Cr.)
I/We am/are willing to carry out the work at _____________ % above/below percent(Should be written in figures and words) of the
estimated rate mentioned above. Amount of my /our tender works out as under.
Estimate Amount Estimate Amount
put to tender Rs.122747104.49 put to tender Rs.122747104.49
Deduct___________ % below Add___________ % Above
( If any) ______%
Net ( in Figure)___________ Net
( In words) ________________ ( In words) ________________
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
Deputy Executive Engineer Divisional Accountant Executive Engineer
Damanganga Dam & Reha Sub Dn. Damanganga Project Div No.1 Damanganga Project Div No.1
Madhuban Colony Madhuban colony Madhuban colony
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
cross section of earthen dam.pdf
SBD Right side Rubble pitching.pdf
Schedule B Rubble.pdf
Specification Right side Rubble pitching Final 2509.pdf
corrigendum1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .