Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance 295 BARRACKPORE I G W T P GATE NO 2 J N SINGH ROAD VILLAGE TOWN MONIRAMORE CITY BARRACKPORE NORTH 24 PARGANAS WEST BENGAL 700120 INDIA | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | L1 | Admitted-Finance | ||
| 2 | L2₹3.0 L+₹2,979.72 (1.00%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.0 L+₹5,959.45 (2.00%)Admitted-Finance MY SIDDHE SANNITALA ROAD MAMIRAMPUR BURRACKHUR KALKATA 700120 | KOLKATA | WEST BENGAL | 700001 | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
17 Aug 2026, 1:00 pmClosed
EE/IGWTP
IGWTP, Monirampore, Barrackpore, Kol-120
MAINTENANCE OF THE SURROUNDING AREA OF THE SAND AND GRAVEL STACKYARD PREMISES AND SURFACE DRAIN ALONG THE SOUTHERN ALIGNMENT OF THE EXTENSION SERIES SSFB UNITS AT IGWTP
2026_KMC_1036185_1
KMC/IGWTP/026/26-27, DT-27.07.2026
Open Tender
CIVIL WORKS
Percentage
IGWTP/BARRACKPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
IGWTP, Monirampore, Barrackpore, Kol-120
28 Sept 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
17 Aug 2026
10 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | PART-A | - | - | - | - |
| 1 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | 11,388 | SQUARE METER | 11 | ₹1,25,268 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 1.Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 600 | SQUARE METER | 10 | ₹6,000 |
| 3 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 10)Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr. Note : For lift beyond initial 6 mtr. the rate will be increased @ 20% for each additional lift if 6 mtr. or part thereof. | 220 | EACH | 50 | ₹11,000 |
| 4 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 10)Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (b)medium size plant of girth of exposed stem upto 75 mm. but not exceeding 150mm, lift upto 6 mtr. Note : For lift beyond initial 6 mtr. the rate will be increased @ 20% for each additional lift if 6 mtr. or part thereof. | 200 | EACH | 60 | ₹12,000 |
| 5 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 10)Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (c) large plant of girth of exposed stem above 150mm. but not exceeding 225mm lift upto 6 mtr. Note : For lift beyond initial 6 mtr. the rate will be increased @ 20% for each additional lift if 6 mtr. or part thereof. | 180 | EACH | 187 | ₹33,660 |
| 6 | BUILDING WORKS (B) DISMANTLING CUTTING CHASE HOLES ETC 13, Removal of rubbish earth etc from the working site and disposal of the same beyond the compound in conformity with the Municipal / Corporation Rules for such disposal loading loading into truck and cleaning the site in all respect as per direction of engineer in charge | 350 | CUBIC METER | 166 | ₹58,100 |
| 7 | SECTION 1 …….. BUILDING WORKS (J) WHITE WASH COLOUR WASH DISTEMPER A ORIGINAL WORKS 1 white washing including cleaning and smoothening surface throughhly. All floors b) Two Coats (to be done on specific instruction)) | 2.2 | PER 100 SQUARE METERS | 1,814 | ₹3,990.8 |
| 8 | Sum of Basic Prices (Sl No-1 to 7) | - | - | - | - |
| 9 | GST @ 18% on the Sum of Sl. No- 8 | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
TECHBID026.pdf
Tender Documents • 1.24 MB
BOQ_2545469.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .