Executive Engineer, Panam Project Division, Godhra
THE WORK OF THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF QAP FOR (I) LIFTING WATER FROM PANAM RESERVOIR BY INTAKE WELL AT SAGWADA & ALU VILLAGE. (II) LIFTING WATER FROM SANTROAD WEIR. (III) OPERATION AND MAINTENANCE OF L.I. PROJECT FOR 5 YEARS.
304939
1 of 2026-27
Open
Civil - All
Panchmahal
1 document required · 1 mandatory
₹900
Executive Engineer, Panam Project Division, Godhra
₹23,000
13 May 2026
13 May 2026
13 May 2026
22 May 2026
13 May 2026
NAME OF WORK: THE WORK OF THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY
FOR THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN
REVIEW INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS,
REVIEW OF QAP FOR (I) LIFTING WATER FROM PANAM RESERVOIR BY INTAKE WELL AT
SAGWADA & ALU VILLAGE. (II) LIFTING WATER FROM SANTROAD WEIR. (III) OPERATION AND
MAINTENANCE OF L.I. PROJECT FOR 5 YEARS
FINANCIAL BID PROPOSAL i.e. PRICE BID
Last date of downloading the tender: -- 2025 up to 00.00 Hrs.
Last date of Submitting the tender: -- 2025 up to 00.00 Hrs.
Date of Opening the Tender: - - 2025 @ 00.00 Hrs.
Executive Engineer,
Panam Project Division,
Civil Lines Road
SECTION - 1 FINANCIAL PROPOSAL - STANDARD FORMS
BIDDERS ARE REQUIRED TO FILL UP ALL BLANK SPACES IN THIS BID FORM
The Executive Engineer,
Panam Project Circle, Godhara.
SUB: THE WORK OF THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR THE
SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN REVIEW
INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW
OF QAP FOR (I) LIFTING WATER FROM PANAM RESERVOIR BY INTAKE WELL AT SAGWADA & ALU
VILLAGE. (II) LIFTING WATER FROM SANTROAD WEIR. (III) OPERATION AND MAINTENANCE OF
L.I. PROJECT FOR 5 YEARS
1. Having visited the site and examined the Bid Documents, Conditions of Contract, Schedules, Preamble to
INSPECTION SERVICES OF THE ABOVE WORK, we the under signed offer our inspection services from the
date of commissioning including defects liability period as given in Conditions of Contract and in
Schedules, Annexure, Bidding Documents, ifor Lump Sum fixed price mention in the summary cost. Our
financial proposal shall be fixed and firm binding upon us subject to the modifications resulting from
contract negotiations up to expiration of the validity period of the proposal. The amount of consultancy
services is inclusive of all taxes, duties, service charges etc.
2. We undertake, if our Bid is accepted, to complete and deliver the Works In accordance with the Contract
within 15 months or till the Project Implementation period, inclusive of monsoons, from the date of receipt
of work order to us by you. We will observe the laws applicable to perform the services.
3. We agree to abide by this Bid for a period of 180 days from of opening of online Bid the date fixed for
receiving the same and it shall remain binding upon us and may be accepted at any time before the expiry
of that Period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement with you
incorporating the conditions of Contract there to annexed and conditions of form “C” but until such
agreement is prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
5. We agree, if our Bid accepted, to furnish Performance Bond / Security in the forms and of value specified
in the Conditions of Contract of a sum equivalent to Rs. 1,14,125/- for due performance of the Contract.
6. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
The bid is lump sum bid for THE WORK OF THIRD-PARTY INSPECTION/PROJECT MANAGEMENT
AGENCY FOR THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND
DESIGN REVIEW INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY,
EQUIPMENTS, REVIEW OF QAP FOR (I) LIFTING WATER FROM PANAM RESERVOIR BY INTAKE
WELL AT SAGWADA & ALU VILLAGE. (II) LIFTING WATER FROM SANTROAD WEIR. (III)
OPERATION AND MAINTENANCE OF L.I. PROJECT FOR 5 YEARS
The bidder shall quote his firm and fixed lump sum price for the entire work under this Contract,
defined in more details in various sections of this bid document & form “C” of Lump sum
1. The rates and prices shall be submitted in the formats given in then closed Price
Schedules. Rates and prices received in any other formats will be rejected and the Bids
will be disqualified.
2. It will be entirely at the discretion of the NWRWS & KD to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bidon this account.
Schedule only will be considered for price evaluation & shall form a part of the Contract
4. Each item is to be individually priced, and the amounts shall be added up to arrive at the
except where the item description requires the item to be priced on "as applicable" basis.
The item shall not be priced if it is "not applicable" to the bidder's design, in which case
the bidder shall add the words "NOTAPPLICABLE". The wording in the item description
is for subject matter guidance only: clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the works covered
under the bid and all liabilities and contractual obligations whether separately specified
or not. Items against which no prices are quoted shall not be separately paid for and the
bidder shall be deemed to have covered the cost for execution of such items (according
to the requirements of the bid document) in the prices quoted for the other items.
satisfactory working of the system as specified, will not be separately paid for by the
NWRWS & KD when executed and shall be deemed to be already covered by other items
and rates listed in the price sheets and Lump sum prices quoted in Schedule.
6. Interim payment will be made as per break up given in the Price document.
Schedules shall be the basis to work out a schedule of Interim payments during
construction with the successful bidder.
8. The Consultant shall be deemed to have allowed in his price for provision, maintenance
and final removal of all temporary works of whatsoever nature required for the
inspection services for the proper execution of works. The rates shall be deemed to
include any works and setting out that may be required to be carried out for laying out
of all the works involved.
9. Prices shall be entered online and shall be entered in figures and in words. Where there
is a discrepancy between the unit rates and the amount entered, the latter shall govern.
Specifications and the other sections of these bid documents and these documents are
to be taken as mutually explanatory of one another.
11. Prices quoted by the Consultant shall be firm for the entire consultancy work of Contract
without any escalation or extra payment than tendered cost. The Quoted price should be
match with Annexure E and COST SUMMARY SCHEDULE.
12. The Consultant shall interpret the data furnished if any additional survey work or
investigation required shall be carried out by EPC Contractor.
13. The Consultant should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at his
own cost. These accessed will be used by the other contractors working for NWRWS &
KD/ Government.
COST SUMMARY SCHEDULE
FORM OF FINANCIAL PROPOSAL
4.0 Summary of costs (Lump - sum fix price)
Description of Services Amount in Rs. lacs
In Figure In words
THE WORK OF THIRD-PARTY
INSPECTION/PROJECT MANAGEMENT AGENCY
FOR THE SERVICES OF PROJECT MANAGEMENT,
CONSTRUCTION, SUPERVISION AND DESIGN
REVIEW INSITE/OFFSITE INSPECTION &
TESTING OF MATERIALS, MACHINERY,
EQUIPMENTS, REVIEW OF QAP FOR (I) LIFTING
WATER FROM PANAM RESERVOIR BY INTAKE
WELL AT SAGWADA & ALU VILLAGE. (II) LIFTING
WATER FROM SANTROAD WEIR. (III)
OPERATION AND MAINTENANCE OF L.I. PROJECT
General Manager ````` Authorized person of Inspecting Firm.
Executive Engineer
Panam Project Division,
Pre Construction Design Review & Construction Supervi Inspection of materials Post Construction Total
Acti vity sion & allied activities machineries and Activities & DefectCor
equipment rectionPeriod
Minimum experience required
Sr.No Remunerati Remunerat Durationof Remunerat Durationof Remunerat Durationof Remunerati Remunerat
onpermont ionpermon Engageme ionpermon Engageme ionpermon Engageme onpermont ionpermon
Requirem Duratione h,(allinclusi DurationofE th,(allinclu nt(Days) th,(allinclu nt(Days) th,(allinclu nt(Days) h,(allinclusi Months th,(allinclus Total
entsinPr ngagemen ve) ngagement( sive) sive) sive) ve) ive)
Part-A(Personals)
Graduate In Civil / Mechanical engineering with over 10 years’
1 Team Leader experience in M.S. / HDPE / DI pipeline project monitoring of
water supply projects, preferably having design/office
experience and having handled projects of similar nature
2 Senior Structural Engineer Postgraduate in Structural Engineering with 05 years’ experience.
Graduate Mechanical engineer with over 05 years’ experience in
3 Senior Mechanical Engineer design & inspection of Pipe Manufacturing, Valves and pumping
machineries etc.
Graduate Electrical Engineer with over 05 years’ experience in
4 Senior Electrical Engineer electrification of pumping station and 66kv substation etc
Graduate in Hydraulics/Civil/ Mechanical Engineering with over
Water Supply & Pipeline
5 years of experience of Similar nature.
Graduate Civil / Mechanical engineer /B.Sc. with over 05 years’
6 Safety Engineer experience as Safety Engineer.
Graduate with over 2 years of experience or diploma with over
7 Site Supervision Staff years’ Experience of site pipeline work of similar nature.
Mechanical (Mini. Two Engineer should have ASNT level-II in
(ii) UT(PAUT) as per SNT-TC-1A OR ASNT Level III in UT
8 Additional Staff
i. B.C.A. with 1 year experience
Computer Operator
Ii Surveyor Diploma Civil with minimum of 2 years’ Experience of experience
or ITI Surveyor having 2 years of experience
Iii Office Assistant B.A. / B.Com
iv ROU Supervisor Experience in ROU or similar nature of work
Part-B(OtherExpanses)
1 TRANSPORTATION(i)Twowheeler
TRANSPORTATION(ii)Fourwheeler
2 COMMUNICATION L.S.
3 OFFICEEXPANCESINCLUDINGRENTANDOTHEROVERHEADS L.S.
4 STATIONERYEXPANCESINCLUDINGALLCONSUMABLES L.S.
5 Any other expenses if any L.S.
Schedule of Payment
The breakup of consultancy services shall be as under:
Name of activity price in Amount in Rs.
1 Pre contract activity such as 2%
review report on E.P.C
contract, Submission of
methodology work plan pert
chart required format of
progress report, deploying
required staff at site, review
of working survey & setting
out the line out of work etc.
On completion of Design
approval of structure ,QAP
2 hydraulic of pipeline 10 %
approval of G.A.D. of
On completion of Inspection
& procurement of pipeline 10 %
On Completion of Inspection
of valves mechanical and 10 %
electrical equipment
pumping machineries etc.
On completion of Labour for 30 %
5 lowering, laying pipeline with
excavation, refiling ROU
including installation of
On completion of erection of 15%
pumping machineries,
mechanical, electrical
Instrumental equipment etc.
On completion of Thrust 3%
Block, Encasing, Pushing
,Road Reinstatement,
On completion of 15%
satisfactory hydraulic testing
and commissioning of the
project and NOC of ROU & on
satisfactory completion of
On completion of 5%
rectification of defect
9 observed & Post completion
of project including defect
liability period
1. The amount is to be paid on basis of work done. Payment is to be made as per
progress of work done. The hydro test payment is to be made after carrying out of
2. The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Note. The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Executive Engineer
Panam Project Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Vol-1 Pre Qualification and technical Proposal.pdf
Vol-2 Financial Bid - Price bid TPI.pdf
Vol-2 part - 2 - C - Form TPI.pdf
Vol-3 Technical Bid TPI.pdf
Download all tender documents and submit your bid