Tender Value
₹12.6 Cr
EMD Value
₹25.1 L
Closing Date
31 Aug 2026, 6:00 pm
CE WR ZONE KOTA
CE WR ZONE KOTA
Construction of Solar Based Chandrawala Micro Irrigation Project Phase-II Tehsil Digod, District Kota
2026_WRDAS_584373_1
CE WR ZONE KOTA NITNO-11/2026-27
Open Tender
Civil Works
Item Rate
730 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE WR DIV. KOTA
₹25.1 L
Yes
CE WR ZONE KOTA
8 Aug 2026
8 Aug 2026
1 Sept 2026
8 Aug 2026
31 Aug 2026
8 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design Build cost of all Project Coponents (Sum of amount calculated in Schedule 1 to 6) | - | Nos | 100 | - |
| 2 | Annual Operation and Maintenance Cost for 8 years for complete scheme
(as Calculated in Schedule 7) | - | Nos | 100 | - |
| 3 | This Price bid comprises of Two parts
Part-I Cost for planning, design- build of all civil, electro mechanical and instrumentation work for all project components
Part-II Cost for operation and maintenance during O&M period of 8 years of complete scheme
Note:-
1) Rates quoted by the bidder in the financial bid Proposal Sheets shall be evaluated.
2) The Acceptance letter / work order shall be issued to successful bidder for the final cost quoted by the bidder for part I & Part II
3) The bidder shall quote the rates for design build & O&M works considering all cost inflation factor, as escalation shall not be paid seperately
4) The Cost of Part-II shall not be less than 3.00% of the cost of Part -i ( Rate quoted by bidder) 5) After award of work, owner may revise any or all individual Break up of schedule or its component within the total accepted price limit, which shall be binding on contractor. 6) Each price Break up schedule is subjected to revision after approval of design/ drawing by the owner. The contactor or Engineer in Charge will submit revise price schedule to owner for approval. However, original price schedule or its revision from competent authority shall not absolve the responsibility of contractor towards satisfactory completion & performance of any or all the works required for satisfactory complerion/ performance of project irrespective of whether the quantity/ items is included or not in this BOQ. 7) Approval of this BOQ does not absolve the contractor from his responsibility of executing any/ all the works required for satisfactory complerion/ performance of project irrespective of whether the quantity/ items is included or not in this BOQ. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.29 MB
TECHNICAL-BID.pdf
Tender Documents • 1.90 MB
FINANCIAL-BID.pdf
Tender Documents • 5.20 MB
BOQ_1037880.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].