| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹4.2 Cr−₹12.2 L (2.91%)Accepted-AOC GOVERNMENT OF TRIPURA OFFICE OF THE EXECUTIVE ENGINEER DRINKING WATER AND SANITATION DIVISION UDAIPUR GOMATI DISTRICT TRIPURA | ₹4.2 Cr−₹12.2 L (2.91%) Quoted ₹4.1 Cr | L2 | Accepted-AOC Since L1 is informal therefore L1 is awarded the work |
| 2 | L1₹4.2 CrRejected-Finance | ₹4.2 Cr | L1 | Rejected-Finance Rejected due to insufficient documents |
Tender Value
₹4.3 Cr
EMD Value
₹8.5 L
Closing Date
1 Jun 2026, 3:00 pmClosed
Executive Engineer, TWD
Directorate of TW, PNComplex, Gurkhabasti
SH Building portion G plus 1 including internal water supply sanitary installation SBDTW and boundary wall during the FY 2025 26
2026_DTWJD_73044_1
03/DNIeT/EE/DIR/SEC/TWD/26-27
Open Tender
Civil Works
Percentage
540 days
Champaknagar
Please refer to DNIeT
4 documents required · 4 mandatory
₹8,000
₹8.5 L
Yes
Directorate of TW, PNComplex, Gurkhabasti
27 Aug 2026
18 May 2026
1 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
18 May 2026 - 30 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | S.H.: EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | 920.84 | Cum | 231.6 | ₹2,13,266.54 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -All kinds of soil | 1,125 | Cum | 179.9 | ₹2,02,387.5 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | 613.89 | Cum | 161.3 | ₹99,020.46 |
| 4 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete | 317.22 | Cum | 338.6 | ₹1,07,410.69 |
| 5 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 166.2 | Cum | 1,177.3 | ₹1,95,667.26 |
| 6 | Supplying chemical emulsion in sealed containers including delivery as specified.
a)Chlorpyriphos/Lindane emulsifiable concentrate of 20% | 174.1 | Litr | 225.6 | ₹39,276.96 |
| 7 | Treatment of soil under plinth filling using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with sand filling:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. | 641.6 | Sqm | 127.3 | ₹81,675.68 |
| 8 | Diluting and injecting chemical emulsion for POSTCONSTRUCTIONAL anti-termite treatment as per IS: 6313 (Part III)- Latest revision (excluding the cost of chemical emulsion):
Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres/sqm of the vertical surface of the substructure to a depth of 300 mm including excavation channel along the wall & rodding etc. complete:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 121.8 | Mtr | 18.9 | ₹2,302.02 |
| 9 | S.H.: CEMENT CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
a) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 129.3 | Cum | 8,980 | ₹11,61,114 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
b) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size | 7.34 | Cum | 10,249.1 | ₹75,228.39 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Final_Lokashikhshalaya_DNIeT.pdf
Tender Documents • 3.38 MB
AdditionalTenderDocuments.pdf
Additional Documents • 5.86 MB
BOQ_74336.xls
BOQ • 0.56 MB
C3.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .